108622-2241 ZEXEL 9 400 619 147 BOSCH INJECTION-PUMP ASSEMBLY 9400619147 1086222241 me152523


 

Information injection-pump assembly

BOSCH 9 400 619 147 9400619147
ZEXEL 108622-2241 1086222241
MITSUBISHI ME152523 me152523
108622-2241 INJECTION-PUMP ASSEMBLY
Rating:
42
Buy INJECTION-PUMP ASSEMBLY 108622-2241 zexel genuine, new aftermarket engine parts with delivery

Service parts 108622-2241 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108062-3440
3. GOVERNOR 105923-3060
4. SUPPLY PUMP 105237-0110
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0990
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7411
11. Nozzle and Holder ME151252
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/24.5{250}
13. NOZZLE-HOLDER 105041-4111
14. NOZZLE
15. NOZZLE SET 105019-0430

Include in #1:

108622-2241 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
108622-2241 
9 400 619 147 
ME152523  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24 K 14CJ INJECTION PUMP ASSY TICS HD-TI6M TICS




Information:

3. Inspection
Inspection points4. Assembly
Assembly sequenceFollow the reverse of disassembly and use the procedure that follows. Assembly procedure (1) Barrel installationPut each barrel in position in the housing with its slot in alignment with the dowel of the housing and put it straight down into the bore. If the slot in the barrel is not aligned with the dowel of the housing, the O-ring will not seat correctly (still visible) after the delivery valve holder has been installed.
Installing barrels(2) Delivery valve installationInstall the delivery valve, gasket, spring and O-ring on the barrel and tighten the delivery valve holder finger tight. Do this step for remainder of the delivery valves.
a) Any time the injection pump is disassembled, a new O-ring must be installed.b) Make sure the threads of the delivery valve holder do not cause damage to the O-rings.
Installing delivery valves(3) Control sleeve installation (a) Install each control sleeve with the center tooth in alignment with the line mark of the control rack.
Installing control sleeves(b) Put the plungers in position in the barrels.
Make sure the notch in the plunger is toward the adjusting plate.
Installing plungers(4) Tappet installationMove the control rack back and forth while pushing down on each tappet to align the slot in the tappet with the hole in the housing for the tappet guide pin. Install the lock plates and tappet guide pins in position.
Any time the injection pump is disassembled, new lock plates must be used.
Installing tappets(5) Delivery valve holder installation Put the delivery valve holders in position and tighten them to the specified torque.
Do not over tighten the delivery valve holders. This can put end force on the barrels, resulting in a failure of the plungers to move freely. If the holders are not tightened to the specified torque, engine oil would leak in the injection pump.
Tightening delivery valve holders(6) Inspection after assembly (a) After the injection pump has been assembled, check to see if the control rack moves freely without any binding or catching.(b) If the control rack fails to move freely, the possible causes are:1) Pumping element(s) sticking2) Foreign particles lodged between control rack and sleeves3) Over-tightening of delivery valve holder(s)Disassemble and check the injection pump to locate the cause of the trouble. (c) After the injection pump has been finally assembled, check the injection timing.
Checking control rack movementGOVERNOR
1. Disassembly and inspection
Disassembly sequence and inspection points1 Tie rod spring2 Tie rod3 Speed control lever4 Spring pin5 Grooved pin6 Governor shaft (Remove 7 thru 11 as an assembly.)7 Governor lever8 Start spring9 Tension lever10 Governor spring11 Governor spring lever12 Governor case2. Assembly (1) Install the levers in position.
Installing governor levers(2) Put O-ring on the governor shaft. (3) Put the governor shaft in position in the governor case and put the levers on the governor shaft. (4) Install the grooved pin and spring pin in position with a hammer.(5) Install the tie rod and tie rod spring in position.
Assembling governor3. Torque spring set installation The torque spring set is to be installed and adjusted after an

Have questions with 108622-2241?





Group cross 108622-2241 ZEXEL

9 400 612 876 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 145 
ME152177 
INJECTION-PUMP ASSEMBLY
6D24
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 146 
ME152322 
INJECTION-PUMP ASSEMBLY
6D24T2
9 400 612 877 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 878 
ME152265 
INJECTION-PUMP ASSEMBLY
6D24
9 400 612 879 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 880 
ME152266 
INJECTION-PUMP ASSEMBLY
6D24
9 400 612 881 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

108622-2241  
9 400 619 147 
ME152523 
INJECTION-PUMP ASSEMBLY
6D24
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 702 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

9 400 619 148 
ME152420 
INJECTION-PUMP ASSEMBLY
6D24T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 149 
ME152560 
INJECTION-PUMP ASSEMBLY
6D24
9 400 612 882 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 150 
ME121680 
INJECTION-PUMP ASSEMBLY
6D40T1
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 612 089 
ME121681 
INJECTION-PUMP ASSEMBLY
6D40T1
9 400 611 169 
 
INJECTION-PUMP ASSEMBLY
9 400 611 199 
 
INJECTION-PUMP ASSEMBLY
6D24T2

Mitsubishi 

9 400 619 151 
ME153012 
INJECTION-PUMP ASSEMBLY
6D24T2
Back to top