105011-9910 ZEXEL 9 432 611 906 BOSCH NOZZLE 9432611906 1050119910 e206200140z


 

Information nozzle

BOSCH 9 432 611 906 9432611906
ZEXEL 105011-9910 1050119910
DAIHATSU E206200140Z e206200140z
105011-9910 NOZZLE
Rating:
47
Buy NOZZLE 105011-9910 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105011-9910 
9 432 611 906 
NP-DL140T304,264NP32 
E206200140Z  DAIHATSU
NOZZLE
C 31BA NOZZLE N(DL-T) N




Information:

start by:a) remove oil pan1. Turn the crankshaft until two pistons are at bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the bearings from the caps.2. Push the connecting rods away from the crankshaft and remove the upper half of the bearings.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.3. Clean the surfaces where the bearings fit. Install the upper half of the bearing in the connecting rod. Pull the connecting rod slowly on to the crankshaft.4. Install lower half of the bearing in the cap.
When the connecting rod caps are installed, make sure that the numbers on the side of the caps are next to and respective with the number on the side of the connecting rods.
Typical Example5. Check the bearing clearance with Plastigage (A). Put Plastigage (A) on the bearing.6. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
Do not use an impact wrench to tighten the nuts the additional 60 5°.
Do not turn the crankshaft when Plastigage (A) is in position. 7. Put caps (1) in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.8. Remove the cap. Measure the thickness of Plastigage (A). The rod bearing clearance must be 0.053 to 0.140 mm (.0021 to .0055 in.). The maximum permissible clearance is 0.15 mm (.006 in.).9. Put the caps in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.10. Do Steps 1 through 9 again for other bearings. end by:a) install oil pan

Have questions with 105011-9910?





Group cross 105011-9910 ZEXEL

9 432 612 193 
NP-DL110T368AN2 
 
NOZZLE

Daihatsu 

105011-9910  
9 432 611 906 
NP-DL140T304,264NP32 
E206200140Z 
NOZZLE
9 432 612 194 
NP-DL155T2810NP28 
 
NOZZLE
9 432 612 195 
NP-DL150T248NP22 
 
NOZZLE

Daihatsu 

9 432 611 873 
NP-DL150T248NP32 
E186250170Z 
NOZZLE
9 432 612 196 
NP-DL150T268NP32 
 
NOZZLE

Daihatsu 

9 432 611 846 
NP-DL145T304,264NP32 
E206200680Z 
NOZZLE
9 432 611 883 
NP-DL145T324,284NP32 
E206200660Z 
NOZZLE

Mitsubishi-Heav 

9 432 611 862 
NP-DL155T3010NP28 
3716109030 
NOZZLE

Daihatsu 

9 432 611 861 
NP-DL145TE328N1 
E226950602Z 
NOZZLE
Back to top