107692-1431 ZEXEL 9 400 611 560 BOSCH INJECTION-PUMP ASSEMBLY 9400611560 1076921431 8976000061


 

Information injection-pump assembly

BOSCH 9 400 611 560 9400611560
ZEXEL 107692-1431 1076921431
ISUZU 8976000061 8976000061
107692-1431 INJECTION-PUMP ASSEMBLY
Rating:
28
Buy INJECTION-PUMP ASSEMBLY 107692-1431 zexel genuine, new aftermarket engine parts with delivery

Service parts 107692-1431 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-0420
3. GOVERNOR 105933-1211
4. SUPPLY PUMP 105237-6110
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105662-1650
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7753
11. Nozzle and Holder 8-94390-795-4
12. Open Pre:MPa(Kqf/cm2) 18.1{185}/22.1{225}
13. NOZZLE-HOLDER 105041-2131
14. NOZZLE
15. NOZZLE SET 105019-2200

Include in #1:

107692-1431 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
107692-1431 
107692-1432 
9 400 611 560 
8976000061  ISUZU
INJECTION-PUMP ASSEMBLY
6HH1 * K




Information:

Bridge Adjustment
Intake and Exhaust Valve Mechanism
(1) Adjustment locknut, (2) Exhaust bridge, (3) Adjustment locknut, (4) Intake bridgeThe valve bridge should be checked and/or adjusted each time valve clearance is checked and/or adjusted. Valve and valve mechanism components do not always wear evenly which can allow the bridge to be out of adjustment.It is not necessary to remove the rocker arm shaft to adjust the valve bridges, but there must be clearance. Use the procedure that follows to make an adjustment to the bridge. Valves must be fully closed.1. Remove the valve covers from the engine.2. Lubricate the bridge dowel, bridge bore and the top pad of the bridge assembly with engine oil.3. While firmly pressing straight down on the bridge pad with a force of 1 to 10 lb (0.5 to 4.5 kg), turn the adjusting screw clockwise (CW) until contact is made with the valve stem.4. Turn the adjusting screw clockwise (CW) an additional 45° (1/8 turn) to straighten the dowel in the guide and compensate for slack in the threads.5. Hold the adjusting screw in this position and tighten the adjustment locknut to a torque of 18 5 lb ft (25 7 N m).6. Put engine oil at the point where the rocker arms make contact with the bridges.Valve Lash (Clearance) and Unit Injector Preload Adjustment
Valve clearance is measured between the rocker arm and the bridge for the valves.
Measure the valve lash with the engine stopped. To obtain an accurate measurement, allow at least 20 minutes for the valves to cool to engine cylinder head and block temperature.
When the valve lash (clearance) is checked, an adjustment is NOT necessary if the measurement is within the range given in the "Valve Clearance Check" chart shown. If the measurement is outside of the valve clearance check range shown, an adjustment is necessary. See the "Valve Clearance Setting" chart shown and make the setting to the nominal (desired) specifications in this chart. Adjust the valve clearance to within .003 in ( 0.08 mm) of the value given in the chart above.Rotate the engine crankshaft 360° in the normal crankshaft rotation direction before any adjustments are made. Operation of Caterpillar engines with improper valve adjustments will reduce engine efficiency. This reduced efficiency could result in excessive fuel usage and/or shortened engine component life.
Cylinder and Valve LocationTo make an adjustment to the valve clearance, turn the adjustment screw in the rocker arm. Valve clearance adjustments can be made by using the following procedure. The No. 1 piston must be at top center (TC) on the compression stroke. Follow the first three steps to find top center position for piston No. 1.
Locating Top Center for Piston No. 1
(1) Bolts (two - 6V5219), (2) Cover, (3) Flywheel Housing1. Remove two bolts (1) and remove cover (2) from the flywheel housing (3) to open the turning hole.2. Put one of the 6V5219 bolts in the timing hole located approximately 5 to 6 inches (127 to 152 mm) above the turning hole in

Have questions with 107692-1431?





Group cross 107692-1431 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 611 961 
8943926900 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 612 593 
8943926901 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 013 
8943926902 
INJECTION-PUMP ASSEMBLY
6HH1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 611 638 
8943923901 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 404 
8943923902 
INJECTION-PUMP ASSEMBLY
6HH1
F 019 Z10 752 
8943923903 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 014 
8943923904 
INJECTION-PUMP ASSEMBLY
6HH1
 
8976000050 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 482 
8976000051 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 639 
8976000052 
INJECTION-PUMP ASSEMBLY
6HH1
 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

9 400 619 015 
8976000053 
INJECTION-PUMP ASSEMBLY
6HH1
 
8976000060 
INJECTION-PUMP ASSEMBLY
6HH1
107692-1431  

107692-1432 
9 400 611 560 
8976000061 
INJECTION-PUMP ASSEMBLY
6HH1
 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

 
8976000062 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 785 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

 
8943924960 
INJECTION-PUMP ASSEMBLY
6HH1
F 019 Z10 753 
8943924961 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 016 
8943924962 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 640 
8976000800 
INJECTION-PUMP ASSEMBLY
6HH1
 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

9 400 619 017 
8976000801 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 641 
8976003240 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 642 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

 
8976005760 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 612 389 
8976005761 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 018 
8976005762 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 728 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

 
8976005770 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 612 594 
8976005771 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 019 
8976005772 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 611 643 
 
INJECTION-PUMP ASSEMBLY
6HH1

Isuzu 

 
8976005780 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 612 390 
8976005781 
INJECTION-PUMP ASSEMBLY
6HH1
9 400 619 020 
8976005782 
INJECTION-PUMP ASSEMBLY
6HH1
Back to top