107691-2020 ZEXEL 9 400 610 270 BOSCH INJECTION-PUMP ASSEMBLY 9400610270 1076912020


 

Information injection-pump assembly

BOSCH 9 400 610 270 9400610270
ZEXEL 107691-2020 1076912020
107691-2020 INJECTION-PUMP ASSEMBLY
Rating:
66
Buy INJECTION-PUMP ASSEMBLY 107691-2020 zexel genuine, new aftermarket engine parts with delivery

Service parts 107691-2020 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-1070
3. GOVERNOR 105921-5292
4. SUPPLY PUMP 105237-4140
5. AUTOM. ADVANCE MECHANIS 105681-1090
6. COUPLING PLATE 105663-0760
7. COUPLING PLATE
9. _
10. NOZZLE AND HOLDER ASSY 105118-5381
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6(220)
13. NOZZLE-HOLDER 105048-3730
14. NOZZLE 105017-1221
15. NOZZLE SET

Include in #1:

107691-2020 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 270 9400610270
ZEXEL 107691-2020 1076912020


Zexel num
Bosch num
Firm num
Name
107691-2020 
107691-2021 
9 400 610 270 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-8520
Overflow valve opening pressure kPa   255 255 255
Overflow valve opening pressure kgf/cm2   2.6 2.6 2.6
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   14
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   5.6 5.57 5.63
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.75 60.25
Difference between angles 2
Cal 1-3
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cyl.1-2
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-4
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   -
Rack position   10.8
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   77 75.4 78.6
Max. variation between cylinders %   0 -13 13
Basic   *
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   7.5+-0.5
Pump speed r/min   670 670 670
Average injection quantity mm3/st.   9 7.5 10.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.8)
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   77 76 78
Basic   *
Fixing the lever   *
Boost pressure kPa   48 48
Boost pressure mmHg   360 360
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+1.45
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   91.4 87.4 95.4
Fixing the lever   *
Boost pressure kPa   48 48
Boost pressure mmHg   360 360
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Injection quantity adjustment_05
Adjusting point   C
Rack position   R3(R1-0. 9)
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   37.1 33.1 41.1
Fixing the lever   *
Boost pressure kPa   48 48
Boost pressure mmHg   360 360
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Injection quantity adjustment_06
Adjusting point   D
Rack position   R3-0.9
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   21 17 25
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   R3-0.9
Boost pressure kPa   15.3 14 16.6
Boost pressure mmHg   115 105 125
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   R3(R1-0. 9)
Boost pressure kPa   34.7 34.7 34.7
Boost pressure mmHg   260 260 260
Timer adjustment
Pump speed r/min   1070--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1020
Advance angle deg.   0 -0.5 0
Timer adjustment_03
Pump speed r/min   1080
Advance angle deg.   -1.3 -1.8 -0.8
Remarks
Finish
 
0000001601
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
_03
CU407980-224*   *
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 107691-2020
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=G34 BCL=0.9+-0.1mm
----------

Speed control lever angle

Test data 107691-2020
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=24deg+-5deg b=40deg+-3deg

Stop lever angle

Test data 107691-2020
N:Pump normal S:Stop the pump. (1)Set the stopper bolt at speed = aa and rack position = bb and confirm non-injection.
----------
aa=1670r/min bb=4.5-0.5mm
----------
a=15deg+-5deg b=38deg+-5deg

0000001301

Test data 107691-2020
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)Pre-stroke: bb
----------
aa=6deg bb=5.6+-0.03mm
----------
a=(7deg)

0000001401

Test data 107691-2020
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001701

Test data 107691-2020
A : Stopper pin B: Connector
----------

----------

0000001801

Test data 107691-2020
C:Shim
----------

----------

0000001901

Test data 107691-2020
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 107691-2020
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1500r/min Ra=R1(10.8)+1.45mm
----------

0000002301 SPEED SENSOR

Test data 107691-2020
(A) Flyweight projection (B) Pickup sensor (c) Lock nut Speed sensor installation (1)Install the speed sensor so that the clearance between the sensor and the flyweight projection is L. (This gap is the gap when the pickup sensor is returned 1 turn from where it contacts the flyweight tooth.)
----------
L=0.8~1mm
----------




Information:

2. Disconnect the fuel injection lines (2) from pump housing. Put plugs or caps in all lines and openings.3. Remove the three bolts that hold the fuel filter (3) to the aftercooler housing.4. Disconnect the sensing line (1) for the fuel ratio control from the aftercooler housing. 5. Disconnect the oil supply line (4) from the turbocharger.6. Remove the two water lines (5). 7. Disconnect the water outlet line (6) for the air compressor from the cylinder head.8. Remove the bolts (7) that fasten the cylinder head to the cylinder block. 9. Install 3/8"-16NC forged eyebolts in the cylinder head. Fasten a hoist and remove the cylinder head assembly. Weight of cylinder head assembly is 575 lb. (260 kg). Be sure to install a new gasket between the spacer plate and the cylinder block before installing the cylinder head assembly. See REMOVE and INSTALL SPACER PLATE in DISASSEMBLY AND ASSEMBLY.Install Cylinder Head Assembly
1. Clean the top surface of spacer plate and the surface it is in contact with on the cylinder head.2. Install the cylinder head gasket, water seals, and gasket on timing gear cover. 3. Install the 3/8"-16NC forged eyebolts in the cylinder head. Fasten a hoist and put the cylinder head assembly into position on the engine. Make sure the gear (1) in cylinder head is engaged with drive gear (2). 4. Put 9M3710 Anti-Seize Compound on the threads of the bolts for cylinder head. Install the bolts and washers. Tighten the bolts as follows: 1 -Tighten all bolts in number order to 135 lb.ft. (18.7 mkg).2 -Tighten all bolts in number order to 185 5 lb.ft. (25.6 0.7 mkg).3 -Tighten all bolts using hand torque only to 185 5 lb.ft. (25.6 0.7 mkg). 5. Install the two water lines (4).6. Connect the oil supply line (3) to the turbocharger.7. Connect the water outlet line (5) for the air compressor to the cylinder head. 8. Connect the sensing line (6) for the fuel ratio control to the aftercooler housing.9. Put the fuel filter in position, and install the three bolts.10. Remove the plugs and fuel injection lines and pumps. Connect the fuel injection lines (7) to the pumps. Tighten the nuts on fuel lines to 30 5 lb.ft. (4.1 0.7 mkg).11. Fill the cooling system with coolant.end by: a) install camshaft housingb) install fan drive

Have questions with 107691-2020?





Group cross 107691-2020 ZEXEL

F 019 Z10 667 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 668 
 
INJECTION-PUMP ASSEMBLY
9 400 619 562 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 453 
 
INJECTION-PUMP ASSEMBLY
9 400 618 879 
 
INJECTION-PUMP ASSEMBLY
6D31T2

Mitsubishi 

F 019 Z20 318 
ME086683 
INJECTION-PUMP ASSEMBLY
6D31T2
F 019 Z10 669 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 670 
 
INJECTION-PUMP ASSEMBLY
9 400 619 563 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 454 
 
INJECTION-PUMP ASSEMBLY
9 400 618 880 
 
INJECTION-PUMP ASSEMBLY
6D31T2

Mitsubishi 

F 019 Z20 319 
ME086684 
INJECTION-PUMP ASSEMBLY
6D31T2
107691-2020  

107691-2021 
9 400 610 270 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 317 
ME086718 
INJECTION-PUMP ASSEMBLY
6D31T2
F 019 Z10 455 
ME075434 
INJECTION-PUMP ASSEMBLY
6D16T2
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 612 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 618 881 
 
INJECTION-PUMP ASSEMBLY
6D16T2

Mitsubishi 

F 019 Z20 320 
ME075514 
INJECTION-PUMP ASSEMBLY
6D16T2
F 019 Z10 456 
ME075435 
INJECTION-PUMP ASSEMBLY
6D16T4
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 564 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 224 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 618 882 
 
INJECTION-PUMP ASSEMBLY
6D16T4

Mitsubishi 

F 019 Z20 321 
ME075515 
INJECTION-PUMP ASSEMBLY
6D16T4
9 400 618 883 
 
INJECTION-PUMP ASSEMBLY
6D31T2

Mitsubishi 

F 019 Z20 322 
ME086723 
INJECTION-PUMP ASSEMBLY
6D31T2
9 400 618 884 
 
INJECTION-PUMP ASSEMBLY
6D31T2

Mitsubishi 

F 019 Z20 323 
ME086724 
INJECTION-PUMP ASSEMBLY
6D31T2
9 400 610 301 
ME086725 
INJECTION-PUMP ASSEMBLY
6D31T2
F 019 Z10 711 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

F 019 Z10 712 
ME075436 
INJECTION-PUMP ASSEMBLY
6D16T4
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 613 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 081 
 
INJECTION-PUMP ASSEMBLY
9 400 618 885 
 
INJECTION-PUMP ASSEMBLY
6D16T4

Mitsubishi 

F 019 Z20 324 
ME075516 
INJECTION-PUMP ASSEMBLY
6D16T4
F 019 Z10 080 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 886 
ME075403 
INJECTION-PUMP ASSEMBLY
6D17
Back to top