109342-3001 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1093423001


 

Information injection-pump assembly

ZEXEL 109342-3001 1093423001
109342-3001 INJECTION-PUMP ASSEMBLY
Rating:
22
Buy INJECTION-PUMP ASSEMBLY 109342-3001 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 109342-3001
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105118-8022
8. Nozzle and Holder ME191379
9. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
10. NOZZLE-HOLDER 105048-4441
11. NOZZLE 105019-1310

Include in #2:

109342-3001 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
109342-3001 
 
   
INJECTION-PUMP ASSEMBLY
13CJ VP44 VP44




Information:

start by:a) remove oil pump Put identification numbers on the main bearing caps if the existing numbers can not be seen. Identification numbers are necessary for correct installation of the bearing caps.1. Remove the No. 2, No. 4 and No. 6 main bearing caps. 2. Use tool (A) to remove the upper halves of the main bearings. Put tool (A) in the crankshaft oil hole as shown. Turn the crankshaft in the direction which will push the tab end of the bearing out first.
If the crankshaft is turned in the wrong direction, the tab of the bearing will be pushed between the crankshaft and cylinder block. This can cause damage to either or both.
3. Remove the lower halves of the bearings from the caps.4. Put clean SAE 30 engine oil on the bearings. Use tool (A) to install the upper halves of the bearings. Clean the bearing contact surface in the caps. Install the lower halves of the bearings in the caps. Put clean SAE 30 engine oil on the bearings and on the threads of all the bolts. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances. Do not tighten bolts with an impact wrench.5. Put plastigage (B) on the bearing to check the bearing clearance. Install the bearing caps and tighten the bolts to a torque of 30 3 lb.ft. (40 4 N m). Put a mark across the bolt heads and bearing caps, and turn each bolt 90° more from the mark. Remove the bearing caps and measure the thickness of the wire to find the bearing clearance. Clearance with new bearings must be .0030 to .0065 in. (0.076 to 0.165 mm). Maximum permissible clearance with used bearings is .010 in. (0.25 mm). The main bearing caps must be installed with the part number toward the front of the block. Make sure the number on the cap is the same number and on the same side as the number on the left side of the engine block.6. Put clean SAE 30 engine oil on the cap bolt threads, face of the washers and lower halves of the main bearings. Put the caps in position on the engine. Install the bolts and washers. Tighten the bolts to a torque of 30 3 lb.ft. (40 4 N m). Put a mark across the bolt heads and bearing, and tighten the bolts 90° more from the mark.7. Remove the No. 1, 3 and 5 main bearing caps. Do Steps 2 through 6

Have questions with 109342-3001?





Group cross 109342-3001 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
4M42
109342-3001  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

0 470 504 027 
ME190297 
INJECTION-PUMP ASSEMBLY
4M42
 
ME0H6033A 
INJECTION-PUMP ASSEMBLY
4M42
Back to top