109342-3000 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1093423000


 

Information injection-pump assembly

ZEXEL 109342-3000 1093423000
109342-3000 INJECTION-PUMP ASSEMBLY
Rating:
21
Buy INJECTION-PUMP ASSEMBLY 109342-3000 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 109342-3000
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105118-8022
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
10. NOZZLE-HOLDER 105048-4441
11. NOZZLE 105019-1310

Include in #2:

109342-3000 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
109342-3000 
 
   
INJECTION-PUMP ASSEMBLY
4M42 13CJ VP44 VP44




Information:

start by:a) remove oil pump1. Turn the crankshaft until two pistons are at bottom center. Remove the connecting rod caps from the two connecting rods. Remove the lower half of the bearings from the caps.2. Push the connecting rods away from the crankshaft and remove the upper half of the bearings.3. Clean the bearing contact surfaces in the caps and rods. Install the upper halves of the bearings in the connecting rods. Put clean SAE 30 engine oil on the bearings and crankshaft journals. Put the connecting rods in position on the crankshaft.4. Install the lower halves of the new bearings in the caps. Put clean SAE 30 engine oil on the bearings and on the threads of all bolts. 5. Put Plastigage (A) on the bearing to check the bearing clearance. Put the caps in position on the connecting rods and install the nuts on the bolts. Tighten the nuts to a torque of 30 3 lb.ft. (40 4 N m). Put a mark across the nuts and bolts, and turn the nuts 90° more from the marks as shown. 6. Remove the rod cap and measure the thickness of the Plastigage to find the bearing clearance. Clearance with new bearings must be .0030 to .0066 in. (0.076 to 0.168 mm). Maximum permissible clearance with used bearings is .010 in. (0.25 mm).7. Put clean oil on the lower halves of the bearings and on the threads of the bolts. Put the caps in position on the connecting rods and install the nuts on the bolts. Tighten both nuts to a torque of 30 3 lb.ft. (40 4 N m). Put a mark across the nuts and bolts, and turn the nuts 90° more from the mark as shown.
Make sure the number on the side of the connecting rod is the same number and on the same side as the number on the cap.
8. Do the above steps again for the remainder of the connecting rod bearings.end by:a) install oil pump

Have questions with 109342-3000?





Group cross 109342-3000 ZEXEL

109342-3000  
 
 
INJECTION-PUMP ASSEMBLY
4M42
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

0 470 504 027 
ME190297 
INJECTION-PUMP ASSEMBLY
4M42
 
ME0H6033A 
INJECTION-PUMP ASSEMBLY
4M42
Back to top