106991-1262 ZEXEL F 019 Z10 919 BOSCH INJECTION-PUMP ASSEMBLY f019z10919 1069911262 1156026652


 

Information injection-pump assembly

BOSCH F 019 Z10 919 f019z10919
ZEXEL 106991-1262 1069911262
ISUZU 1156026652 1156026652
106991-1262 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 106991-1262 zexel genuine, new aftermarket engine parts with delivery

Service parts 106991-1262 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106099-9201
3. GOVERNOR 105488-1570
4. SUPPLY PUMP 105237-4100
5. AUTOM. ADVANCE MECHANIS 105693-0261
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7851
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/22.1(225)
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-8200
15. NOZZLE SET

Include in #1:

106991-1262 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106991-1262 
106991-1263 
F 019 Z10 919 
1156026652  ISUZU
INJECTION-PUMP ASSEMBLY
10PD1-H * K




Information:


Rework Procedure
Replacement of Diesel Oxidation Catalyst (DOC):
1. Remove three 222-8823 Bolts and three 232-3209 Washers to separate the 360-8875 Bellows Tube Assembly from the 360-8849 Catalytic Converter Group. Refer to Image1.1.1.
Image1.1.1
2. Loosen the clamp. Remove the DOC from the Catalytic Converter Group. Refer to Images1.2.1 and 1.2.2.
Image1.2.1
Image1.2.2
3. Remove the ring from the DOC. Remove the clamp from the catalytic converter. Refer to Images1.3.1 and 1.3.2.
Image1.3.1
Image1.3.2
4. Remove the five screws and five washers from the insulation around the DOC. Remove the insulation from the DOC. The insulation will be reused. Refer to Images1.4.1 and 1.4.2.
Image1.4.1
Image1.4.2
5. Install the insulation that was removed from the old DOC on to the new DOC. Refer to Image1.5.1.
Image1.5.1
6. Clean the sealing surface of the DOC flange. Clean the sealing surface of the flange on the catalytic converter group. Clean the ring that was removed from the old DOC. Refer to Images1.6.1, 1.6.2, and 1.6.3.
Image1.6.1
Image1.6.2
Image1.6.3
7. Apply seal paste to both sides of the ring, to the flange surfaces of the new DOC, and the catalytic converter. Refer to Image1.7.1.
Note: Make sure to cover the complete ring and flange surfaces with seal paste when applying it.
Image1.7.1
8. Place the ring on the flange of the new DOC. Position the new DOC against the catalytic converter. Refer to Images1.8.1 and 1.8.2.
Image1.8.1
Image1.8.2
9. Orient the DOC so that it will line up correctly with the bellows tube. Install and orient the clamp in order to hold the new DOC in place. Apply sealing paste or high temperature grease to the bolt of the clamp. Tighten the clamp. Then reattach the DOC to the bellows tube. Refer to Image1.9.1.
Image1.9.1
10. Tap the clamp around the circumference to properly seat the clamp. Tighten the clamp to a specified torque of 18 N.m (13.3 ft-lb). Apply sealing paste or high temperature grease to the three 222-8823 Bolts to assemble the bellows. Refer to Image1.10.1.
Image1.10.1
11. Write down the number of active regenerations. This number can be found in the Monitor Service Menu in the Aftertreatment Status section. Enter this information to the claim story when you submit your claim. Refer to Image1.11.1.
Image1.11.1

Have questions with 106991-1262?





Group cross 106991-1262 ZEXEL

Isuzu 

 
1156026650 
INJECTION-PUMP ASSEMBLY
10PD1-S
 
1156026651 
INJECTION-PUMP ASSEMBLY
10PD1-H
106991-1262  

106991-1263 
F 019 Z10 919 
1156026652 
INJECTION-PUMP ASSEMBLY
10PD1-H
 
1156026653 
INJECTION-PUMP ASSEMBLY
10PD1-H
 
1156026654 
INJECTION-PUMP ASSEMBLY
10PD1-H
F 019 Z10 743 
1156026655 
INJECTION-PUMP ASSEMBLY
10PD1-H
9 400 618 748 
1156026656 
INJECTION-PUMP ASSEMBLY
10PD1-H
Back to top