107692-0790 ZEXEL 9 400 619 621 BOSCH INJECTION-PUMP ASSEMBLY 9400619621 1076920790 16713z6317


 

Information injection-pump assembly

BOSCH 9 400 619 621 9400619621
ZEXEL 107692-0790 1076920790
NISSAN-DIESEL 16713Z6317 16713z6317
107692-0790 INJECTION-PUMP ASSEMBLY
Rating:
46
Buy INJECTION-PUMP ASSEMBLY 107692-0790 zexel genuine, new aftermarket engine parts with delivery

Service parts 107692-0790 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-1220
3. GOVERNOR 105923-0930
4. SUPPLY PUMP 105237-6240
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105663-0692
7. COUPLING PLATE 156638-7420
9. _
10. NOZZLE AND HOLDER ASSY 105160-4930
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105030-4870
14. NOZZLE 105025-2180
15. NOZZLE SET

Include in #1:

107692-0790 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 619 621 9400619621
ZEXEL 107692-0790 1076920790
NISSAN-DIESEL 16713Z6317 16713z6317


Zexel num
Bosch num
Firm num
Name
107692-0790 
107692-0810 
9 400 619 621 
16713Z6317  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6TA * K 14CG TICS MD-TI6 TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407910-3 03*
Selector switch no.   01
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   15
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   5.6 5.57 5.63
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   -
Rack position   13.8
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   112 110 114
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8+-0.5
Pump speed r/min   465 465 465
Average injection quantity mm3/st.   10.6 8.8 12.4
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   5.5+-0.0 3
PS407910-303* V   V1+0.05+ -0.01
PS407910-303* mm   5.5+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.8)
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   112 111 113
Basic   *
Fixing the lever   *
Boost pressure kPa   24 24
Boost pressure mmHg   180 180
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-1.7
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   105 101 109
Fixing the lever   *
Boost pressure kPa   24 24
Boost pressure mmHg   180 180
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 5
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2-0.6
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   33 29 37
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 5
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 5
Boost compensator adjustment
Pump speed r/min   350 350 350
Rack position   R2-0.6
Boost pressure kPa   5.3 4 6.6
Boost pressure mmHg   40 30 50
Boost compensator adjustment_02
Pump speed r/min   350 350 350
Rack position   R2[R1-3. 35]
Boost pressure kPa   10.7 10.7 10.7
Boost pressure mmHg   80 80 80
0000001601
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_03
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *
_04
CU407910-303*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_05
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_06
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 107692-0790
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=AB57 BCL=0.6+-0.1mm
----------

Speed control lever angle

Test data 107692-0790
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt setting
----------
aa=93.5mm
----------
a=18.5deg+-5deg b=34.5deg+-3deg

Stop lever angle

Test data 107692-0790
N:Pump normal S:Stop the pump. (1)At rack position aa, set the stopper bolt (pump speed bb r/min).
----------
aa=3+-0.3mm bb=0r/min
----------
a=20deg+-5deg b=42deg+-5deg

0000001301

Test data 107692-0790
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)Pre-stroke: aa (4)-
----------
aa=5.6+-0.03mm
----------
a=(20deg)

0000001401

Test data 107692-0790
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001701

Test data 107692-0790
A : Stopper pin B: Connector
----------

----------

0000001801

Test data 107692-0790
C:Shim
----------

----------

0000001901

Test data 107692-0790
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 107692-0790
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1400r/min Ra=R1(13.8)mm
----------

0000002301 SPEED SENSOR

Test data 107692-0790
(A) Flyweight projection (B) Pickup sensor (c) Lock nut Speed sensor installation (1)Install the speed sensor so that the clearance between the sensor and the flyweight projection is L. (This gap is the gap when the pickup sensor is returned 1 turn from where it contacts the flyweight tooth.)
----------
L=0.8~1mm
----------




Information:

Start By:a. remove fuel injection lines
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove bolts (1) and fan guard (2). 2. Loosen bolts (7), (9) and (10). Remove belts (8).3. Remove bolt (4) to clip. Remove grease line (3).4. Remove nuts (6). Remove cover (5) and the gasket. 5. Loosen bolt (12) enough to leave a gap of 3.18 mm (.125 in) between washers (11) and the fuel pump drive gear.6. Install tool (A) as shown. Tighten the stud to pull the fuel pump drive gear loose from the taper on the fuel injection pump camshaft.7. Remove tool (A), bolt (12), and washer (11). 8. Identify and disconnect wires (13).9. Remove tube assemblies (15) and (18).10. Remove two bolts (14), fuel transfer pump (17), and the O-ring seal.11. Remove bolts (16), the filter base, the gasket, and filter (19). 12. Fasten the fuel injection pump housing and governor to a hoist.13. Remove two bolts (22), three nuts (21), and the fuel injection pump housing and governor. The weight of the fuel injection pump housing and governor is 29 kg (64 lb.).14. Remove the two O-ring seals from the bottom of the fuel injection pump housing and governor. 15. Loosen screw (25). Remove two screws (26), control assembly (23) and spacers (24).Install Fuel Injection Pump Housing And Governor
Start By:a. remove fuel injection linesb. remove valve cover Number 1 piston must be set at top dead center (TDC) to perform all timing procedures. The engine is seen from the flywheel end when direction of crankshaft rotation is given. 1. Remove the starter.2. Install tool (B) on flywheel housing as shown.3. To find TDC for No. 1 piston;a. Turn the flywheel clockwise (opposite the direction of engine rotation) approximately 30 degrees. This removes all play from the timing gears. If you go past the bolt hole, you must repeat Step (a).b. Turn the flywheel counterclockwise until a 3/8" - 16 x 2 1/4" NC bolt (27) can be installed in the flywheel through the hole in the flywheel housing. The No. 1 and No. 6 pistons are now at top center position. The No. 1 piston is on the compression stroke when the valves of the No. 1 cylinder are closed. The rocker must be free to move up and down.4. If No. 1 piston is not on the compression stroke, remove the 3/8" - 16 x 2 1/4" NC bolt (27) and turn the flywheel 360° counterclockwise. Install the 3/8" bolt as before. The No. 1 piston is now at TDC.
Typical Example5. Install tooling (C) in the fuel injection pump housing as shown. Push on tooling (C) and turn injection pump camshaft (32). When tooling (C) engages the groove (slot) in the camshaft, the fuel injection pump is in the No. 1 piston TDC position.6. Be sure O-ring seals (28), (29), (30) and (31) are in position on the fuel injection pump housing and governor. Put clean engine oil

Have questions with 107692-0790?





Group cross 107692-0790 ZEXEL

Nissan-Diesel 

9 400 618 990 
16713Z6277 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 991 
16713Z6278 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 992 
16713Z6279 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 993 
16713Z6300 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 994 
16713Z6301 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 995 
16713Z6302 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 996 
16713Z6303 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 618 997 
16713Z6304 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 611 104 
16713Z6316 
INJECTION-PUMP ASSEMBLY
FE6TA
107692-0790  

107692-0810 
9 400 619 621 
16713Z6317 
INJECTION-PUMP ASSEMBLY
FE6TA