107692-5250 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1076925250


 

Information injection-pump assembly

ZEXEL 107692-5250 1076925250
107692-5250 INJECTION-PUMP ASSEMBLY
Rating:
10
Buy INJECTION-PUMP ASSEMBLY 107692-5250 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 107692-5250 1076925250


Zexel num
Bosch num
Firm num
Name
107692-5250 
 
   
INJECTION-PUMP ASSEMBLY
14CG TICS MD-TI6 TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407910-3 03*
Selector switch no.   01
PS/ACT control unit part no.   407910-2 24*
Digi switch no.   15
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   5.1 5.07 5.13
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   -
Rack position   14.4
Pump speed r/min   1300 1300 1300
Average injection quantity mm3/st.   113 111 115
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8.6+-0.5
Pump speed r/min   480 480 480
Average injection quantity mm3/st.   30 28.2 31.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   5+-0.03
PS407910-303* V   V1+0.05+ -0.01
PS407910-303* mm   5+-0.03
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(14.4)
Pump speed r/min   1300 1300 1300
Average injection quantity mm3/st.   113 112 114
Basic   *
Fixing the lever   *
Boost pressure kPa   25.3 25.3
Boost pressure mmHg   190 190
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-2.25
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   99 95 103
Fixing the lever   *
Boost pressure kPa   25.3 25.3
Boost pressure mmHg   190 190
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Injection quantity adjustment_05
Adjusting point   C
Rack position   (R2-0.2)
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   42.8 40.8 44.8
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.1+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.1+-0.0 5
Boost compensator adjustment
Pump speed r/min   350 350 350
Rack position   (R2-0.2)
Boost pressure kPa   6.7 5.4 8
Boost pressure mmHg   50 40 60
Boost compensator adjustment_02
Pump speed r/min   350 350 350
Rack position   R2(R1-4. 35)
Boost pressure kPa   12 12 12
Boost pressure mmHg   90 90 90
0000001601
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2 1.95 2.05
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.1 5.07 5.13
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_03
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *
_04
CU407910-303*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2 1.95 2.05
Output voltage V   2.83 2.82 2.84
Adjustment   *
_05
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.1 5.07 5.13
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_06
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 107692-5250
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=AG30 BCL=(0.2)+-0.1mm
----------

Speed control lever angle

Test data 107692-5250
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=93.5mm
----------
a=15deg+-5deg b=(36deg)+-3deg

Stop lever angle

Test data 107692-5250
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa (2)Set the stopper bolt so that rack position = bb (speed = cc)
----------
aa=37mm bb=1.5+-0.3mm cc=0r/min
----------
a=20deg+-5deg b=45deg+-5deg

0000001301

Test data 107692-5250
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)Pre-stroke: aa (4)-
----------
aa=5.1+-0.03mm
----------
a=(20deg)

0000001401

Test data 107692-5250
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001701

Test data 107692-5250
A : Stopper pin B: Connector
----------

----------

0000001801

Test data 107692-5250
C:Shim
----------

----------

0000001901

Test data 107692-5250
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 107692-5250
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1300r/min Ra=R1(14.4)mm
----------

0000002301 ACS

Test data 107692-5250
(P) Absolute pressure (R) Rack position (mm) 1. Adjustment of the aneroid compensator (1)Screw in the aneroid compensator body and attach the pushrod to the compensator lever so that the performance in the above graph can be obtained. The control lever must be at the full set position N = N1.
----------
N1=1300r/min
----------
Ra=R1(14.4)mm Rb=- Rc=(R1-0.75)mm P1=(80.6)+-2.7kPa((605)+-20mmHg) P2=- P3=57.7+-0.7kPa(433+-5mmHg) Q1=113+-1cm3/1000st Q2=- Q3=103+-2cm3/1000st




Information:


Oil pressure should raise within nine seconds after the engine starts. If no oil pressure is indicated within ten seconds, the engine will shutdown. Investigate and correct the cause.
7. Do not apply load to the engine or increase engine rpm until the operating parameter readings indicate normal. Check all GSC display window readings during the warm-up period. Engine Starting Sequence
1. The GSC receives an engine start signal. The possible engine start signals are: a. ECS (Engine Control Switch) turned to MAN. START by the operatorb. The remote initiate contacts (IC) close while the ECS is in the AUTO position.2. The GSC checks the system before beginning the cranking sequence. The GSC checks that: a. No system faults are present.b. All previous faults have been reset (removed by turning the ECS to OFF/RESET).c. The engine is not already running.d. The service mode is not activated.3. The GSC activates the starting motor relay (SMR) and the run relay (RR).4. The GSC activates the fuel control relay (FCR) for the ETR fuel systems.5. The GSC cycle cranks (factory default is ten seconds crank and ten seconds rest) the engine until it starts or until the cycle crank time reaches the setpoint for total cycle crank time (overcrank).6. While the starting motor is cranking, the GSC shows the status of the relays on the relay status indicators of the lower display (i.e. K4, K5, K7 for ETR fuel systems).7. The GSC deactivates the starting motor relay (SMR) and activates the crank termination relay (CTR) when the engine speed reaches the setpoint for crank terminate speed (factory default is 400 rpm).8. The GSC activates the electronic governor (EG) relay when the oil pressure reaches the setpoint for low oil pressure at idle speed (factory default is 69 kPa [10 psi]). The EG relay signals the electronic governor (EG) to accelerate the engine to rated speed.9. The GSC shows: a. AC voltage, current, and frequency for one phase at a time on the upper display.b. System battery voltage, engine hours, engine rpm, oil pressure, and coolant temperature on the lower display.c. The relay status on the relay status indicators of the lower display. K1, K3, K5, K7 for ETR fuel systems.Starting From External Electrical Source
Make initial determination as to failure of engine to crank. Refer to special instruction SEHS7768 on use of 6V2150 Starting/Charging Analyzer Group.If the installation is not equipped with a back-up battery system, then it may be necessary to start the engine from an external electrical source. Many batteries thought to be unusable, are still rechargeable. Severely discharged maintenance free batteries might not fully recharge from the alternator alone after jump starting. The batteries must be charged to the proper voltage with a battery charger. Refer to Special Instruction, SEHS7633, Battery Test Procedure, available from your Caterpillar dealer, for complete testing and charging information.
Before attaching the booster cables, move ECS switch to OFF/RESET. Be sure the main power switch is in the OFF position before attaching the booster cables to

Have questions with 107692-5250?





Group cross 107692-5250 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
FE6TC

Nissan-Diesel 

9 400 619 070 
16801Z5577 
INJECTION-PUMP ASSEMBLY
FE6TC
9 400 613 076 
 
INJECTION-PUMP ASSEMBLY
FE6TC

Nissan-Diesel 

9 400 613 241 
16801Z5578 
INJECTION-PUMP ASSEMBLY
FE6TC
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 071 
16714Z5617 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 072 
16714Z5563 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 073 
16714Z5618 
INJECTION-PUMP ASSEMBLY
FE6TA
107692-5250  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 074 
16714Z5564 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 075 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16714Z5670 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 612 013 
 
INJECTION-PUMP ASSEMBLY
9 400 619 076 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z20 351 
16714Z5668 
INJECTION-PUMP ASSEMBLY
FE6TA
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 077 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16714Z5671 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 612 056 
 
INJECTION-PUMP ASSEMBLY
9 400 619 078 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z20 352 
16714Z5669 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top