105025-2030 ZEXEL 9 432 610 670 BOSCH NOZZLE 9432610670 1050252030 236402670a


 

Information nozzle

BOSCH 9 432 610 670 9432610670
ZEXEL 105025-2030 1050252030
HINO 236402670A 236402670a
105025-2030 NOZZLE
Rating:
65
Buy NOZZLE 105025-2030 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

106673-3200 as NOZZLE

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-2030 
9 432 610 670 
NP-DLLA146SM203 
236402670A  HINO
NOZZLE
C




Information:

start by:a) remove fuel injection lines**This operation location is in the ENGINE DISASSEMBLY AND ASSEMBLY section. 1. Disconnect the fuel lines from fuel transfer pump (4) and fuel manifold (3). Disconnect fuel line (2) from the fitting. Disconnect the fuel return line to the tank at (1). Install plugs or caps on all fuel line openings.2. Disconnect drain line (5) from the governor housing. Move the fuel lines and drain line clear of the fuel injection pump housing and governor. 3. Remove bolts (6) that hold the oil manifold to the governor housing. 4. Remove cover (7) from the timing gear cover.5. Remove the bolt and washer that hold the timing gear to the camshaft in the fuel injection pump housing. 6. Install tooling (A) and loosen the timing gear on the camshaft in the fuel injection pump housing.7. Fasten a strap and hoist to the fuel injection pump housing and governor as shown. 8. Remove three nuts (8) and remove the fuel injection pump housing and governor. Weight is 25 kg (56 lb.).Install Fuel Injection Pump Housing And Governor
1. Be sure O-ring seals (1) and (2) are in position on the fuel injection pump housing and governor and put clean oil on the O-ring seals.2. Remove the cover on the fuel injection pump housing and install timing pin (A). Turn the camshaft until timing pin (A) goes in the groove in the camshaft as shown. 3. Fasten a strap and hoist to the fuel injection pump housing and governor and put in position on the timing gear plate and oil manifold (3). Install the three nuts that hold the fuel injection pump housing to the timing gear plate and the two bolts that hold the governor housing to oil manifold (3).
After the fuel injection pump housing and governor are installed on the timing gear plate be sure the rack is free to move. The O-ring seal on the drive end of the fuel injection pump can hold the rack and prevent free movement of the rack. If the rack does not move freely remove the fuel injection pump housing and governor and check the O-ring seal on the drive end of the fuel injection pump housing.
4. Install the bolt and washer (4) as shown to hold the timing gear to the camshaft. Install washer (4) with the larger outside diameter toward the bolt head. Tighten the bolt finger tight only.5. Use the following procedure to put the No. 1 piston at top center on the compression stroke. No. 1 piston at top center (TC) on the compression stroke is the starting point for all timing procedures. The engine is seen from the flywheel end when direction of flywheel rotation is given. Do not turn the flywheel backward. a) Remove plug (5) from the flywheel housing and the breather from the valve cover.b) Turn the flywheel counterclockwise until a 3/8"-16 NC bolt (6) at least 2.5 in. long can be installed in the flywheel through the hole in

Have questions with 105025-2030?





Group cross 105025-2030 ZEXEL

Isuzu 

9 432 611 470 
NP-DLLA156SM200 
1153112860 
NOZZLE
9 432 611 471 
NP-DLLA150SM201 
1153112591 
NOZZLE

Komatsu 

9 432 611 472 
NP-DLLA155SM202 
6166133120 
NOZZLE

Hino 

105025-2030  
9 432 610 670 
NP-DLLA146SM203 
236402670A 
NOZZLE
9 432 611 473 
NP-DLLA153SM205 
236402680A 
NOZZLE

Nissan-Diesel 

9 432 610 671 
NP-DLLA150SM206 
16620Z5614 
NOZZLE

Hino 

9 432 611 484 
NP-DLLA150SM207 
236402690A 
NOZZLE
9 432 612 641 
NP-DLLA133SM208 
 
NOZZLE

Komatsu 

9 432 611 475 
NP-DLLA133SM208 
6212163320 
NOZZLE

Isuzu 

9 432 610 864 
NP-DLLA144SM209 
1153112870 
NOZZLE
Back to top