107492-2051 ZEXEL F 019 Z10 222 BOSCH INJECTION-PUMP ASSEMBLY f019z10222 1074922051


 

Information injection-pump assembly

BOSCH F 019 Z10 222 f019z10222
ZEXEL 107492-2051 1074922051
107492-2051 INJECTION-PUMP ASSEMBLY
Rating:
20
Buy INJECTION-PUMP ASSEMBLY 107492-2051 zexel genuine, new aftermarket engine parts with delivery

Service parts 107492-2051 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 107049-3070
3. GOVERNOR 105921-7282
4. SUPPLY PUMP 105237-6300
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-6920
9. _
10. NOZZLE AND HOLDER ASSY 105118-5381
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105048-3730
14. NOZZLE 105017-1221
15. NOZZLE SET

Include in #1:

107492-2051 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 222 f019z10222
ZEXEL 107492-2051 1074922051


Zexel num
Bosch num
Firm num
Name
107492-2051 
107492-2052 
F 019 Z10 222 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8240
Nozzle   105780-0110
Nozzle holder   105780-2170
Opening pressure MPa   20.6
Opening pressure kgf/cm2   210
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407910-3 03*
Selector switch no.   02
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   01
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   5.6 5.57 5.63
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.75 90.25
Difference between angles 2
Cal 1-4
deg.   180 179.75 180.25
Difference between angles 3
Cyl.1-2
deg.   270 269.75 270.25
Injection quantity adjustment
Adjusting point   -
Rack position   12.5
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   93 91.4 94.6
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8.5+-0.5
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   10 8.5 11.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.5)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   93 92 94
Basic   *
Fixing the lever   *
Boost pressure kPa   44 44
Boost pressure mmHg   330 330
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 3
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+1.55
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   100.5 96.5 104.5
Fixing the lever   *
Boost pressure kPa   44 44
Boost pressure mmHg   330 330
PS407980-224* V   2.25+-0. 01
PS407980-224* mm   3.6+-0.0 3
PS407910-303* V   2.25+-0. 01
PS407910-303* mm   3.6+-0.0 3
Boost compensator adjustment
Pump speed r/min   300 300 300
Rack position   R2-0.9
Boost pressure kPa   21.3 20 22.6
Boost pressure mmHg   160 150 170
Boost compensator adjustment_02
Pump speed r/min   300 300 300
Rack position   R2(R1-0. 85)
Boost pressure kPa   30.7 30.7 30.7
Boost pressure mmHg   230 230 230
0000001601
CU407980-224*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_02
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
_03
CU407980-224*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *
_04
CU407910-303*   *
Actuator retarding type   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.5 2.45 2.55
Output voltage V   2.83 2.82 2.84
Adjustment   *
_05
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.6 5.57 5.63
Output voltage V   1.2 1 1.4
Confirmation   *
_06
CU407910-303*   *
Supply voltage V   12 11.5 12.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 107492-2051
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=J47 BCL=0.9+-0.1mm
----------

Speed control lever angle

Test data 107492-2051
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=22deg+-5deg b=(37.5deg)+-3deg

Stop lever angle

Test data 107492-2051
N:Pump normal S:Stop the pump. (1)At pump speed aa and rack position bb, set the stopper bolt. Confirm non-injection. (2)After setting stopper bolt, confirm non-injection at pump speed cc.
----------
aa=1450r/min bb=6.2-0.5mm cc=300r/min
----------
a=36.5deg+-5deg b=(33deg)+-5deg

0000001301

Test data 107492-2051
(1)Pump vertical direction (2)Position of gear mark '3' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)Pre-stroke: bb
----------
aa=7deg bb=5.6+-0.03mm
----------
a=(130deg)

0000001401

Test data 107492-2051
(1)Pointer (2)Injection timing aligning mark (3)Fly weight (4)The actual shape and direction may be different from this illustration. Operation sequence 1. Turn the prestroke actuator OFF. 2. Turn the camshaft as far as the No.1 cylinder's beginning of injection position. 3. Check that the pointer alignment mark of the injection pump and the alignment mark of the flywheel are matching. 4. If they are not matching, erase the alignment mark on the flywheel side, and stamp an alignment mark on the flywheel position that matches with the pointer side alignment mark. 5. Check again that the coupling's key groove position is in the No.1 cylinder's beginning of injection position.
----------

----------

0000001701

Test data 107492-2051
A : Stopper pin B: Connector
----------

----------

0000001801

Test data 107492-2051
C:Shim
----------

----------

0000001901

Test data 107492-2051
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 107492-2051
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1500r/min Ra=R1(12.5)+1.55mm
----------




Information:

General Instructions
These instructions are a review of many items which a serviceman encounters in servicing and maintaining a truck engine.PROBLEM ANALYZING: In analyzing a system malfunction, use this systematic procedure to locate and correct the problem. 1. Determine problem.2. List possible causes.3. Devise checks.4. Conduct checks in logical order to determine cause.5. Consider remaining service life against cost of parts and labor.6. Make necessary repair.7. Recheck.SAFETY: Your safety and that of others is always the number one consideration when servicing or maintaining trucks and truck engines. Safety is a matter of thoroughly understanding the job to be done and the application of good common sense. It is not just a matter of "do's" and "don'ts".CLEANLINESS: The most important single item in assuring long engine life is to keep dirt out of vital working parts. Precautions have been taken to safeguard against this. Enclosed compartments, seals and filters have been provided to keep the supply of air, fuel, coolant and lubricants clean. It is important that these safeguards be maintained.Whenever fuel, lubricating oil, coolant lines or air lines are disconnected, clean the point of disconnection as well as the adjacent area. As soon as the disconnection is made, cap, plug or tape the line or opening to prevent entry of foreign material. The same recommendations for cleaning and covering apply when access covers or inspection plates are removed.Clean and inspect all parts. Be sure all passages and holes are open. Cover all parts to keep them clean. Be sure parts are clean when they are installed. Leave new parts in their containers until ready for assembly.REMOVAL AND INSTALLATION: Use a hoist to remove heavy components. Engine removal should be accomplished by using an adjustable lifting beam. All supporting members (chains and cables) should be parallel to each other and as near perpendicular as possible to the top of the object being lifted.
LIFTING COMPONENTSWhen it is necessary to remove a component on an angle, remember that the capacity of an eyebolt diminishes as the angle between the supporting members and the object becomes less than 90°. Eyebolts and brackets should never be bent and should only have stress in tension.Some removals require the use of lifting fixtures to obtain proper balance and to provide safe handling.If a part resists removal, check to be certain all nuts and bolts have been removed and that an adjacent part is not interfering.DISASSEMBLY AND ASSEMBLY: When servicing or repairing the engine, complete each step in turn. Do not partially assemble one part and start assembling some other part. Make all adjustments as recommended. Always check the job after it is completed to see nothing has been overlooked.BOLTS AND BOLT TORQUE: Use bolts of the correct length. A bolt which is too long may "bottom" before the head is tight against the part it is to hold and cause failure. The threads in the assembly can also become damaged when a "long" bolt is used.If a bolt is too short, there may not be enough

Have questions with 107492-2051?





Group cross 107492-2051 ZEXEL

F 019 Z10 040 
 
INJECTION-PUMP ASSEMBLY
107492-2051  

107492-2052 
F 019 Z10 222 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 618 846 
 
INJECTION-PUMP ASSEMBLY
4D34T3

Mitsubishi 

F 019 Z20 298 
ME015230 
INJECTION-PUMP ASSEMBLY
4D34T3
Back to top