107691-2625 ZEXEL F 019 Z20 343 BOSCH INJECTION-PUMP ASSEMBLY f019z20343 1076912625 me170202


 

Information injection-pump assembly

BOSCH F 019 Z20 343 f019z20343
ZEXEL 107691-2625 1076912625
MITSUBISHI ME170202 me170202
107691-2625 INJECTION-PUMP ASSEMBLY
Rating:
61
Buy INJECTION-PUMP ASSEMBLY 107691-2625 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
107691-2625 
F 019 Z20 343 
ME170202  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D16T2 K 14CG INJECTION PUMP ASSY TICS MD-TI6 TICS




Information:

start by:a) remove pistons1. Remove the bearings from the connecting rod and connecting rod cap. 2. Remove retainer ring (1) with tool (C).3. Remove pin (2) and the connecting rod (4) from the piston (3). 4. Remove the piston rings from the piston with tool (A). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTION, Form No. SMHS7295.5. Heat the connecting rod in an oven to a temperature of 350°-500°F (177°-260°C). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (B). Put a new rod pin bearing (5) on the adapter part of tooling (B). Make sure that the joint in the rod pin bearing is 90° from a center line through the crankshaft and pin bearing bores. 7. Install the pusher adapter (7) and pusher (8) part of tooling (B) on the adapter. The old bearing is pushed out by tooling (B) as the new bearing is installed.8. Use tooling (B) to push the new bearing into the connecting rod until the push adapter of tooling (B) makes full contact with the connecting rod surface.9. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 2.0012 .0003 in. (50.830 0.008 mm).10. Check the clearance between the ends of the piston rings. See PISTONS AND RINGS in SPECIFICATIONS.11. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint. 12. Install the oil ring on the piston with tool (A).13. Install the second (intermediate) piston ring with the side that has the identification "UP-2" toward the top of the piston with tool (A).14. Install the first (top) piston ring with the side that has the identification "UP-1" toward the top of the piston with tool (A). After the installation of all three piston rings, put the piston ring in position so the end gaps are 120° apart. 15. Put piston (3) in position on connecting rod (4). Put clean engine oil on pin (2) and install the pin. Install retainer rings (1) with tool (C). Make sure the retainer rings are in the grooves of the piston.16. Install the bearings in the connecting rod and connecting rod cap.end by:a) install pistons

Have questions with 107691-2625?





Group cross 107691-2625 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 611 634 
 
INJECTION-PUMP ASSEMBLY
6D16T2
9 400 613 401 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

107691-2625  
F 019 Z20 343 
ME170202 
INJECTION-PUMP ASSEMBLY
6D16T2
Back to top