105025-4010 ZEXEL 9 432 612 786 BOSCH NOZZLE 9432612786 1050254010 3626205900


 

Information nozzle

BOSCH 9 432 612 786 9432612786
ZEXEL 105025-4010 1050254010
MITSUBISHI-HEAV 3626205900 3626205900
105025-4010 NOZZLE
Rating:
61
Buy NOZZLE 105025-4010 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-4010 
9 432 612 786 
NP-DLLA158SM401 
3626205900  MITSUBISHI-HEAV
NOZZLE
C




Information:

1. Remove nuts (1), cover (2), and the gasket. 2. Put No. 1 piston at the top center compression position (TC) with the following procedure:a. Remove plug (3), two bolts and cover (2) from the flywheel housing. b. Install Tool (B) in the flywheel housing. Use Tool (B) to slowly rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine), until timing bolt (4) can be installed in the flywheel housing and into the hole in the flywheel. c. Remove the valve cover from the valve cover base. Check to see if both rocker arms (5) for the No. 1 cylinder can be moved backward and forward. The No. 1 piston is at the top center compression position (TC) when the timing bolt is installed in the flywheel and both rocker arms for the No. 1 cylinder can be moved backward and forward. If both rocker arms cannot be moved, the No. 1 piston is not at the top center compression position (TC). Remove the timing bolt from the flywheel and rotate the engine in the direction for normal rotation, (counterclockwise as seen from the flywheel end of the engine one full turn 360 degrees, and install the timing bolt again.3. Remove the timing bolt, and use Tool (B) to rotate the engine in the opposite direction of normal rotation (clockwise as seen from the flywheel end of the engine) a minimum of 30 degrees. The timing is correct if Tool (A) and the timing bolt can be installed at the same time. The timing procedure in the Testing & Adjustment Manual must be done again if the timing bolt and Tool (A) can not be installed at the same time.4. Remove the plug from the timing pin hole in the fuel injection pump housing. Install Tool (A) in the timing pin hole. 5. Remove eight bolts (6) and automatic timing advance (7). 6. Remove gear (9) from fuel injection pump camshaft (8).The following steps are for the installation procedure.7. Install gear (9) on fuel injection pump camshaft (8). 8. Install two 3/8 in 16 NC x 6 in (152.4 mm) long guide bolts (10). Space the guide bolts evenly.
There is a light spring located beneath the flyweight cover (12). Hold cover (12) while removing last nut (11). Slowly remove flyweight cover (12) to avoid dropping the spring.
9. Remove four nuts (11) and remove flyweight cover (12). 10. Put automatic timing advance (13) in position on the fuel injection pump camshaft, and install four bolts (14). Tighten bolts (14) just past finger tight. Remove guide bolts (15). 11. Install four nuts (16). Install Tool (C). 12. Tighten four knurled nuts (17) finger tight.
Do not use any tools to tighten the knurled nuts.
13. Install all mounting bolts (14) and tighten to 55 10 N m (41 7 lb ft).14. Loosen knurled nuts (17). Remove four nuts (16) and remove Tool (C).15. Install the spring and flyweight cover

Have questions with 105025-4010?





Group cross 105025-4010 ZEXEL

9 432 612 796 
NP-DLLA152SM400 
 
NOZZLE

Mitsubishi-Heav 

105025-4010  
9 432 612 786 
NP-DLLA158SM401 
3626205900 
NOZZLE

Mitsubishi 

9 432 612 793 
NP-DLLA157SM402 
ME755431 
NOZZLE

Isuzu 

9 432 612 800 
NP-DLLA141SM403 
1153113210 
NOZZLE

Mitsubishi-Heav 

9 432 612 798 
NP-DLLA160SM404 
3636101400 
NOZZLE

Komatsu 

9 432 612 794 
NP-DLLA137SM406 
6156113220 
NOZZLE
9 432 612 856 
NP-DLLA150SM407 
 
NOZZLE

Mitsubishi-Heav 

9 432 612 927 
NP-DLLA158SM408 
34A6006200 
NOZZLE
9 432 612 928 
NP-DLLA158SM409 
3776001100 
NOZZLE
Back to top