105025-2010 ZEXEL 9 432 611 471 BOSCH NOZZLE 9432611471 1050252010 1153112591


 

Information nozzle

BOSCH 9 432 611 471 9432611471
ZEXEL 105025-2010 1050252010
ISUZU 1153112591 1153112591
105025-2010 NOZZLE
Rating:
63
Buy NOZZLE 105025-2010 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-2010 
9 432 611 471 
NP-DLLA150SM201 
1153112591  ISUZU
NOZZLE
A 50LC NOZZLE N (DLL-S) N




Information:

2. Disconnect the fuel lines from fuel transfer pump (1).3. Remove two bolts (2) and fuel transfer pump (1). 4. Be sure O-ring seal (3) is in position on the fuel transfer pump and put clean oil on the O-ring seal.5. Put the fuel transfer pump in position on the fuel injection pump and install the two bolts that hold it in place.6. Connect the fuel lines to the fuel transfer pump.7. Open the fuel shutoff valve at the fuel tank.Disassemble Fuel Transfer Pump
start by:a) remove fuel transfer pump
Cover (2) is under spring tension.
1. Carefully remove bolts (1) and cover (2) from the fuel transfer pump. 2. Remove spring (3), valve (4) and O-ring seals (5) from the cover. 3. Remove springs (6) and (7) from the pump housing. 4. Remove sleeve (8) from the pump housing. 5. Remove sleeve (12), piston (16), O-ring seal (11) and piston (9) from sleeve (8). Remove plate (15), valve (10) and seal (14) from piston (9). Remove O-ring seal (13) from sleeve (8). 6. Remove O-ring seal (17) from the pump housing. 7. Push guide (18) through the pump housing and remove guides (23) and (18) together. Remove rod (20), guide (23), O-ring seal (19) and tappet (21) from guide (18). Remove ring (22) from tappet (21). 8. Remove connector (24), valve (26) and seal (25) from the pump housing. 9. Remove plug (30), spring (28), valve (29) and seal (27) from the pump housing.Assemble Fuel Transfer Pump
1. Clean all parts and be sure all passage are open. 2. Be sure the O-ring seal is in position on plug (4) and put 4L7464 Silicone Grease on the O-ring seal. Valves (2 and 6) must be installed as shown for the pump to work correctly.3. Install seal (1), valve (2), spring (3) and plug (4) in the pump housing as shown. Tighten plug (4) to a torque of 20 7 N m (15 5 lb.ft.). 4. Be sure the O-ring seal is in position on connector (7) and put 4L7464 Silicone Grease on the O-ring seal.5. Install seal (5), valve (6) and connector (7) in the pump housing as shown. Tighten connector (7) to a torque of 55 10 N m (40 7 lb.ft.). 6. Install the ring on tappet (8). Install tappet (8), O-ring seal (12), guide (9) and rod (10) in guide (11). Put 4L7464 Silicone Grease on O-ring seal (12). Install guides (11) and (9) as a unit in the pump housing as shown. 7. Install O-ring seal (13) in the pump housing and put 4L7464 Silicone Grease on the O-ring seal. 8. Install seal (15), valve (19) and plate (16) in piston (14) as shown. Install piston (14), O-ring seal (17), piston (20) and guide (21) in guide (18) as shown. Install the O-ring seal on guide (18) and put 4L7464 Silicone Grease on O-ring seal (17) and the O-ring seal on guide (18). 9. Install guide (18) in the pump housing as shown.

Have questions with 105025-2010?





Group cross 105025-2010 ZEXEL

Isuzu 

9 432 611 470 
NP-DLLA156SM200 
1153112860 
NOZZLE
105025-2010  
9 432 611 471 
NP-DLLA150SM201 
1153112591 
NOZZLE

Komatsu 

9 432 611 472 
NP-DLLA155SM202 
6166133120 
NOZZLE

Hino 

9 432 610 670 
NP-DLLA146SM203 
236402670A 
NOZZLE
9 432 611 473 
NP-DLLA153SM205 
236402680A 
NOZZLE

Nissan-Diesel 

9 432 610 671 
NP-DLLA150SM206 
16620Z5614 
NOZZLE

Hino 

9 432 611 484 
NP-DLLA150SM207 
236402690A 
NOZZLE
9 432 612 641 
NP-DLLA133SM208 
 
NOZZLE

Komatsu 

9 432 611 475 
NP-DLLA133SM208 
6212163320 
NOZZLE

Isuzu 

9 432 610 864 
NP-DLLA144SM209 
1153112870 
NOZZLE
Back to top