105012-0930 ZEXEL 9 432 611 848 BOSCH NOZZLE 9432611848 1050120930 w312730700za


 

Information nozzle

BOSCH 9 432 611 848 9432611848
ZEXEL 105012-0930 1050120930
DAIHATSU W312730700ZA w312730700za
105012-0930 NOZZLE
Rating:
24
Buy NOZZLE 105012-0930 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105012-0930 
105012-0931 
9 432 611 848 
NP-DL145UE509N3 
W312730700ZA  DAIHATSU
NOZZLE
* C 31EA NOZZLE N(DL-TA) N
105012-0930 
105012-0931 
9 432 611 848 
NP-DL145UE509N3 
E326270310Z  DAIHATSU
NOZZLE
A * C 31EA NOZZLE N(DL-TA) N




Information:

START BY:a. remove fuel filter and base1. Drain the coolant from the engine.
Do not disconnect the air line from the compressor governor until the air pressure is zero.
2. Loosen the bleed valve and release the air pressure in the air tank. 3. Disconnect air compressor line (1) and fuel ratio control line (2) from the aftercooler housing. 4. Remove four turbocharger tube adapter to aftercooler housing bolts (3), nuts and cover. Loosen turbocharger compressor housing clamp (4), and rotate turbocharger tube (5) out of the way of the aftercooler housing. 5. Fasten tooling (A) and a hoist to aftercooler housing (6). Remove bolts (7) that hold the aftercooler housing to the cylinder head assembly. Remove the aftercooler housing from the engine. The weight is 36 kg (80 lb.).Install Aftercooler Housing
1. Install new O-ring seals (1) on the aftercooler water inlet and outlet pipes. Lubricate the O-ring seals with clean engine oil. Put new gaskets in position on the cylinder head assembly.2. Fasten tooling (A) and a hoist to aftercooler housing (2), and put the aftercooler housing in position on the water pipes and cylinder head assembly.3. Put 9S3263 Thread Lock on the threads of the bolts, and install the bolts that hold the aftercooler housing to the cylinder head assembly. 4. Rotate turbocharger tube (3) into position. Place a gasket between the aftercooler housing and adapter, and install four bolts and nuts that hold it. Tighten turbocharger clamp nut (4) to a torque of 18 3 N m (13 2 lb.ft.). Lightly hit all around the clamp with a soft faced hammer, and tighten the clamp nut again to the same torque value. 5. Connect air compressor line (5) and fuel ratio control line (6).6. Fill engine with coolant to the correct level. See the Maintenance Guide.END BY:a. install fuel filter and base

Have questions with 105012-0930?





Group cross 105012-0930 ZEXEL

9 432 612 225 
NP-DL140U529AN2R 
 
NOZZLE
9 432 612 226 
NP-DL135U5310NP18 
 
NOZZLE
9 432 612 227 
H4523002300 
 
NOZZLE

Daihatsu 

105012-0930  

105012-0931 
9 432 611 848 
NP-DL145UE509N3 
W312730700ZA 
NOZZLE
105012-0930  

105012-0931 
9 432 611 848 
NP-DL145UE509N3 
E326270310Z 
NOZZLE
9 432 612 228 
NP-DL145UE509N3 
 
NOZZLE

Daihatsu 

9 432 611 847 
NP-DL140UC659N1 
E406200400ZZ 
NOZZLE
9 432 611 871 
NP-DL140U4810AN3 
E286270190ZZ 
NOZZLE
9 432 611 859 
NP-DL140U4810AN3 
E286270190ZA 
NOZZLE
9 432 611 860 
NP-DL145UE559N1 
E326270320AZ 
NOZZLE
9 432 612 229 
NP-DL145UE559N1 
 
NOZZLE
9 432 612 230 
NP-DL140U4510NP5 
 
NOZZLE
9 432 612 231 
NP-DL120UE4210N1 
 
NOZZLE
9 432 612 232 
NP-DL120UE4410N1 
 
NOZZLE
Back to top