107691-2000 ZEXEL F 019 Z10 667 BOSCH INJECTION-PUMP ASSEMBLY f019z10667 1076912000


 

Information injection-pump assembly

BOSCH F 019 Z10 667 f019z10667
ZEXEL 107691-2000 1076912000
107691-2000 INJECTION-PUMP ASSEMBLY
Rating:
54
Buy INJECTION-PUMP ASSEMBLY 107691-2000 zexel genuine, new aftermarket engine parts with delivery

Service parts 107691-2000 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107069-1070
3. GOVERNOR 105921-5292
4. SUPPLY PUMP 105237-4140
5. AUTOM. ADVANCE MECHANIS 105681-1090
6. COUPLING PLATE 105663-0760
7. COUPLING PLATE
9. _
10. NOZZLE AND HOLDER ASSY 105118-5381
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6(220)
13. NOZZLE-HOLDER 105048-3730
14. NOZZLE 105017-1221
15. NOZZLE SET

Include in #1:

107691-2000 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
107691-2000 
107691-2001 
F 019 Z10 667 
   
INJECTION-PUMP ASSEMBLY
* K




Information:

Illustration 21 shows the direction the rack moves when the fuel injector is receiving fuel.
Illustration 22 g01455811
Illustration 1 - Flowchart for the Air in Fuel Test (Test F)
Illustration 23 g01455812
Illustration 2 - Flowchart for the Air in Fuel Test (Test F)Fuel Injector Cranking Test (Test G)
Note: The fuel injector cranking test checks for worn out injectors by measuring the cranking rack.
Illustration 24 g01412134
(3) The rack control (4) The number one fuel injectorNote: Refer to Illustration 24 for the location of the rack control and the location of the number one injector.
Illustration 25 g01412115
Flowchart for the Fuel Injector Cranking Test (Test G)Fuel Shutoff Solenoid Test (Test H)
Note: The fuel shutoff solenoid test determines if the fuel shutoff solenoid and wiring harness are operating properly.
Illustration 26 g01412143
Flowchart for the Fuel Shutoff Solenoid Test (Test H)Fuel Ratio Control (FRC) Setting Test (Test I)
Note: The FRC setting test checks the FRC setting.
Illustration 27 g01412145
Flowchart for the Fuel Ratio Control (FRC) Setting Test (Test I)Governor Servo Retaining Ring Test (Test J)
Note: Do not run the engine during this test.Note: The governor servo retaining ring test checks for faulty internal parts of the governor.
Illustration 28 g01422811
(1) Paddle
Illustration 29 g01422821
(2) Clevis pin
Illustration 30 g01412147
Flowchart for the Governor Servo Retaining Ring Test (Test J)Fuel Transfer Pump Test (Test K)
Note: The fuel transfer pump test is a visual inspection of the fuel transfer pump components.
Illustration 31 g01412150
(1) Screen (2) Inlet check valve (3) Spring (4) Bolt (5) Piston (6) Outlet check valve (7) Freeze plug (8) Piston check valve (9) Passage (10) Tappet Assembly (11) CamNote: Refer to Illustration 31 for the location of the components for the fuel transfer pump.
Illustration 32 g01412149
Flowchart for the Fuel Transfer Pump Test (Test K)Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)
Note: The FRC diaphragm leak test checks for a leaking FRC diaphragm.
Illustration 33 g01412154
Flowchart for the Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)

Have questions with 107691-2000?





Group cross 107691-2000 ZEXEL

107691-2000  

107691-2001 
F 019 Z10 667 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 668 
 
INJECTION-PUMP ASSEMBLY
9 400 619 562 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 453 
 
INJECTION-PUMP ASSEMBLY
9 400 618 879 
 
INJECTION-PUMP ASSEMBLY
6D31T2

Mitsubishi 

F 019 Z20 318 
ME086683 
INJECTION-PUMP ASSEMBLY
6D31T2
Back to top