108822-2494 ZEXEL 9 400 619 298 BOSCH INJECTION-PUMP ASSEMBLY 9400619298 1088222494 me094582


 

Information injection-pump assembly

BOSCH 9 400 619 298 9400619298
ZEXEL 108822-2494 1088222494
MITSUBISHI ME094582 me094582
108822-2494 INJECTION-PUMP ASSEMBLY
Rating:
57
Buy INJECTION-PUMP ASSEMBLY 108822-2494 zexel genuine, new aftermarket engine parts with delivery

Service parts 108822-2494 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108082-3510
3. GOVERNOR 105952-1791
4. SUPPLY PUMP 105237-4870
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0990
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7381
11. Nozzle and Holder ME093732
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105041-4120
14. NOZZLE
15. NOZZLE SET 105019-0350

Include in #1:

108822-2494 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 619 298 9400619298
ZEXEL 108822-2494 1088222494
MITSUBISHI ME094582 me094582


Zexel num
Bosch num
Firm num
Name
108822-2494 
108822-2910 
9 400 619 298 
ME094582  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC11 * K 14CQ INJECTION PUMP ASSY TICS HD-TI8F TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0220
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
RED3 control unit part number   407910-2 470
RED3 rack sensor specifications mm   15
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   42
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   8.5 8.47 8.53
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-7
deg.   90 89.75 90.25
Difference between angles 3
Cal 1-3
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-4
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-6
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-8
deg.   315 314.75 315.25
Injection quantity adjustment
Rack position   (11.5)
Vist V   1.69 1.69 1.69
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   122 121 123
Max. variation between cylinders %   0 -3 3
Basic   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Injection quantity adjustment_02
Rack position   (7.5)
Vist V   2.5 2.4 2.6
Pump speed r/min   340 340 340
Average injection quantity mm3/st.   23.5 20.9 26.1
Max. variation between cylinders %   0 -15 15
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   8.4+-0.0 3
Remarks
Refer to items regarding the pre-stroke actuator
 
0000001201
Pre-stroke mm   8.5 8.47 8.53
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   8.5 8 9
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   6.1 6.05 6.15
Output voltage V   2.45 2.44 2.46
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   8.5 8.47 8.53
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.5
Output voltage V   3 2.98 3
Confirmation   *
_06
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Speed control lever angle

Test data 108822-2494
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Rack position bb
----------
aa=16mm bb=1mm
----------
a=19deg+-5deg b=29deg+-5deg

0000000901

Test data 108822-2494
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At the No 1 cylinder's beginning of injection position, stamp an aligning mark on the damper to align with the pointer's groove. (4)Damper (5)Pointer (6)B.T.D.C.: aa (7)Pre-stroke: bb
----------
aa=4deg bb=8.5+-0.03mm
----------
a=(45deg) b=(44deg)

0000001501

Test data 108822-2494
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000001701

Test data 108822-2494
(Rs) rack sensor specifications (C/U) control unit part number (V) Rack sensor output voltage (R) Rack position (mm) 1. Confirming governor output characteristics (rack 15 mm, span 6 mm) (1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------

----------

0000001901 RACK SENSOR

Test data 108822-2494
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (154610-0620) (1)At governor side rack sensor output voltage V1, adjust the bobbin (A) so that the drive side rack sensor output voltage is VR+-0.01. (2)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
V1=1V
----------




Information:

Do not put oil on the bearings until the bearing clearance has been checked.1. Install bearings (1) in the connecting rods they were removed from. Make sure the tab in each bearing is in alignment with the notch in each connecting rod.2. Install bearings (2) in the cylinder block. Make sure the tab in each bearing is in alignment with the notch in the cylinder block. 3. Install pin (3) in the end of the crankshaft. Install the pin so that it extends a maximum of 6.4 mm (.252 in) above the surface. 4. Install the dowel in the crankshaft that puts gear (4) in the correct position. Install the dowel so that it extends 4.1 0.5 mm (.161 .020 in) above the surface of the crankshaft.5. Heat gear (4) to a maximum temperature of 233° C (451° F). Gear (4) must be installed on the crankshaft with the "V" timing mark toward the outside.6. Install gear (4) on the crankshaft. Make sure the notch in the gear is in alignment with the dowel on the crankshaft. The dimension from the rear face of the gear to the front face of the crankshaft must be 45.54 0.25 mm (1.793 .010 in). 7. Fasten Tooling (A) and a hoist to the crankshaft (5) as shown. Install the crankshaft in the engine. The weight of the crankshaft is approximately 131 kg (290 lb). 8. Make sure that "V" mark (6) on the crankshaft is in alignment with "V" mark (7) on the idler gear. The side of each thrust plate (8) with the words "BLOCK SIDE" must be installed with this side toward the cylinder block.9. Put clean oil on thrust plates (8). Install thrust plates (8) next to the center main bearings. Do not put oil on bearings (9) until the bearing clearances have been checked.10. Put bearings (9) in their original position in crankshaft main bearing caps (10).11. Check the crankshaft main bearing clearance with Plastigage as follows:a. Put a piece of Plastigage between the crankshaft bearing journal surface and bearing (9).b. Install the crankshaft main bearing caps (10) with the arrow on each cap toward the front of cylinder block. Each crankshaft main bearing cap has a number on the bottom surface and must be installed in the same position as the correct number on the left side of the cylinder block.c. Put 2P-2506 Thread Lubricant on the threads of the cap bolts. Install the cap bolts finger tight.d. Tighten the bolts on the tab end of the caps first to a torque of 258 14 N m (190 10 lb ft).e. Tighten the bolts on the other end of the caps to a torque of 258 14 N m (190 10 lb ft).
Do not use an impact wrench to tighten the bolts the additional 120 degrees.
f. Put a mark across the bolt head and cap. Tighten the bolts opposite the tab end of the cap

Have questions with 108822-2494?





Group cross 108822-2494 ZEXEL

9 400 619 476 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 477 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

108822-2494  

108822-2910 
9 400 619 298 
ME094582 
INJECTION-PUMP ASSEMBLY
8DC11
Back to top