105019-2590 ZEXEL 9 432 610 802 BOSCH NOZZLE SET 9432610802 1050192590 1662099327


 

Information nozzle set

BOSCH 9 432 610 802 9432610802
ZEXEL 105019-2590 1050192590
NISSAN-DIESEL 1662099327 1662099327
105019-2590 NOZZLE SET
Rating:
13
Buy NOZZLE SET 105019-2590 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2590 
105019-2591 
9 432 610 802 
NP-DLLA156SM317 
1662099327  NISSAN-DIESEL
NOZZLE SET
* C 53KY NOZZLE KIT NZ-KIT N&NH




Information:

Start By:a. remove timing gear cover1. Time the engine as follows:a. Install Tool (A) in the flywheel housing.b. Remove the cover from the side of the fuel injection pump housing so the timing pin can be installed. Remove the plug from the flywheel housing so the timing bolt can be installed.c. Turn the engine in the direction of engine rotation until Tool (B) can be installed in fuel injection pump housing and located in the groove in the fuel injection pump camshaft, a 3/8" - 16 NC bolt can be installed in the flywheel through the hole in the flywheel housing, and the "C" marks on the crankshaft gear and the camshaft gear are in alignment with each other. 2. Loosen bolt (1) until there is approximately 3.18 mm (.125 in) gap between washer (2) and fuel pump drive gear (3).3. Install Tool (C) as shown, and loosen the fuel pump drive gear from the taper on the fuel injection pump camshaft. Remove Tool (C), the bolt, washer and fuel pump drive gear.4. Remove the bolts and plate (4) that hold idler gear (5) in position. Remove the idler gear. If necessary, remove the bearing from the idler gear with Tool (D) and a press.
Do not turn the crankshaft after camshaft gear (6) has been removed. Turning the crankshaft will cause damage to the valves.
5. Remove the four bolts that hold camshaft gear (6) to the camshaft. Remove the camshaft gear.Install Timing Gears
1. Make an alignment of the "C" marks on crankshaft gear (3) and camshaft gear (4). Install the camshaft gear and the bolts that hold it. Tighten the bolts to a torque of 55 7 N m (41 5 lb ft).2. Install the bearing in idler gear (1) with Tool (A). The end of the bearing must be 1.52 mm (.060 in) below the face of the gear hub after installation.3. Be sure the oil hole in the shaft for idler gear (1) is open. Put idler gear (1) and plate (2) in position on the shaft. Install the bolts that hold them. 4. Make sure Tool (C) is in position in the groove of the fuel injection pump camshaft.5. Put fuel injection pump drive gear (5) in position on the fuel injection pump camshaft. Put washer (6) in position on the gear with the largest diameter toward the front of the engine. Install bolt (7), and tighten it to a torque of 7 N m (5 lb ft). Make sure bolt (7) does not turn while the flywheel is being turned.6. Remove the timing bolt from the flywheel, and use Tool (B) to turn the flywheel in the opposite direction of engine rotation. Turn the flywheel until the "C" mark on the crankshaft gear moves 30°.7. Turn the flywheel in the direction of engine rotation until the timing bolt can be installed in the flywheel and the "C" marks are in alignment. This will remove all of the backlash from the timing gears.8.

Have questions with 105019-2590?





Group cross 105019-2590 ZEXEL

Hino 

9 432 610 804 
NP-DLLA155SM295 
236601631A 
NOZZLE SET

Nissan-Diesel 

9 432 611 524 
NP-DLLA155SM296 
1662099326 
NOZZLE SET

Hino 

9 432 610 898 
NP-DLLA155SM297 
236601670A 
NOZZLE SET
9 432 612 599 
NP-DLLA158SM300 
 
NOZZLE SET
9 432 612 600 
NP-DLLA155SM305 
 
NOZZLE SET
9 432 612 601 
NP-DLLA160SM217 
 
NOZZLE SET

Isuzu 

9 432 612 602 
NP-DLLA142SM307 
1153190250 
NOZZLE SET

Mitsubishi 

9 432 610 790 
NP-DLLA160SM309 
ME748719 
NOZZLE SET

Hino 

9 432 611 525 
NP-DLLA150SM310 
236601610B 
NOZZLE SET
9 432 611 525 
NP-DLLA150SM310 
S236601610 
NOZZLE SET

Nissan-Diesel 

105019-2590  

105019-2591 
9 432 610 802 
NP-DLLA156SM317 
1662099327 
NOZZLE SET
9 432 612 746 
NP-DLLA156SM374 
16620NY026 
NOZZLE SET
Back to top