106991-1022 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1069911022 1156025002


 

Information injection-pump assembly

ZEXEL 106991-1022 1069911022
ISUZU 1156025002 1156025002
106991-1022 INJECTION-PUMP ASSEMBLY
Rating:
14
Buy INJECTION-PUMP ASSEMBLY 106991-1022 zexel genuine, new aftermarket engine parts with delivery

Service parts 106991-1022 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106099-9100
3. GOVERNOR 105488-1281
4. SUPPLY PUMP 105237-1390
5. AUTOM. ADVANCE MECHANIS 105687-0310
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7851
11. Nozzle and Holder 1-15300-204-1
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/22.1{225}
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-8200
15. NOZZLE SET

Include in #1:

106991-1022 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106991-1022 1069911022
ISUZU 1156025002 1156025002


Zexel num
Bosch num
Firm num
Name
106991-1022 
106991-1025 
 
1156025002  ISUZU
INJECTION-PUMP ASSEMBLY
12PD1-C *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve (drive side)   134424-4020
Overflow valve opening pressure (drive side) kPa   255 221 289
Overflow valve opening pressure (drive side) kgf/cm2   2.6 2.25 2.95
Overflow valve (governor side)   134424-4020
Overflow valve opening pressure (governor side) kPa   255 221 289
Overflow valve opening pressure (governor side) kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-9-8- 5-2-11-1 0-3-6-7-
Pre-stroke mm   4.2 4.17 4.23
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   15 14.75 15.25
Difference between angles 2
Cal 1-9
deg.   60 59.75 60.25
Difference between angles 3
Cal 1-8
deg.   75 74.75 75.25
Difference between angles 4
Cal 1-5
deg.   120 119.75 120.25
Difference between angles 5
Cyl.1-2
deg.   135 134.75 135.25
Difference between angles 6
Cal 1-11
deg.   180 179.75 180.25
Difference between angles 7
Cal 1-10
deg.   195 194.75 195.25
Difference between angles 8
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 9
Cal 1-6
deg.   255 254.75 255.25
Difference between angles 10
Cal 1-7
deg.   300 299.75 300.25
Difference between angles 11
Cal 1-12
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   A
Rack position   8.3
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   107.8 106.3 109.3
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   8.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   109.4 107.4 111.4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   7.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   116.9 114.9 118.9
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   4.8+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   8.7 7.4 10
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Timer adjustment
Pump speed r/min   600--
Advance angle deg.   0 0 0
Load   4/4
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   550
Advance angle deg.   0.3
Load   4/4
Timer adjustment_03
Pump speed r/min   800+-30
Advance angle deg.   2 1.5 2.5
Load   4/4
Timer adjustment_04
Pump speed r/min   900
Advance angle deg.   2 1.5 2.5
Load   3/4
Timer adjustment_05
Pump speed r/min   1100
Advance angle deg.   5.5 5 6
Load   4/4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106991-1022
N:Pump speed R:Rack position (mm) (1)Lever ratio: RT (2)Target shim dimension: TH (3)Tolerance for racks not indicated: +-0.05mm. (4)Damper spring setting
----------
RT=0.8 TH=2.1mm
----------

Speed control lever angle

Test data 106991-1022
F:Full speed
----------

----------
a=6deg+-5deg

0000000901

Test data 106991-1022
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=33deg+-3deg

Stop lever angle

Test data 106991-1022
N:Pump normal S:Stop the pump.
----------

----------
a=60deg+-5deg b=73deg+-5deg

Timing setting

Test data 106991-1022
(1)Pump vertical direction (2)Position of "Z" mark at the No 1 cylinder's beginning of injection (governor side) (3)B.T.D.C.: aa (set timing) (4)-
----------

----------
a=(180deg)




Information:

Changing Ether Cylinders
Ether is poisonous and flammable.Do not store replacement ether cylinders in living areas or in the operator's compartment.Do not smoke while changing ether cylinders.Use ether only in well ventilated areas.Use it with care to avoid fires.Keep the cylinders out of the reach of children.Avoid breathing ether vapors or repeated contact of ether with the skin.Do not store cylinders in direct sunlight.Do not puncture or burn the cylinders.Discard the cylinders in a safe place.
The ether cylinder is located at the right front of the machine, inside the guard. 1. Remove the two bolts to open the guard. 2. Loosen the clamp (1). Unscrew the cylinder (2). 3. Remove the used gasket and replace it with the new one provided with each new cylinder. 4. Install a new cylinder and tighten it hand tight. Tighten the clamp.5. Close the guard and install the retaining bolts.
Remove the ether cylinder before shipping the machine.
Draft Frame Arms
(631, 633, 637, 639)
Adjust
The draft frame arms and the scraper bowl can be in contact, but there must be no wear between them. Install wear shoe and shims, as needed, on the inside of draft frame arm. The clearance between the draft frame arm and the scraper bowl must not exceed .00 + 3.0 - .00 mm (.00 + .12 - .00 in).Refer to the Service Manual for your machine or contact your Caterpillar dealer for the correct adjustment procedures.

Have questions with 106991-1022?





Group cross 106991-1022 ZEXEL

Isuzu 

 
1156025000 
INJECTION-PUMP ASSEMBLY
12PD1-C
 
1156025001 
INJECTION-PUMP ASSEMBLY
12PD1-C
106991-1022  

106991-1025 
 
1156025002 
INJECTION-PUMP ASSEMBLY
12PD1-C
 
1156025003 
INJECTION-PUMP ASSEMBLY
12PD1-C
 
1156025004 
INJECTION-PUMP ASSEMBLY
12PD1-C
9 400 618 725 
1156025005 
INJECTION-PUMP ASSEMBLY
12PD1-C
Back to top