107692-1172 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1076921172 8943954961


 

Information injection-pump assembly

ZEXEL 107692-1172 1076921172
ISUZU 8943954961 8943954961
107692-1172 INJECTION-PUMP ASSEMBLY
Rating:
50
Buy INJECTION-PUMP ASSEMBLY 107692-1172 zexel genuine, new aftermarket engine parts with delivery

Service parts 107692-1172 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-0080
3. GOVERNOR 105933-0401
4. SUPPLY PUMP 105237-6110
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-2011
7. COUPLING PLATE 156638-6720
9. _
10. NOZZLE AND HOLDER ASSY 105118-5817
11. Nozzle and Holder 8-94394-606-5
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105048-3915
14. NOZZLE 105017-9000
15. NOZZLE SET

Include in #1:

107692-1172 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
107692-1172 
107692-1173 
 
8943954961  ISUZU
INJECTION-PUMP ASSEMBLY
6HE1-XN * K




Information:

Storage Procedure
1. Clean the outside of the engine and repaint areas that have paint damage with a good quality paint.2. Remove the batteries and use them in some other place or put them in storage where they can be checked and electrically charged again when needed. If the batteries are not removed, wash the tops. Put an electrical charge to the battery to a specific gravity of 1.275. Disconnect the battery terminals. Put a plastic cover over the battery.3. Loosen all fan, alternator belts, etc. Attach a tag to indicate what work has been done.4. Put a waterproof cover over engines with enclosures stored outdoors. Make the cover tight, but loose enough to allow air to circulate around the engine to prevent damage to exposed metal parts from condensation. Remove the waterproof cover every two or three months and check the engine for corrosion. If the engine has signs of corrosion at the check period, follow the protection procedure again. To operate the engine, it is not necessary to remove the preservative oil mixture. If a compartment under protection of VCI vapors is opened, put more VCI mixture in to make up for the vapor loss. Install all covers and/or put tape over all openings, air intake, exhaust openings, flywheel housing, crankcase breathers, dipstick tubes, etc. Make sure all covers are air tight and weatherproof. Use a waterproof, weather resistant tape.5. Put lubricant on all points given in the Lubrication and Maintenance Chart.6. Put a heavy amount of multipurpose grease on all outside parts that move; rod threads, ball joints, linkage, etc.7. Oil and oil filter elements used less than 50 hours in the engine do not need to be changed. (Otherwise, change the oil, filling the engine to the "add oil" mark on the dipstick.) Add 3% to 4% of VCI oil per engine volume. If the engine is drained, install a mixture of 50% VCI oil and 50% engine oil in the crankcase and in all lubricating oil compartments at the rate of one part VCI oil mixture per fifteen parts of compartment capacity at full level. If possible, operate the engine three to five minutes. Put tape over all openings to seal VCI vapors in the engine. If necessary, drain some lubricant to add to the mixture.8. Remove any dirt from the air cleaner. Check all seals and gaskets.9. Remove the air filter elements. Turn the engine at cranking speed with throttle control in fuel OFF position, remove pressure plug for boost pressure and use a sprayer to add a mixture of 50% VCI oil and 50% engine oil. Minimum application rate is 5.5 milliliters per liter (3 oz. per

Have questions with 107692-1172?





Group cross 107692-1172 ZEXEL

9 400 619 626 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 619 539 
8943954960 
INJECTION-PUMP ASSEMBLY
6HE1-XN
107692-1172  

107692-1173 
 
8943954961 
INJECTION-PUMP ASSEMBLY
6HE1-XN
9 400 619 627 
8943954962 
INJECTION-PUMP ASSEMBLY
6HE1-XN
9 400 611 109 
8943954963 
INJECTION-PUMP ASSEMBLY
6HE1-XN
Back to top