105019-2010 ZEXEL 9 432 611 085 BOSCH NOZZLE SET 9432611085 1050192010 me742707


 

Information nozzle set

BOSCH 9 432 611 085 9432611085
ZEXEL 105019-2010 1050192010
MITSUBISHI ME742707 me742707
105019-2010 NOZZLE SET
Rating:
26
Buy NOZZLE SET 105019-2010 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105019-2010 
9 432 611 085 
NP-DLLA151SM186 
ME742707  MITSUBISHI
NOZZLE SET
C 53KY NOZZLE KIT NZ-KIT N&NH




Information:

Start By:a. remove radiator 1. Attach lifting strap to engine compartment cover. Remove two cotter pins and washers (1), remove four bolts (2). Lift off cover. 2. Loosen hose clamps (3) and (4) and remove hose (5). Remove three bolts (6) and remove ether aid cover (7). 3. Disconnect ether aid line (8), electrical connector (9), and loosen eight 1/4 turn fasteners (10). Remove heat shields (11) and (12). 4. Mark and disconnect starter wires (13) and ground strap (14). 5. Mark and disconnect alternator wires (15) and (16), temperature sending unit wire (17), cable mounting bracket (18), and electrical connector (19). Disconnect and remove flexible exhaust pipe (20). Disconnect two heater hoses (21). 6. Disconnect throttle linkage (22), remove two bolts (23). Set throttle linkage mounting bracket aside. Shut off and disconnect two fuel lines (24). 7. Disconnect throttle cable clip (25). Disconnect electrical wire (26), electrical connector (27) and governor wiring (28). 8. Install tool (A), lifting strap and tool (B) as shown, to support hydraulic pump. Remove twelve hydraulic pump mounting bolts (29). 9. Install lifting chains and remove four bolts and bushings (30).10. Remove engine. The following steps are to install the engine.11. Position engine in vehicle and install four bolts and bushings (30).12. Connect hydraulic pump to engine with twelve mounting bolts (29).13. Remove tooling (A) and (B), and the lifting strap that was supporting the hydraulic pump.14. Connect governor wiring (28), electrical connector (27), and wire (26). Connect throttle cable clip (25).15. Connect two fuel lines (24). Position throttle linkage mounting bracket and secure with two bolts (23). Connect throttle linkage (22).16. Connect two heater hoses (21) and flexible exhaust pipe (20). Connect alternator wires (15) and (16), temperature sending unit wire (17), cable mounting bracket (18) and electrical connector (19).17. Connect starter wires (13) and ground strap (14).18. Replace heat shields (11) and (12), fasten with eight 1/4 turn fasteners. Connect electrical connector (9) and ether aid line (8).19. Replace ether aid cover (7) and secure with three bolts (6). Replace hose (5) and connect with clamps (3) and (4).20. Attach engine compartment cover with four bolts (2) and connect cylinders with cotter pins and washers (1).End By:a. install radiator

Have questions with 105019-2010?





Group cross 105019-2010 ZEXEL

Nissan-Diesel 

9 432 611 084 
1662099129 
NOZZLE SET

Mitsubishi 

105019-2010  
9 432 611 085 
NP-DLLA151SM186 
ME742707 
NOZZLE SET

Hino 

9 432 611 076 
NP-DLLA150SM041 
236601460A 
NOZZLE SET
9 432 611 086 
NP-DLLA155SM192 
236601550A 
NOZZLE SET
9 432 611 087 
NP-DLLA158SM188 
236601520A 
NOZZLE SET
9 432 611 088 
NP-DLLA158SM189 
236601530A 
NOZZLE SET
9 432 611 089 
NP-DLLA152SM191 
236601421A 
NOZZLE SET
9 432 611 090 
236601282A 
NOZZLE SET
9 432 611 090 
S236601282 
NOZZLE SET

Isuzu 

9 432 612 588 
NP-DLLA154SN972 
1153190170 
NOZZLE SET

Mitsubishi 

9 432 611 091 
NP-DLLA160SM056 
ME742739 
NOZZLE SET
Back to top