105019-2740 ZEXEL 9 432 612 751 BOSCH NOZZLE SET 9432612751 1050192740 236601680a


 

Information nozzle set

BOSCH 9 432 612 751 9432612751
ZEXEL 105019-2740 1050192740
HINO 236601680A 236601680a
105019-2740 NOZZLE SET
Rating:
13
Buy NOZZLE SET 105019-2740 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

106682-3102 as NOZZLE SET

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2740 
9 432 612 751 
NP-DLLA152SM358 
236601680A  HINO
NOZZLE SET
C 53KY NOZZLE KIT NZ-KIT N&NH




Information:

1. Remove nuts (1), cover (2), and the gasket. 2. Put No. 1 piston at the top center compression position (TC) with the following procedure:a. Remove plug (3), two bolts and cover (2) from the flywheel housing. b. Install Tool (B) in the flywheel housing. Use Tool (B) to slowly rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine), until timing bolt (4) can be installed in the flywheel housing and into the hole in the flywheel. c. Remove the valve cover from the valve cover base. Check to see if both rocker arms (5) for the No. 1 cylinder can be moved backward and forward. The No. 1 piston is at the top center compression position (TC) when the timing bolt is installed in the flywheel and both rocker arms for the No. 1 cylinder can be moved backward and forward. If both rocker arms cannot be moved, the No. 1 piston is not at the top center compression position (TC). Remove the timing bolt from the flywheel and rotate the engine in the direction for normal rotation, (counterclockwise as seen from the flywheel end of the engine one full turn 360 degrees, and install the timing bolt again.3. Remove the timing bolt, and use Tool (B) to rotate the engine in the opposite direction of normal rotation (clockwise as seen from the flywheel end of the engine) a minimum of 30 degrees. The timing is correct if Tool (A) and the timing bolt can be installed at the same time. The timing procedure in the Testing & Adjustment Manual must be done again if the timing bolt and Tool (A) can not be installed at the same time.4. Remove the plug from the timing pin hole in the fuel injection pump housing. Install Tool (A) in the timing pin hole. 5. Remove eight bolts (6) and automatic timing advance (7). 6. Remove gear (9) from fuel injection pump camshaft (8).The following steps are for the installation procedure.7. Install gear (9) on fuel injection pump camshaft (8). 8. Install two 3/8 in 16 NC x 6 in (152.4 mm) long guide bolts (10). Space the guide bolts evenly.
There is a light spring located beneath the flyweight cover (12). Hold cover (12) while removing last nut (11). Slowly remove flyweight cover (12) to avoid dropping the spring.
9. Remove four nuts (11) and remove flyweight cover (12). 10. Put automatic timing advance (13) in position on the fuel injection pump camshaft, and install four bolts (14). Tighten bolts (14) just past finger tight. Remove guide bolts (15). 11. Install four nuts (16). Install Tool (C). 12. Tighten four knurled nuts (17) finger tight.
Do not use any tools to tighten the knurled nuts.
13. Install all mounting bolts (14) and tighten to 55 10 N m (41 7 lb ft).14. Loosen knurled nuts (17). Remove four nuts (16) and remove Tool (C).15. Install the spring and flyweight cover

Have questions with 105019-2740?





Group cross 105019-2740 ZEXEL

9 432 612 607 
NP-DLLA148SM345 
 
NOZZLE SET

Isuzu 

9 432 612 749 
NP-DLLA146SM364 
1153190280 
NOZZLE SET
9 432 612 608 
NP-DLLA156SM349 
1153190100 
NOZZLE SET
9 432 612 750 
NP-DLLA145SM357 
1153190290 
NOZZLE SET
9 432 612 609 
NP-DLLA156SM328 
1153190110 
NOZZLE SET

Hino 

105019-2740  
9 432 612 751 
NP-DLLA152SM358 
236601680A 
NOZZLE SET

Isuzu 

9 432 612 752 
NP-DLLA141SM361 
1153190300 
NOZZLE SET
9 432 612 753 
NP-DLLA152SM362 
1153190120 
NOZZLE SET
9 432 612 976 
NP-DLLA152SM369 
 
NOZZLE SET
9 432 612 754 
NP-DLLA150SM370 
 
NOZZLE SET

Isuzu 

9 432 612 926 
NP-DLLA147SM380 
1153190310 
NOZZLE SET
Back to top