109341-1003 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1093411003 8972492381


 

Information injection-pump assembly

ZEXEL 109341-1003 1093411003
ISUZU 8972492381 8972492381
109341-1003 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 109341-1003 zexel genuine, new aftermarket engine parts with delivery

Components :

0. INJECTION-PUMP ASSEMBLY 109341-1003
1. _
2. FUEL INJECTION PUMP 109241-1003
3. NUMBER PLATE
4. _
5. CAPSULE
6. ADJUSTING DEVICE
7. NOZZLE AND HOLDER ASSY 105118-8133
8. Nozzle and Holder
9. Open Pre:MPa(Kqf/cm2) 19.0{194}/33.5{342}
10. NOZZLE-HOLDER 105048-2270
11. NOZZLE 105017-3000

Include in #2:

109341-1003 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
109341-1003 
109341-1004 
 
8972492381  ISUZU
INJECTION-PUMP ASSEMBLY
4JA1 585 * K 13CJ VP44 VP44




Information:


Before any service work is done on the fuel system, the outer surface of the injection pump housing must be clean.
1. Disconnect two fuel lines (1) from the fuel transfer pump. 2. Remove two bolts (3) and fuel transfer pump (2).Install Fuel Transfer Pump
1. Put fuel transfer pump (1) in position and install the two bolts that hold it to the fuel pump housing. 2. Connect two lines (2) to the fuel transfer pump.Disassemble Fuel Transfer Pump
start by:a) remove fuel transfer pump 1. Remove bolts (1) that hold transfer pump cover (2) to transfer pump body (5).2. Remove bolts and clamps (4) from the tachometer drive adapter. Remove tachometer drive adapter (3) from the cover. 3. Remove lip type seal (6) from the cover. Remove plug and O-ring seal (7), seat (8), spring (9) and valve (10) from the cover. 4. Remove nut (14) on end of shaft (11) and remove gear (17) and key (12) from the shaft. Remove O-ring seal (13) and the shaft from the body (5).5. Remove idler gear (15) from shaft (16).6. Remove the bearings and the two lip type seals from the body.7. Remove the check valve and shaft (16) from the body.Assemble Fuel Transfer Pump
1. Clean the openings (ports) for the fuel passage in body (3).2. Install shaft (1) and check valve (2) in the body with tooling (A).3. Install smaller bearing (4) in the body with tooling (B). Install the bearing until it is even with the machined surface of the body. 4. Install seal (5) in the body with tooling (C). Install the seal until it is .969 in. (24.6 mm) from the top surface of the body and with the lip toward bearing (4) as shown.5. Install seal (6) in body (3) with tooling (D). Install the seal until it is .563 in. (14.3 mm) from the top surface of the body and with the lip toward the top surface of body (3) as shown. 6. Install the large bearing in body (3) with tooling (E). Install the bearing even with the outside surface of the body. 7. Install the seal in cover (7) with tooling (C). Install the seal with the lip toward the inside of the cover and until it is .750 in. (19.1 mm) below the outside surface of the cover.8. Install the fuel bypass valve, the valve, spring, seal, O-ring seal and plug (14) in the cover. Tighten the plug to a torque of 27 3 lb.ft. (38 4 N m).9. Install shaft (9) in the body. Install gear (13) on the shaft to make an alignment with the gear on the shaft.10. Put 7M7260 Liquid Gasket Material on surface of cover (8). Install the cover on the body.
Do not let liquid gasket material enter the pump.
11. Install the six bolts that hold the cover (7) to the body. Install the O-ring seal to the body. The shaft must turn freely after the bolts that hold the cover in position are tightened.12.

Have questions with 109341-1003?





Group cross 109341-1003 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8972492380 
INJECTION-PUMP ASSEMBLY
4JA1 585
 
 
INJECTION-PUMP ASSEMBLY
4JA1 585
109341-1003  

109341-1004 
 
8972492381 
INJECTION-PUMP ASSEMBLY
4JA1 585
F 01G 29X 062 
8972492382 
INJECTION-PUMP ASSEMBLY
4JA1 585
9 461 629 115 
8972492383 
INJECTION-PUMP ASSEMBLY
4JA1 585
0 470 504 030 
8972492384 
INJECTION-PUMP ASSEMBLY
4JA1 585
Back to top