105025-1000 ZEXEL 9 432 610 653 BOSCH NOZZLE 9432610653 1050251000 8943905350


 

Information nozzle

BOSCH 9 432 610 653 9432610653
ZEXEL 105025-1000 1050251000
ISUZU 8943905350 8943905350
105025-1000 NOZZLE
Rating:
52
Buy NOZZLE 105025-1000 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-1000 
9 432 610 653 
NP-DLLA158SM100 
8943905350  ISUZU
NOZZLE
C 50LC NOZZLE N (DLL-S) N




Information:

Start By:a. remove timing gear case cover1. Put the No. 1 piston at top dead center on the compression stroke. Be sure all the timing marks are in alignment with each other. 2. Remove plate (2) that holds idler gear (1). 3. Remove idler gear (1). 4. Inspect two bushings (3) in idler gear (1). See Engine Specifications for bushing diameter. Remove two bushings (3) if replacement is necessary. 5. Remove fuel injection pump drive gear (4). 6. Bend lock (5) away from the bolt. Remove the bolt and remove washer (6). 7. Remove camshaft drive gear (7) with tool (A).Install Timing Gears
1. Align the slot in gear (1) with the key in the camshaft. Put the camshaft gear in position on the camshaft. 2. Install washer (2), lock (3) and the bolt. Tighten the bolt to a torque of 60-70 N m (45-52 lb ft). Bend the tab of the lock against the bolt head. 3. Align the roll pin in fuel injection pump drive gear (4) with the hole in fuel injection pump drive shaft (5). Install fuel injection pump drive gear (4) on to fuel injection pump drive shaft (5). 4. Install three bolts (6) to hold drive gear (4) to the fuel injection pump drive shaft. 5. Use tool (A) to install two bushings (7) into idler gear (8). Install the bushings even with the outside of idler gear (8). 6. Align the timing marks on idler gear (8) with the crankshaft gear, camshaft drive gear and the fuel injection pump drive gear. 7. Install plate (9) and the bolts to hold idler gear (8) on the idler gear shaft. Tighten the three bolts to a torque of 40 N m (30 lb ft). 8. Check the idler gear end clearance. The clearance must be at least 0.25 mm (.010 in). 9. Fasten a steel plate to the timing gear case. Fasten tooling (A) to the plate as shown. Check the timing gear backlash. The backlash must be 0.08 - 0.15 mm (.003 - .006 in).

Have questions with 105025-1000?





Group cross 105025-1000 ZEXEL

Isuzu 

105025-1000  
9 432 610 653 
NP-DLLA158SM100 
8943905350 
NOZZLE

Hino 

9 432 611 449 
NP-DLLA150SM101 
236402420A 
NOZZLE

Nissan-Diesel 

9 432 610 654 
NP-DLLA155SM102 
16620Z5606 
NOZZLE

Mitsubishi 

9 432 610 446 
NP-DLLA151SM103 
ME740795 
NOZZLE

Isuzu 

9 432 611 450 
NP-DLLA152SM104 
8943959890 
NOZZLE
9 432 611 450 
NP-DLLA152SM104 
5873106280 
NOZZLE

Hino 

9 432 610 793 
NP-DLLA150SM105 
236402440A 
NOZZLE
9 432 610 793 
NP-DLLA150SM105 
S236402440 
NOZZLE
9 432 611 451 
NP-DLLA155SM106 
236402430A 
NOZZLE

Mitsubishi 

9 432 611 452 
NP-DLLA157SM107 
ME740846 
NOZZLE
9 432 612 628 
NP-DLLA152SM108 
 
NOZZLE

Komatsu 

9 432 611 453 
NP-DLLA140SM109 
6152123520 
NOZZLE
Back to top