146968-1400 ZEXEL 9 461 618 728 BOSCH NAMEPLATE 9461618728 1469681400


 

Information nameplate

BOSCH 9 461 618 728 9461618728
ZEXEL 146968-1400 1469681400
146968-1400 NAMEPLATE
Rating:
11
Buy NAMEPLATE 146968-1400 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104746-6242 as NUMBER PLATE

Include in ###:

Number on scheme 906
NAMEPLATE
1047466242 as NAMEPLATE

Cross reference number

Zexel num
Bosch num
Firm num
Name
146968-1400 
9 461 618 728 
   
NAMEPLATE
C




Information:

1. Drain the cooling system.2. Remove bolt (2) and spacer (1). 3. Remove clip (3) that holds line (4) to the cylinder head. 4. Remove bolts (5) that hold fuel filter base and filter (6) to the cylinder head. 5. Fasten a chain and hoist to the cylinder head lifting brackets. Remove the bolts and nuts that hold the cylinder head. Remove the cylinder head. Weight of the cylinder head is 41 kg (90 lb.). 6. Remove cylinder head gasket (7).7. Check the condition of the cylinder head assembly before installation.Install Cylinder Head Assembly
1. Use a tap of the correct size to clean each threaded hole in the cylinder block for the cylinder head mounting bolts.2. Thoroughly clean the surface for the cylinder head gasket on the cylinder head assembly and cylinder block.
Be sure the gasket is positioned so that all coolant passages in the cylinder block can be seen through the gasket.
3. Put cylinder head gasket (1) in place on the studs in the cylinder block. 4. Put the cylinder head in position on the studs.5. Put clean engine oil on the bolt threads, and install the bolts that hold the cylinder head. 6. Tighten the bolts and nuts in the number sequence shown as follows:a. Tighten all bolts and nuts in number sequence to a torque of 45 N m (35 lb.ft.).b. Tighten all bolts and nuts in number sequence to a torque of 95 N m (70 lb.ft.).c. Again, tighten all bolts and nuts in number sequence to a final torque of 135 N m (100 lb.ft.). Retighten the cylinder head bolts and nuts after the engine has run under part load for approximately thirty minutes.a. If the bolts and nuts move before the correct final torque is reached, retighten every thing in the sequence again to the final torque of 135 N m (100 lb.ft.).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60°, and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque. 7. Install fuel filter base and filter (2) on the cylinder head with bolts (3).8. Install clip (4) that holds fuel line (5) to the cylinder head.9. Install the alternator bracket bolt and spacer in the cylinder head.End By:a. install fuel injection nozzle assembliesb. install fuel injection linesc. install inlet and exhaust manifoldd. install rocker shaft and push rods

Have questions with 146968-1400?





Group cross 146968-1400 ZEXEL

146968-1400  
9 461 618 728 
 
NAMEPLATE
Back to top