Information injector
BOSCH
0 445 120 006
0445120006
ZEXEL
107755-0066
1077550066
MITSUBISHI
ME355278
me355278

Rating:
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
YRGFHJ 0445110190 0445120006 0445120007 0445120048 0445120123 0445120186 0445120199 Fuel Injector
YRGFHJ Replacement part number: 0445110190, 0445120006, 0445120007, 0445120048, 0445120123, 0445120186, 0445120199 || The injector ensures even fuel atomization and precise injection, effectively improving the engine combustion efficiency, bringing stronger power output and lower fuel consumption. || Adopting high-quality materials with excellent abrasion and corrosion resistance, able to withstand high-pressure and high-temperature environments, ensuring stable operation for a long time and prolonging service life || Injectors can reduce engine noise and vibration, providing a smoother driving experience || Easy to install, save time and energy, easy to install, even novice can easily complete, save your time and energy
YRGFHJ Replacement part number: 0445110190, 0445120006, 0445120007, 0445120048, 0445120123, 0445120186, 0445120199 || The injector ensures even fuel atomization and precise injection, effectively improving the engine combustion efficiency, bringing stronger power output and lower fuel consumption. || Adopting high-quality materials with excellent abrasion and corrosion resistance, able to withstand high-pressure and high-temperature environments, ensuring stable operation for a long time and prolonging service life || Injectors can reduce engine noise and vibration, providing a smoother driving experience || Easy to install, save time and energy, easy to install, even novice can easily complete, save your time and energy
You can express buy:
USD 159.99
19-05-2025
19-05-2025
0445120006 Common Rail Injector 0445 120 006 Diesel Sprayer 0986435632 Auto Injection Assy 0445 120 006 For MITSUBISHI Benz
USD 35.99
19-05-2025
19-05-2025
For MMC-NFZ 0445120006 ME355378 0 445 120 006 Injector Repair Kits Nozzle DLLZ157P964 Control Valve F00RJ00375
Images:
USD 958.94
[19-May-2025]
USD 117.2
[19-May-2025]
USD 167.64
[19-May-2025]
USD 11.38
[16-May-2025]
Cross reference number
Zexel num
Bosch num
Firm num
Name
107755-0066
0 445 120 006
ME355278 MITSUBISHI
INJECTOR
* C
* C
Information:
2. Remove bolts (1) from the alternator bracket.3. Remove the bolts that hold plate (3), and remove the plate.4. Disconnect water line (2) from the air compressor. Turn the water line tee toward the lifting bracket in order to provide clearance to remove the head bolt. 5. Remove bolts (4) and (5) that hold the cylinder head assembly to the cylinder block.6. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
7. Remove the gasket, seals (6) and O-ring seals (7) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See Remove And Install Spacer Plate.8. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (6) and two O-ring seals (7).9. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 10. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.).11. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).12. Install the valve cover bases and the inner fuel lines. See Install Rocker Shaft Assemblies And Push Rods.13. Install the valve covers. See Install Valve Covers.14. Install plate (3).15. Connect water line (2) to the air compressor.16. Install bolts (1) for the alternator bracket.17. Install the intake manifold on the
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
7. Remove the gasket, seals (6) and O-ring seals (7) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See Remove And Install Spacer Plate.8. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (6) and two O-ring seals (7).9. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 10. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.).11. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).12. Install the valve cover bases and the inner fuel lines. See Install Rocker Shaft Assemblies And Push Rods.13. Install the valve covers. See Install Valve Covers.14. Install plate (3).15. Connect water line (2) to the air compressor.16. Install bolts (1) for the alternator bracket.17. Install the intake manifold on the
Have questions with 107755-0066?
Group cross 107755-0066 ZEXEL
Mitsubishi
Mitsubishi
Bosch
Mitsubishi
107755-0066
0 445 120 006
ME355278
INJECTOR