108622-2270 ZEXEL 9 400 612 882 BOSCH INJECTION-PUMP ASSEMBLY 9400612882 1086222270


 

Information injection-pump assembly

BOSCH 9 400 612 882 9400612882
ZEXEL 108622-2270 1086222270
108622-2270 INJECTION-PUMP ASSEMBLY
Rating:
49
Buy INJECTION-PUMP ASSEMBLY 108622-2270 zexel genuine, new aftermarket engine parts with delivery

Service parts 108622-2270 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108062-3281
3. GOVERNOR 105952-1722
4. SUPPLY PUMP 105237-4890
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-2070
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7341
11. Nozzle and Holder ME121324
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/24.5{250}
13. NOZZLE-HOLDER 105041-4101
14. NOZZLE
15. NOZZLE SET 105019-0400

Include in #1:

108622-2270 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
108622-2270 
108622-2271 
9 400 612 882 
   
INJECTION-PUMP ASSEMBLY
* K




Information:

5.3 Assembly
Assembly sequence: piston and connecting rod assemblies and crankshaftThe assembly sequence is indicated by the numbers in the drawing above. KEY POINTS FOR ASSEMBLY(1) Installing Main Bearings(a) Press the main bearings (upper and lower) into the cylinder block and main bearing caps, respectively, such that the bearings' lugs fit into the grooves.
Installing main bearings(b) Fit the flanged main bearing in the No. 3 journal position.(c) Smear a little engine oil on the inner surface of each bearing.
Installing flanged main bearing(2) Installing Crankshaft(a) Wash the crankshaft thoroughly in cleaning solvent, then dry it with compressed air.(b) Keeping the crankshaft horizontal, gently lower it into the cylinder block.(c) Smear a little engine oil on each crankshaft journal.
Installing crankshaft(3) Installing Main Bearing Caps(a) Before installing the main bearing caps, apply sealant to the mating surfaces of the frontmost and rearmost caps and to the corresponding surfaces in the cylinder block.
Installing main bearing caps(b) Referring to the cap numbers, fit the main bearing caps sequentially starting at the front of the engine. The arrow on each cap must point toward the front of the engine.
Make sure the frontmost and rearmost caps fit flush against the cylinder block.
Front marks and cap numbers(4) Tightening Bearing Cap BoltsTighten the bearing cap bolts alternately a little at a time, then torque each bolt to specification.
Tightening bearing cap bolts(5) Checking Crankshaft RotationConfirm that the crankshaft turns smoothly.
Checking crankshaft rotation(6) Measuring End Play of CrankshaftApply a dial gauge to the end of the crankshaft and measure the end play. If the measurement exceeds the specified limit, replace the No. 3 flanged bearing.
Unit: mm (in.)
Measuring end play of crankshaft(7) Inserting Side Seals(a) Apply sealant to the mating surfaces of each side seal. (b) With the radius of each side seal facing the outside, push the side seals part-way into the frontmost and rearmost caps by hand.
Alignment of side seals for installation(c) Press each side seal completely into position using a flat implement. Be careful not to bend the side seals.
Inserting side seals(8) Preparation for Installation of Piston and Connecting Rod Assemblies(a) Clean each cylinder's inner surface with a rag, then smear each with engine oil.(b) Press the connecting rod bearings (upper and lower) into the connecting rods and caps such that the bearings' lugs fit into the grooves.(c) Smear the connecting rod bearings with engine oil.(d) Turn the cylinder block onto its side.
Preparation for installation of piston and connecting rod assemblies(9) Preparation for Installation of Piston and Connecting Rod Assemblies(a) Smear the pistons' sliding surfaces and piston rings with engine oil.(b) Position the piston ring gaps as shown in the drawing. Do not align any ring gap with the piston pin or at 90° to the piston pin.
Piston ring positions(c) Turn the crankshaft until the crank pin onto which the connecting rod is to be fitted reaches its TDC position.(d) Align the piston such that its front mark (this is stamped on the piston crown) points toward the timing gear case mounting surface (the front of the engine).(e)

Have questions with 108622-2270?





Group cross 108622-2270 ZEXEL

9 400 612 876 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 145 
ME152177 
INJECTION-PUMP ASSEMBLY
6D24
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 146 
ME152322 
INJECTION-PUMP ASSEMBLY
6D24T2
9 400 612 877 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 878 
ME152265 
INJECTION-PUMP ASSEMBLY
6D24
9 400 612 879 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 880 
ME152266 
INJECTION-PUMP ASSEMBLY
6D24
9 400 612 881 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 147 
ME152523 
INJECTION-PUMP ASSEMBLY
6D24
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 702 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

9 400 619 148 
ME152420 
INJECTION-PUMP ASSEMBLY
6D24T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 149 
ME152560 
INJECTION-PUMP ASSEMBLY
6D24
108622-2270  

108622-2271 
9 400 612 882 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 150 
ME121680 
INJECTION-PUMP ASSEMBLY
6D40T1
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 089 
ME121681 
INJECTION-PUMP ASSEMBLY
6D40T1
9 400 611 169 
 
INJECTION-PUMP ASSEMBLY
9 400 611 199 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

9 400 619 151 
ME153012 
INJECTION-PUMP ASSEMBLY
6D24T2
Back to top