105015-8080 ZEXEL 9 432 612 355 BOSCH NOZZLE 9432612355 1050158080


 

Information nozzle

BOSCH 9 432 612 355 9432612355
ZEXEL 105015-8080 1050158080
105015-8080 NOZZLE
Rating:
24
Buy NOZZLE 105015-8080 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105015-8080 
9 432 612 355 
NP-DLLA150SN808 
   
NOZZLE
C 50LC NOZZLE N (DLL-S) N




Information:

Turn the engine to (TDC) top center compression stroke for the No. 1 piston and install crankshaft flywheel timing pin. This will help when timing the camshaft when installing.
Wire used to hold cam roller followers up off camshaft. It is not necessary to remove the cylinder head. With the cylinder head in place, just wire the cam roller followers up off the camshaft and then remove the camshaft. 1. Remove camshaft retainer bolt (1) and remove camshaft assembly (2). The following steps are for the installation of the camshaft assembly.
Typical Example When installing the camshaft, rotating it both clockwise and counter clockwise directions will help prevent it from binding in the bearing bores.2. Put engine oil on the lobes and journals of the camshaft. Carefully install the camshaft. When installing the camshaft, be sure the number one cylinder is at (TDC) top dead center of the compression stroke with the timing pin installed in the flywheel. Camshaft timing is very important. Cam gear timing marks must line up with idler gear timing marks as illustrated. For more information about timing of engine, refer to Specifications module, Form No. SENR3908.
Camshaft Timing3. With the camshaft properly timed and positioned, install retaining bolt (1). Tighten bolt (1) to a torque of 48 7 N m (37 5 lb ft). Remove the wire that was used to hold the cam roller followers up off the camshaft.End By:a. install fuel transfer pumpb. install front coverc. install front pulley and damperd. install fuel injectorse. install rocker arm assemblies and push rodsDisassembly & Assembly of Camshaft And Gear Assembly
Start By:a. remove camshaft assembly 1. Wrap camshaft portion of camshaft and gear assembly (1) with paper towels to protect the camshaft from being damaged. 2. Remove six bolts (2). Remove timing/speed sensor ring gear (3). The timing/speed ring gear is located on gear (4) by dowel (6). Care must be taken not to damage timing/speed sensor ring gear (3) when removing. Using the prybar, work around the ring gear and pry the ring gear off a little at a time.
Care must be taken not to allow the camshaft to fall to the floor when pressing it from the gear. Also be sure that a camshaft lobe does not catch on the press plates.
3. Place camshaft and gear assembly (1) in a press. Press camshaft (5) from gear (4). The following steps are for the assembly of the camshaft and the gear assembly. 4. To install gear (4) on camshaft (5), place gear in the oven at 300°C (572°F) for 30 minutes and then install. Be sure the woodruff key is properly aligned and the gear is flush with the camshaft flange. 5. Align timing gear sensor ring gear (3) with dowel (6). "Front" is marked and visible when installing timing/speed ring gear sensor. Care must be taken not to damage the timing/speed sensor ring gear when installing. Using a mallet tap around the ring gear and drive it on a little at a

Have questions with 105015-8080?





Group cross 105015-8080 ZEXEL

9 432 612 354 
NP-DLLA150SNP188 
 
NOZZLE
9 432 610 699 
NP-DLLA155SNP189 
 
HOLE-TYPE NOZZLE

Hino 

9 432 611 276 
NP-DLLA150SN802 
236401810A 
NOZZLE

Nissan-Diesel 

9 432 611 266 
NP-DLLA143SN803 
1662096562 
NOZZLE
9 432 611 278 
NP-DLLA149SN804 
1662096563 
NOZZLE
9 432 611 279 
NP-DLLA143SN805 
1662096564 
NOZZLE

Komatsu 

9 432 611 280 
NP-DLL160SN806 
6162137620 
NOZZLE
9 432 610 277 
NP-DLL155SN807 
6215113220 
NOZZLE
105015-8080  
9 432 612 355 
NP-DLLA150SN808 
 
NOZZLE

Nissan-Diesel 

9 432 610 382 
NP-DLLA149SN809 
1662090008 
NOZZLE
Back to top