105015-7120 ZEXEL 9 432 612 343 BOSCH NOZZLE 9432612343 1050157120


 

Information nozzle

BOSCH 9 432 612 343 9432612343
ZEXEL 105015-7120 1050157120
105015-7120 NOZZLE
Rating:
18
Buy NOZZLE 105015-7120 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105015-7120 
9 432 612 343 
NP-DLLA149SN712 
   
NOZZLE
* C




Information:

Start By:a. remove timing gear cover
Do not disconnect the air line from the air compressor governor until the air pressure is zero.
1. Loosen the bleed valves, and release the air pressure in the air tank. 2. Disconnect the lines from air compressor (1), and remove the air compressor. 3. Remove sleeve (2) from air compressor drive gear (3). 4. Remove the nut and washer that holds the air compressor drive gear to the air compressor. Use tooling (A) to remove air compressor drive gear (3) from the air compressor. 5. Remove nuts (4) and plate (5). Remove gear assembly (6) from the shaft. 6. If damaged, remove bearing (7) from gear assembly (6) with tooling (B) and a press. 7. Remove three nuts (8) and the washers from the adapter assembly studs. 8. Remove adapter assembly (9) from the timing gear plate. 9. Remove shaft (10), O-ring seal (11) and sleeve (12) from the adapter assembly.Install Air Compressor And Accessory Drive
1. Install sleeve (12) into the adapter assembly.2. Install shaft (10) and O-ring seal (11) on the adapter assembly. 3. Put adapter assembly (9) in position on the timing gear plate. fasten it with the three nuts and washers. 4. Install the bearing in gear assembly (6) with tooling (A) and a press. Install the bearing until it is 1.5 0.5 mm (.06 .02 in.) below the surface of the gear as shown. 5. Put gear assembly (6) in position on the shaft.6. Put plate (5) in position, and install three nuts (4) to hold it. 7. Put air compressor drive gear (3) in position on the air compressor shaft, and install the washer and nut (13). Tighten the nut to a torque of 200 25 N m (150 18 lb.ft.). Tap the gear with a hammer and tighten nut again to a torque of 200 25 N m (150 18 lb.ft 8. Install sleeve (2) on gear (3). 9. Put a gasket in position on air compressor (1) and install the air compressor on the timing cover plate.End By:a. install timing gear cover

Have questions with 105015-7120?





Group cross 105015-7120 ZEXEL

9 432 610 265 
NP-DLLA155SN710 
 
HOLE-TYPE NOZZLE
9 432 610 399 
NP-DLLA155SN711 
 
HOLE-TYPE NOZZLE
105015-7120  
9 432 612 343 
NP-DLLA149SN712 
 
NOZZLE

Nissan-Diesel 

9 432 610 211 
NP-DLLA153SN7131 
1662001T61 
NOZZLE

Kubota 

9 432 610 460 
NP-DLLA141SN714 
1570753611 
NOZZLE
9 432 610 460 
NP-DLLA141SN714 
0570753611 
NOZZLE
9 432 610 460 
NP-DLLA141SN714 
1570753611 
NOZZLE

Hino 

 
236401590A 
NOZZLE

Mitsubishi-Heav 

9 432 611 261 
NP-DLL160SN716 
3626131800 
NOZZLE

Shinko-Engin. 

9 432 611 262 
NP-DLLA135SN717 
100218070 
NOZZLE

Daihatsu 

9 432 611 262 
NP-DLLA135SN717 
H154023090 
NOZZLE

Hino 

9 432 610 177 
NP-DLLA142SN718 
236401580A 
NOZZLE
9 432 611 263 
NP-DLLA138SN719 
236401600A 
NOZZLE
Back to top