108622-2392 ZEXEL F 019 Z10 803 BOSCH INJECTION-PUMP ASSEMBLY f019z10803 1086222392


 

Information injection-pump assembly

BOSCH F 019 Z10 803 f019z10803
ZEXEL 108622-2392 1086222392
108622-2392 INJECTION-PUMP ASSEMBLY
Rating:
84
Buy INJECTION-PUMP ASSEMBLY 108622-2392 zexel genuine, new aftermarket engine parts with delivery

Service parts 108622-2392 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108062-3930
3. GOVERNOR 105952-2413
4. SUPPLY PUMP 105237-4840
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0990
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-4621
11. Nozzle and Holder ME152421
12. Open Pre:MPa(Kqf/cm2) 21.6(220)
13. NOZZLE-HOLDER 105041-4171
14. NOZZLE 105025-1450
15. NOZZLE SET

Include in #1:

108622-2392 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 803 f019z10803
ZEXEL 108622-2392 1086222392


Zexel num
Bosch num
Firm num
Name
108622-2392 
F 019 Z10 803 
   
INJECTION-PUMP ASSEMBLY
6D24T2 14CP INJECTION PUMP ASSY TICS HD-TI6F TICS
108622-2392 
108622-2393 
F 019 Z10 803 
ME355477  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24T2 * K 14CP INJECTION PUMP ASSY TICS HD-TI6F TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-8020
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
RED3 control unit part number   407910-3 960
RED3 rack sensor specifications mm   19
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   31
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   8.5 8.47 8.53
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.75 60.25
Difference between angles 2
Cal 1-3
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cyl.1-2
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-4
deg.   300 299.75 300.25
Injection quantity adjustment
Rack position   (10.3)
Vist V   2.3 2.3 2.3
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   109 108 110
Max. variation between cylinders %   0 -2 2
Basic   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Injection quantity adjustment_02
Rack position   (7.1)
Vist V   2.8 2.7 2.9
Pump speed r/min   310 310 310
Average injection quantity mm3/st.   20 18 22
Max. variation between cylinders %   0 -15 15
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   8.4+-0.0 3
Remarks
Refer to items regarding the pre-stroke actuator
 
0000001201
Pre-stroke mm   8.5 8.47 8.53
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   8.5 8 9
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   6.1 6.05 6.15
Output voltage V   2.45 2.44 2.46
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   8.5 8.47 8.53
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.5
Output voltage V   3 2.98 3
Confirmation   *
_06
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Speed control lever angle

Test data 108622-2392
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Rack position bb
----------
aa=1mm bb=20mm
----------
a=19deg+-5deg b=37deg+-5deg

0000000901

Test data 108622-2392
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At the No 1 cylinder's beginning of injection position, stamp an aligning mark on the damper to align with the pointer's groove. (4)Damper (5)Pointer (6)B.T.D.C.: aa (7)Pre-stroke: bb
----------
aa=3deg bb=8.5+-0.03mm
----------
a=(1deg) b=(44deg)

0000001501

Test data 108622-2392
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000001701

Test data 108622-2392
(Rs) rack sensor specifications (C/U) control unit part number (V) Rack sensor output voltage (R) Rack position (mm) 1. Confirming governor output characteristics (rack 19 mm, span 10 mm) (1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------

----------

0000001901 RACK SENSOR

Test data 108622-2392
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (154610-0620) (1)At governor side rack sensor output voltage V1, adjust the bobbin (A) so that the drive side rack sensor output voltage is VR+-0.01. (2)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
V1=1.6V
----------




Information:

Water Pump
Disassembly of Water Pump
Inspection of Water Pump
If the inspection of the impeller and shaft finds abnormal noise or rough rotation, replace the assembly.
Inspection of impeller and shaft rotation conditionThermostat
Disassembly of Thermostat
Inspection of Thermostat
To test the thermostat operation, immerse the thermostat in a container filled with water, and heat the water while measuring the water temperature. Record the temperature at which the valve starts to open and the temperature at which the valve lift becomes 8 mm [0.3 in.] or more. (a) Stir the water in the container to ensure uniform temperature distribution.(b) When installing the thermostat, be sure to check the valve opening temperature indication stamped on the upper face of the thermostat mounting flange.
Inspection of thermostatThermo Switch
Inspection of Thermo Switch
Immerse the temperature sensor in oil, and measure the resistance while increasing the oil temperature. If the temperature measurement exceeds the standard value significantly, replace the thermo switch.
Since the inspection requires heating of oil to high temperatures, be careful not to get burns or start a fire.
Inspection of thermo switch

Have questions with 108622-2392?





Group cross 108622-2392 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
F 019 Z20 363 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

F 019 Z20 363 
ME355477 
INJECTION-PUMP ASSEMBLY
6D24T2
108622-2392  
F 019 Z10 803 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

108622-2392  

108622-2393 
F 019 Z10 803 
ME355477 
INJECTION-PUMP ASSEMBLY
6D24T2
F 01G 09U 1GY 
ME355477 
INJECTION-PUMP ASSEMBLY
6D24T2
Back to top