108822-2191 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1088222191


 

Information injection-pump assembly

ZEXEL 108822-2191 1088222191
108822-2191 INJECTION-PUMP ASSEMBLY
Rating:
52
Buy INJECTION-PUMP ASSEMBLY 108822-2191 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
108822-2191 
 
   
INJECTION-PUMP ASSEMBLY




Information:

Start By:a. remove oil pumpb. remove oil pan plate 1. Turn the crankshaft until two pistons are at the bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the rod bearing from the rod bearing cap.2. Push the connecting rods away from the crankshaft. Remove the upper half of the rod bearing from the connecting rod. Install the connecting rod bearings dry when the clearance checks are made. Put clean engine oil on the connecting rod bearings for final assembly.3. Install the upper half of the rod bearing in the connecting rod.4. Install the lower half of the rod bearing in the connecting rod cap. Be sure the tabs in the back of the connecting rod bearings are in the tab grooves of the connecting rod and cap. 5. Use Plastigage (A) to check the connecting rod bearing clearance.6. Put Plastigage (A) on the connecting rod bearing.7. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
When connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the nuts the additional 90°.
8. Install connecting rod cap (1). Install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft). Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more. Remove the connecting rod caps. Remove Plastigage (A) and measure the width of the Plastigage. The connecting rod clearance must be 0.076 to 0.168 mm (.0030 to .0066 in) for new bearings. The maximum clearance with used bearings is 0.25 mm (.010 in).9. Install the connecting rod caps and tighten the nuts as in Step 8.10. Do Steps 1 through 9 for the remainder of the connecting rod bearings.End By:a. install oil pan plateb. install oil pump

Have questions with 108822-2191?





Group cross 108822-2191 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 611 131 
ME093668 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 260 
ME093674 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 288 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 261 
ME161710 
INJECTION-PUMP ASSEMBLY
8M21
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 262 
ME161709 
INJECTION-PUMP ASSEMBLY
8M21
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 263 
ME161708 
INJECTION-PUMP ASSEMBLY
E74X
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 264 
ME161707 
INJECTION-PUMP ASSEMBLY
E74X
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 265 
ME093669 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 266 
ME093496 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 267 
ME093638 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
108822-2191  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 268 
ME162052 
INJECTION-PUMP ASSEMBLY
8M21
9 400 619 428 
ME354505 
INJECTION-PUMP ASSEMBLY
8M21
Back to top