146608-4720 ZEXEL 9 461 621 134 BOSCH INLET UNION 9461621134 1466084720 8970701860


 

Information inlet union

BOSCH 9 461 621 134 9461621134
ZEXEL 146608-4720 1466084720
ISUZU 8970701860 8970701860
146608-4720 INLET UNION
Rating:
43
Buy INLET UNION 146608-4720 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 247
INLET UNION
1047495300 as INLET UNION

Cross reference number

Zexel num
Bosch num
Firm num
Name
146608-4720 
9 461 621 134 
8970701860  ISUZU
INLET UNION
C 11FV EYE parts(VE) Others




Information:

28. Remove ring (57) and dashpot assembly (58). 29. Use tool (C) to remove snap ring (64). Remove ring (63) and spool (62).30. Remove seat (61) from spring (60) and remove spring (60) from seat (59). 31. Remove spring (overfueling spring) (65) and riser (66). 32. Remove ring (67), races (68) and bearing (69). Make a replacement of shield (70) any time it is removed.33. Use a screwdriver to remove shield (70) as shown. 34. Remove bolts (71) and carrier (72). 35. Remove dowels (73) and flyweights (75).36. Remove shaft (74) and the dowel from shaft (74). 37. Remove races (76) and bearing (77).Assemble Governor
Put clean oil on all parts before assembly. Be sure all oil passages are clear. 1. Install one race (76), bearing (77) and the other race on the camshaft in the fuel injection pump housing. 2. Put flyweights (75) in position on carrier (72) and install the dowels to hold the flyweights in place. The flyweights must move freely on the dowels and have 0.010 to 0.23 mm (0.0004 to 0.009 in) end play. 3. Install dowel (78) in governor shaft (74) and install the governor shaft in the carrier as shown. 4. Put carrier (72) in position and install bolts (71). Make a replacement of shield (70) any time it is removed.5. Install shield (70) on the carrier and use tool (D) to push the shield against its seat. Use a hammer and punch to move the metal (stake) two places on the side of the shield 180° 15° apart next to the holes in the shield. 6. Install race (68), bearing (69), race (68). Use tool (C) to install the ring on riser (66) as shown. 7. Install riser (66) and spring (overfueling spring) as shown. 8. Assemble the dashpot as follows:a. Install spring (60) on seat (59) and install seat (61) in spring (60).b. Put spool and ring (63) in position on seat (61) and use tool (C) to install snap ring (64). 9. Install dashpot assembly (58) as shown. 10. Install ring (57) in the lower groove in the governor shaft. Install sleeve (56), spring (54), sleeve (56) and bearing (55). Spring (54) is used to put a preload on the thrust bearing on the camshaft in the fuel injection pump housing. 11. Use tool (B) to hold spring (54) in compression and install ring (53) in the groove in the governor shaft. Remove tool (B). 12. Put lever (52) in position on the governor servo and install pin (50) to hold the lever in place. Use a hammer and chisel to move the metal (stake) four places 90° apart on the outside surface on both legs of the governor servo to hold pin (50) in place.13. Install the O-ring seal on sleeve (49). Install piston (51) and sleeve (49) as shown.14. Install valve (44) as shown. 15. Install one lockring (48) in the groove near the center of valve (44). Put sleeve (45), spring (broken link spring) (46)

Have questions with 146608-4720?





Group cross 146608-4720 ZEXEL

Isuzu 

146608-4720  
9 461 621 134 
8970701860 
INLET UNION
Back to top