105019-2510 ZEXEL 9 432 611 524 BOSCH NOZZLE SET 9432611524 1050192510 1662099326


 

Information nozzle set

BOSCH 9 432 611 524 9432611524
ZEXEL 105019-2510 1050192510
NISSAN-DIESEL 1662099326 1662099326
105019-2510 NOZZLE SET
Rating:
84
Buy NOZZLE SET 105019-2510 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

108621-0031 as NOZZLE SET

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2510 
9 432 611 524 
NP-DLLA155SM296 
1662099326  NISSAN-DIESEL
NOZZLE SET
C




Information:

1. Remove bolts (1) and the washers that hold rocker shaft assembly (2) in position.2. Remove rocker shaft assembly (2). Remove the O-ring seal from the rear rocker arm support bracket.3. Put identification marks on push rods (3) as to their location in the engine. Remove the push rods.Install Rocker Shaft Assembly & Push Rods
1. Install push rods (1). Make sure they are in their original location in the engine and in position in the valve lifters.
Loosen the adjusting screws on the rocker arms. This will prevent a bent valve or push rod during installation of the rocker shaft assembly.
2. Install a new O-ring seal in the rear rocker arm support bracket. Put 2P2506 Thread Lubricant on all of the bolts that hold the rocker shaft assembly in position except for the bolt that goes through the rear rocker arm support bracket.3. Put rocker shaft assembly (2) in position on the engine. Make sure the dowels in the support bracket are in alignment with the dowel holes in the cylinder head. Make sure the rocker arms are engaged with the push rods.4. Install the bolts and washers that hold the rocker shaft assembly in position. Tighten them until they are finger tight.
3304 Engine Sequence
3306 Engine Sequence5. Tighten the bolts that hold the rocker shaft as follows:a. Tighten the bolts in number sequence to a torque of 156 N m (115 lb ft).b. Tighten the bolts in number sequence to a torque of 250 17 N m (185 13 lb ft).c. Tighten the bolts again in number sequence to a torque of 250 17 N m (185 13 lb ft).6. See "Valve Clearance Setting" in Testing & Adjusting. Make an adjustment to the valves so the intake valves have 0.38 mm (.015 in) clearance and the exhaust valves have 0.64 mm (.025 in) clearance. Tighten the locknuts for the adjusting screws to a torque of 29 7 N m (21 5 lb ft).End By:a. install valve cover

Have questions with 105019-2510?





Group cross 105019-2510 ZEXEL

Hino 

9 432 610 804 
NP-DLLA155SM295 
236601631A 
NOZZLE SET

Nissan-Diesel 

105019-2510  
9 432 611 524 
NP-DLLA155SM296 
1662099326 
NOZZLE SET

Hino 

9 432 610 898 
NP-DLLA155SM297 
236601670A 
NOZZLE SET
9 432 612 599 
NP-DLLA158SM300 
 
NOZZLE SET
9 432 612 600 
NP-DLLA155SM305 
 
NOZZLE SET
9 432 612 601 
NP-DLLA160SM217 
 
NOZZLE SET

Isuzu 

9 432 612 602 
NP-DLLA142SM307 
1153190250 
NOZZLE SET

Mitsubishi 

9 432 610 790 
NP-DLLA160SM309 
ME748719 
NOZZLE SET

Hino 

9 432 611 525 
NP-DLLA150SM310 
236601610B 
NOZZLE SET
9 432 611 525 
NP-DLLA150SM310 
S236601610 
NOZZLE SET

Nissan-Diesel 

9 432 610 802 
NP-DLLA156SM317 
1662099327 
NOZZLE SET
9 432 612 746 
NP-DLLA156SM374 
16620NY026 
NOZZLE SET
Back to top