108822-2364 ZEXEL 9 400 619 285 BOSCH INJECTION-PUMP ASSEMBLY 9400619285 1088222364 me094441


 

Information injection-pump assembly

BOSCH 9 400 619 285 9400619285
ZEXEL 108822-2364 1088222364
MITSUBISHI ME094441 me094441
108822-2364 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 108822-2364 zexel genuine, new aftermarket engine parts with delivery

Service parts 108822-2364 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108082-3301
3. GOVERNOR 105923-1902
4. SUPPLY PUMP 105237-4810
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0990
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7502
11. Nozzle and Holder ME094539
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/21.6{220}
13. NOZZLE-HOLDER 105041-4121
14. NOZZLE
15. NOZZLE SET 105019-2110

Include in #1:

108822-2364 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
108822-2364 
108822-7030 
9 400 619 285 
ME094441  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC11 K 14CK INJECTION PUMP ASSY TICS HD-TI8M TICS




Information:

(1) Cylinder head bolts and nuts tightening procedure:1. Put engine oil on the threads of bolts and nuts. Tighten all bolts and nuts in number sequence to a torque of ... 45 N m (35 lb ft)2. Tighten all bolts and nuts in number sequence to a torque of ... 95 N m (70 lb ft)3. Again tighten all bolts and nuts in number sequence to a final torque of ... 135 N m (100 lb ft).Retighten the cylinder head bolts and nuts after the engine has run under partial load for approximately thirty minutes. The rocker shaft assembly has to be removed and valve lash adjusted again.a. If the bolts and nuts move before the correct final torque is reached, retighten everything in the sequence again to the final torque of 135 N m (100 lb ft).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60° (with an 8T3052 Degree Wheel) and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque.c. After 25 to 50 hours of service for a new or rebuilt engine, retorque the cylinder head bolts as shown in Step a above and adjust the valves again.New cylinder blocks have been introduced on the 4.236 engine. The new cylinder blocks have deeper cylinder head bolt holes and longer bolts. The old and new sizes are shown. The change became effective at engine serial number LD----U027631M and up. See General Information in Systems Operation for the engine serial number location. The new cylinder head bolts are not interchangeable between old and new bolts.(2) Torque for nuts that hold injectors ... 19 N m (14 lb ft)Replace the copper washer and rubber seal between the head and the injector every time the injector is removed. See Fuel Injector Installation in Testing And Adjusting.(3) Torque for fuel line nuts ... 20 N m (15 lb ft)(4) Torque for nuts that hold rocker shaft to head ... 75 N m (54 lb ft)(5) Valve lash [clearance (cold)], between rocker arm and valve: Intake ... 0.30 mm (0.012 in)Exhaust ... 0.30 mm (0.012 in)(6) Maximum permissible nozzle projection below cylinder head face after resurfacing ... 4.44 mm (0.175 in) Resurfacing allowance (maximum) ... 0.30 mm (0.012 in)(7) Depth of cylinder head (new) ... 103.188 0.38 mm (4.0625 0.015 in) Minimum depth of cylinder head (after resurfacing) ... 102.502 mm (4.0355 in)Maximum permissible amount of bow (curve of cylinder head):Across width (transverse) ... 0.09 mm (0.003 in)Across length (longitudinal) ... 0.15 mm (0.006 in)(See Cylinder Head Check in Testing And Adjusting)

Have questions with 108822-2364?





Group cross 108822-2364 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

108822-2364  

108822-7030 
9 400 619 285 
ME094441 
INJECTION-PUMP ASSEMBLY
8DC11
Back to top