Buy 105019-2900 ZEXEL 9 432 612 845 BOSCH NOZZLE SET 9432612845 1050192900 1153190360


 

Information nozzle set

BOSCH 9 432 612 845 9432612845
ZEXEL 105019-2900 1050192900
ISUZU 1153190360 1153190360
105019-2900 NOZZLE SET
Rating:
30
Buy NOZZLE SET 105019-2900 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$173.83

15 Feb 2025

VN: Laminee
iDEESEEL Fuel Injectors Nozzle DLLA150SM303 / 105025-3030 / NP-DLLA150SM303
Generic
$54.99
 

23 Feb 2023
0.88[0.40] Pounds
CN: lutong part plant
Fuel Injector Nozzle Tips DLLA150SM303 105025-3030 Fits for ISUZU 6BG1TRW 6pcs/lot
DICSCL PARCS Fuel Injector Nozzle Tips DLLA150SM303 105025-3030 fits for ISUZU 6BG1TRW 6pcs/lot || Material: Made of high quality for longer durability and strength.100% quality inspection to ensure the high quality. Upgraded packaging to avoid damage. || Easy Installation:No further modification to direct replacement. || OEM Part Number:DLLA150SM303 || Estimated Time of Delivery from China: 5-10 working days.Customer satisfaction is always our top priority, we are standing by ready to provide you with reliable assistance with any questions you may have
$42.99
 

23 Feb 2023
0.66[0.30] Pounds
CN: lutong part plant
Diesel Fuel Injector Nozzle Tips DLLA150SM303 105025-3030 Fits for ISUZU 6BG1TRW 4pcs/lot
DICSCL PARCS Diesel Fuel Injector Nozzle Tips DLLA150SM303 105025-3030 fits for ISUZU 6BG1TRW 4pcs/lot || Material: Made of high quality for longer durability and strength.100% quality inspection to ensure the high quality. Upgraded packaging to avoid damage. || Easy Installation:No further modification to direct replacement. || OEM Part Number:DLLA150SM303 || Estimated Time of Delivery from China: 5-10 working days.Customer satisfaction is always our top priority, we are standing by ready to provide you with reliable assistance with any questions you may have

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2900 
9 432 612 845 
NP-DLLA150SM303 
1153190360  ISUZU
NOZZLE SET
C 53KY NOZZLE KIT NZ-KIT N&NH




Information:

Start By:a. remove timing gear coverb. remove flywheel housing*c. remove engine oil cooler**d. remove oil filter base***Put the engine in time before the flywheel housing is removed. See the topic, "Finding Top Center Compression Position For No. 1 Piston" in Testing & Adjusting Manual SENR6471.**These operations must be done to install Tool (A) on the engine.
Typical Example1. Fasten the engine on Tool (A). The weight of the engine is 1362 kg (3000 lb).2. Remove the bolts and nuts that hold air cleaner group (1), pipe assembly (3), bracket assembly (4) and lifting plate (5) as a unit to the engine. Fasten a hoist to the unit and remove it from the engine. The weight of the unit is approximately 39 kg (85 lb).3. Remove tube assembly (2) from the engine.
Typical Example4. Install the two bolts to hold the primary fuel filter bracket (6) in place while the engine is turned with Tool (A). 5. Turn the engine to the position shown with Tool (A). Remove rod bearing caps (8) from the ends of the connecting rods. Push the connecting rods away from the crankshaft.6. Remove the bolts and remove main bearing caps (7) from the crankshaft. 7. Remove thrust plates (9) from the center main bearing journal. 8. Fasten a hoist to crankshaft (10) with tooling (B). Remove crankshaft (10) from the engine block. The weight of the crankshaft is 159 kg (350 lb). 9. Use Tool (C) to remove outer gear (2) from the end of the crankshaft.10. Use a hammer and chisel to remove the spacer from the crankshaft. 11. Use Tool (D) to remove the gear alignment dowel from the crankshaft.12. Use Tool (C) to remove inner gear (11) from the end of the crankshaft. If new main bearings are not to be installed, put identification on the old main bearings as to their location in the cylinder block and to which main bearings caps they belong.13. Remove main bearings (13) from the cylinder block and the main bearing caps.Install Crankshaft
1. If the dowel was removed from the flywheel end of the crankshaft, install it in the crankshaft to a maximum dimension of 6.4 mm (.25 in).2. Heat the crankshaft gears to a maximum temperature of 205° C (400° F).3. The centerline of inner gear key must be in alignment with the centerline of the dowel hole within 0.51 mm (.020 in). Install crankshaft inner gear (14) on the crankshaft.4. Install the spacer on the crankshaft.5. Install the dowel in the crankshaft. The dowel must be extended no more than 4.1 0.5 mm (.16 .02 in) from the surface of the crankshaft. The dowel in the crankshaft must be in alignment with the notch in crankshaft gear (15).6. Make sure the "V" mark on the crankshaft gear is toward the outside, and install crankshaft gear (15). 7. Thoroughly clean the cylinder block and main bearing caps.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit

Have questions with 105019-2900?





Group cross 105019-2900 ZEXEL

Isuzu 

105019-2900  
9 432 612 845 
NP-DLLA150SM303 
1153190360 
NOZZLE SET
F 01G 29U 017 
 

9 432 612 865 
 
NOZZLE SET
9 432 612 894 
NP-DLLA155SM427 
 
NOZZLE SET
F 01G 29U 01K 
NP-DLLA145SM443 
 

Isuzu 

F 01G 29U 01T 
 
NOZZLE SET
F 01G 29U 01T 
1153190370 
NOZZLE SET
Back to top