109341-2031 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1093412031


 

Information injection-pump assembly

ZEXEL 109341-2031 1093412031
109341-2031 INJECTION-PUMP ASSEMBLY
Rating:
50
Buy INJECTION-PUMP ASSEMBLY 109341-2031 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 109341-2031
1. _
2. FUEL INJECTION PUMP
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105118-8160
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2) 19.0{194}/37.5{382}
10. NOZZLE-HOLDER
11. NOZZLE

Include in #2:

109341-2031 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
109341-2031 
 
   
INJECTION-PUMP ASSEMBLY
YD2ETI 13CJ VP44 VP44




Information:

start by:a) remove oil pump1. Check the identification on the connecting rods and caps as to their location in the engine. The caps must be installed in original positions in the engine.2. Turn the crankshaft until two of the pistons are at bottom center. 3. Remove connecting rod caps (1) from the connecting rods. Remove the lower half of the bearings from the caps.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
4. Push the connecting rod away from the crankshaft and remove the upper half of the bearings from the connecting rods.5. Make sure the surface of the connecting rod where the bearings make contact is clean and free of dirt.
Make sure the tabs on the bearings are in alignment with the notches in the connecting rods and caps.
6. Install the upper half of new bearings in the connecting rods.7. Pull the connecting rod down slowly on the crankshaft.
Make sure the surfaces where the bearings make contact in the caps are clean and free of dirt.
8. Install new bearings (2) in the caps. Make sure the tabs on the bearings are in alignment with the notches in the caps.9. Put clean engine oil on the threads of the bolts in the connecting rods.10. Check the bearing clearance with Plastigage (A) as follows: a) Make sure the numbers on the caps and connecting rods are the same and are on the same respective side. If new connecting rods are installed, put the cylinder number on the rods and caps.b) Put the caps and plastigage (A) in the correct position on the connecting rods. Install the nuts that hold them.c) Tighten the two nuts evenly to a torque of 60 6 lb.ft. (81.3 8.1 N m). Put a mark on each nut and tighten the nuts 120° more from the marks. d) Remove the caps from the connecting rods and Plastigage (A). Measure the thickness of the Plastigage. The connecting rod bearing clearance must be .0028 to .0066 in. (0.071 to 0.168 mm) for new bearings.e) Put clean engine oil in the bearing caps and install them again. Follow the tightening procedure in Step 10.f) Do Steps 1 through 10 for the other connecting rod bearings.end by:a) install oil pump

Have questions with 109341-2031?





Group cross 109341-2031 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
109341-2031  
 
 
INJECTION-PUMP ASSEMBLY
YD2ETI

Nissan 

 
 
INJECTION-PUMP ASSEMBLY
YD2ETI
9 461 629 119 
 
INJECTION-PUMP ASSEMBLY
YD2ETI

Nissan 

9 461 629 119 
167004N100 
INJECTION-PUMP ASSEMBLY
YD2ETI
0 470 504 006 
167004N100 
INJECTION-PUMP ASSEMBLY
YD2ETI
Back to top