107691-2551 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1076912551


 

Information injection-pump assembly

ZEXEL 107691-2551 1076912551
107691-2551 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 107691-2551 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 107691-2551 1076912551


Zexel num
Bosch num
Firm num
Name
107691-2551 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
RED3 control unit part number   407910-2 470
RED3 rack sensor specifications mm   15
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   17
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   5.6 5.57 5.63
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.75 60.25
Difference between angles 2
Cal 1-3
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cyl.1-2
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-4
deg.   300 299.75 300.25
Injection quantity adjustment
Rack position   (11)
Vist V   1.8 1.8 1.8
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   120.5 119.5 121.5
Max. variation between cylinders %   0 -3 3
Basic   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 5
Injection quantity adjustment_02
Rack position   (6)
Vist V   2.8 2.7 2.9
Pump speed r/min   440 440 440
Average injection quantity mm3/st.   15.5 13.7 17.3
Max. variation between cylinders %   0 -15 15
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   5.5+-0.0 3
Remarks
Refer to items regarding the pre-stroke actuator
 
Governor adjustment
Pump speed r/min   1250--
Advance angle deg.   0 0 0
Remarks
Start
 
Governor adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Governor adjustment_03
Pump speed r/min   1470
Advance angle deg.   3 2.5 3.5
Remarks
Finish
 
0000001201
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_03
CU407980-224*   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Speed control lever angle

Test data 107691-2551
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Rack position bb
----------
aa=16mm bb=1mm
----------
a=26deg+-5deg b=29deg+-5deg

0000000901

Test data 107691-2551
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)Pre-stroke: bb
----------
aa=5deg bb=5.6+-0.03mm
----------
a=(0deg)

Stop lever angle

Test data 107691-2551
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001301

Test data 107691-2551
A : Stopper pin B: Connector
----------

----------

0000001401

Test data 107691-2551
C:Shim
----------

----------

0000001501

Test data 107691-2551
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully clockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the counterclockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000001701

Test data 107691-2551
(Rs) rack sensor specifications (C/U) control unit part number (V) Rack sensor output voltage (R) Rack position (mm) 1. Confirming governor output characteristics (rack 15 mm, span 6 mm) (1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------

----------

0000001901 RACK SENSOR

Test data 107691-2551
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (154610-0620) (1)At governor side rack sensor output voltage V1, adjust the bobbin (A) so that the drive side rack sensor output voltage is VR+-0.01. (2)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
V1=1V
----------




Information:

start by:a) remove fuel ratio controlb) remove shut off solenoid 1. Put a mark of identification on the shaft and lever (1) for correct location at assembly. Loosen the bolt and remove lever (1) from the shaft. 2. Remove the bolts, cover (3) and the gasket.3. Remove the bolt, high idle housing (2) and the gasket. 4. Remove the bolt and housing (4) from the governor. 5. Remove bolt (6) from the stop collar.6. Remove stop collar (5) and the spring from the shaft. 7. Remove the plug from the fuel injection pump housing and install tool (A) with square end (flat end) down. Move the governor control to the "FUEL ON" position until the right rack stops against the timing pin. The racks are now in the center (zero) position. 8. Remove bolts (8) that hold the governor housing to the fuel injection pump housing.9. Remove governor housing (7). 10. Disconnect lines (10) and (11) at the governor control plate.11. Remove the bolts, governor control plate (9) and gasket.
Cover the fuel injection pump housing to keep dirt and all foreign material out of the pump housing.
The drive assembly must be removed from the governor control plate before the control plate can be installed. 12. Remove retainer ring (12) from the drive assembly. 13. Remove dowel (14) and drive assembly (13) from the governor control plate.Install Governor (Later)
Make sure there is no dirt or foreign material in the pump housing.
1. Put gasket (2) in position and install governor control plate (1) and the bolts. 2. Put governor drive (3) in position. Make an alignment of the groove (slot) in the bottom end of the governor drive with the notch in the end of the drive pinion assembly.3. Align the marks on the top of drive (3), stop (4) and the gear. 4. Install dowel (5) in the hole in the gear and stop (4). 5. Install retainer ring (6) on the gear. 6. Put the gasket and governor housing (7) in position on the plate. Install the bolts.7. Connect two lines (8) to the plate. 8. Put spring (11) and collar (9) in position on the shaft. Make an alignment of screw (10) and the groove in the shaft. Tighten screw (10).9. Check the fuel rack setting at this time. See FUEL RACK SETTING in TESTING AND ADJUSTING. 10. If nut (13) was loosened it must be tightened at this time. Tighten nut (13) to a torque of 9 3 lb.ft. (12 4 N m).11. Put the gasket and cover (12) in position. Make sure lever (14) is in position under the collar. Install the bolt that holds cover (12) to the housing. 12. Put the gasket and cover (16) in position and install the bolt.13. Install the gasket, plate (15) and the bolts. 14. Make an alignment of the mark on the shaft with mark on lever (17) and install the lever. Tighten the bolt.
If the lever and the shaft are not in correct alignment,

Have questions with 107691-2551?





Group cross 107691-2551 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
107691-2551  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 922 
ME072841 
INJECTION-PUMP ASSEMBLY
6D17-1
Back to top