105019-2750 ZEXEL 9 432 612 752 BOSCH NOZZLE SET 9432612752 1050192750 1153190300


 

Information nozzle set

BOSCH 9 432 612 752 9432612752
ZEXEL 105019-2750 1050192750
ISUZU 1153190300 1153190300
105019-2750 NOZZLE SET
Rating:
14
Buy NOZZLE SET 105019-2750 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2750 
9 432 612 752 
NP-DLLA141SM361 
1153190300  ISUZU
NOZZLE SET
C




Information:

Assemble Governor
*Pump and Governor Reconditioning Tool Group1. Put the fuel injection pump housing in position on Tool (A). Install race (3), bearing (2) and race (1) on the end of the camshaft in the fuel injection pump housing. 2. Put flyweights (5) in position on carrier assembly (4), and install dowels (6) to hold the flyweights in place. The flyweights must move freely on the dowels and have 0.010 to 0.230 mm (.0004 to .0090 in) end play. 3. Install governor shaft (7) on carrier assembly (4). 4. Install dowel (8) in governor shaft (7), and slide carrier assembly (4) down on the governor shaft until dowel (8) fits into the slot in the carrier assembly.5. Install carrier assembly (4) on the end of the camshaft. 6. Install race (12), bearing (11), race (10) and ring (9) on riser (13). 7. Install riser (13) and spring (14), if equipped, on the governor shaft. 8. Install spool (18) and ring (19) on seat (17), and use Tool (B) to install ring (20) to hold them in position.9. Install seat (17) on spring (16) and spring (16) on shield (15). 10. Install dashpot assembly (21) on the governor shaft. 11. Install ring (22) in the groove on the governor shaft. Install sleeve (23), spring (25), the sleeve and bearing (24) on the governor shaft. 12. Use Tool (C) to hold spring (25) under compression, and install the ring in the groove on the governor shaft. 13. Install O-ring seal (26) on sleeve (27). Install piston (29) and sleeve (27) in the governor servo as shown.14. Install valve (28) in the governor servo as shown. 15. Install lockring (33) in the groove near the center of valve (28). Put sleeve (34), spring broken link spring (35) and seat (36) in position on valve (28), and install lockring (37) to hold them in place. 16. Put governor servo (30) in position on the fuel injection pump housing with piston (29) engaged over the rack. Make sure the lever is engaged in the slot groove of riser (13). 17. If dowel (43) was removed, install it in block (44) 31 0.5 mm (1.22 .02 in) above the outside surface of the block.18. Install bolt (45) in block (44) and spring (38) on bolt (45).19. Install stop screw (40) and the locknut on collar (42). Install power setting screw (41) and the locknut on the collar.20. Install collar (42) on bolt (45). Make an alignment of the hole in the collar with the notch in bolt (45), and install bolt (39). 21. If the dowels that align block (44) with the front governor housing were removed, install them 4.0 0.5 mm (.16 .02 in) above the outside surface of the front governor housing.22. Put block (44) in position on the front governor housing with the holes in the block in alignment with dowels in the front governor housing. 23. Install dowels (46) in the front governor housing 6.0 0.5

Have questions with 105019-2750?





Group cross 105019-2750 ZEXEL

9 432 612 607 
NP-DLLA148SM345 
 
NOZZLE SET

Isuzu 

9 432 612 749 
NP-DLLA146SM364 
1153190280 
NOZZLE SET
9 432 612 608 
NP-DLLA156SM349 
1153190100 
NOZZLE SET
9 432 612 750 
NP-DLLA145SM357 
1153190290 
NOZZLE SET
9 432 612 609 
NP-DLLA156SM328 
1153190110 
NOZZLE SET

Hino 

9 432 612 751 
NP-DLLA152SM358 
236601680A 
NOZZLE SET

Isuzu 

105019-2750  
9 432 612 752 
NP-DLLA141SM361 
1153190300 
NOZZLE SET
9 432 612 753 
NP-DLLA152SM362 
1153190120 
NOZZLE SET
9 432 612 976 
NP-DLLA152SM369 
 
NOZZLE SET
9 432 612 754 
NP-DLLA150SM370 
 
NOZZLE SET

Isuzu 

9 432 612 926 
NP-DLLA147SM380 
1153190310 
NOZZLE SET
Back to top