107692-0230 ZEXEL F 019 Z10 683 BOSCH INJECTION-PUMP ASSEMBLY f019z10683 1076920230 1671395176


 

Information injection-pump assembly

BOSCH F 019 Z10 683 f019z10683
ZEXEL 107692-0230 1076920230
NISSAN-DIESEL 1671395176 1671395176
107692-0230 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 107692-0230 zexel genuine, new aftermarket engine parts with delivery

Service parts 107692-0230 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-1050
3. GOVERNOR 105921-5620
4. SUPPLY PUMP 105237-6140
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105663-0660
7. COUPLING PLATE 156638-3020
9. _
10. NOZZLE AND HOLDER ASSY 105101-7231
11. Nozzle and Holder 1660095017
12. Open Pre:MPa(Kqf/cm2) 16.7(170)/21.6(220)
13. NOZZLE-HOLDER 105030-4390
14. NOZZLE 105015-8870
15. NOZZLE SET

Include in #1:

107692-0230 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
107692-0230 
107692-0390 
F 019 Z10 683 
1671395176  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
NE6TA * K 14CG TICS MD-TI6 TICS




Information:

Start By:a. remove oil pumpb. remove oil pan plate
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Turn the crankshaft until two pistons are at the bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the rod bearing from the rod bearing cap.
The connecting rod bolts are loose on the connecting rods and can fall out when the nuts are removed.
2. Push the connecting rods away from the crankshaft. Remove the upper half of the rod bearing from the connecting rod. Install the connecting rod bearings dry when the clearance checks are made. Put clean engine oil on the connecting rod bearings for final assembly.3. Install the upper half of the rod bearing in the connecting rod.4. Install the lower half of the rod bearing in the connecting rod cap. Be sure the tabs in the back of the connecting rod bearings are in the tab grooves of the connecting rod and cap. 5. Use Plastigage (A) to check the connecting rod bearing clearance.6. Put Plastigage (A) on the connecting rod bearing.7. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
When connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the nuts the additional 90°.
8. Install connecting rod cap (1). Install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft) Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more. Remove the connecting rod caps. Remove Plastigage (A) and measure the width of the Plastigage. The connecting rod clearance must be 0.076 to 0.168 mm (.0030 to .0066 in) for new bearings. The maximum clearance with used bearings is 0.25 mm (.010 in).9. Install the connecting rod caps and tighten the nuts as in Step 8.10. Do Steps 1 through 9 for the remainder of the connecting rod bearings.End By:a. install oil pan plateb. install oil pump
Perform Scheduled Oil Sampling on oil wetted compartments after performing service work to check for contaminants left in the system following repair. Contaminants put into the system may cause rapid wear and shortened component life.

Have questions with 107692-0230?





Group cross 107692-0230 ZEXEL

Nissan-Diesel 

 
1671395173 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 619 619 
1671395174 
INJECTION-PUMP ASSEMBLY
NE6TA
 
1671395175 
INJECTION-PUMP ASSEMBLY
NE6TA
107692-0230  

107692-0390 
F 019 Z10 683 
1671395176 
INJECTION-PUMP ASSEMBLY
NE6TA
 
16713Z6006 
INJECTION-PUMP ASSEMBLY
FE6TA
F 019 Z10 068 
16713Z6007 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6008 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6009 
INJECTION-PUMP ASSEMBLY
FE6TA
 
16713Z6010 
INJECTION-PUMP ASSEMBLY
FE6TA
9 400 619 620 
16713Z6011 
INJECTION-PUMP ASSEMBLY
FE6TA
Back to top