106971-5160 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1069715160


 

Information injection-pump assembly

ZEXEL 106971-5160 1069715160
106971-5160 INJECTION-PUMP ASSEMBLY
Rating:
63
Buy INJECTION-PUMP ASSEMBLY 106971-5160 zexel genuine, new aftermarket engine parts with delivery

Service parts 106971-5160 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106097-5742
3. GOVERNOR 105952-1920
4. SUPPLY PUMP 105237-4210
5. AUTOM. ADVANCE MECHANIS 105691-3821
6. COUPLING PLATE 105663-0830
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7651
11. Nozzle and Holder 16600-97160
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/22.6{230}
13. NOZZLE-HOLDER 105041-3150
14. NOZZLE
15. NOZZLE SET 105019-0591

Include in #1:

106971-5160 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106971-5160 
 
   
INJECTION-PUMP ASSEMBLY
14ZX Pump for Link Others




Information:

2. Remove covers (1) and (2) from the back side of the timing gear plate. 3. Remove the two bolts and clamp from location (X) that hold the crankshaft front seal adapter in position. Remove the crankshaft front seal adapter and front seal from the engine as a unit.4. Remove all bolts (3) that hold the timing gear cover in position on the engine. Remove timing gear cover (4) and the gasket from the engine.Install Timing Gear Cover
1. Put the gasket and timing gear cover (1) in position on the engine, and install the bolts that hold it. Tighten the two bolts at location (X) to a torque of 23 4 N m (17 3 lb ft).2. Put the crankshaft front seal adapter and seal in position in the timing gear cover. Install the clamp that holds it. 3. Put the gasket, cover (2) and clamp (3) in position. Install the bolts that hold them. Install the O-ring seal, cover (4) and the bolts that hold them.4. Trim the timing gear cover gasket so it is even with the bottom of the cylinder block.5. Put a thin coat of 3S6252 RTV Silicone Adhesive/Sealant to the bottom surface of the timing gear cover gasket. Remove the shims, and install the oil pan bolts. If it was necessary to remove the oil pan plate, see topic, "Remove & Install Oil Pan Plate". Install the oil pan plate.End By:a. install vibration damper and pulley (3306)b. install crankshaft pulley (3304)c. install gauge group (if equipped)d. install front supporte. install water pump

Have questions with 106971-5160?





Group cross 106971-5160 ZEXEL

106971-5160  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1680197011 
INJECTION-PUMP ASSEMBLY
RH10A
9 400 611 192 
1680197062 
INJECTION-PUMP ASSEMBLY
RH10A
F 01G 09U 0C8 
 
INJECTION-PUMP ASSEMBLY
RH10A

Nissan-Diesel 

9 400 618 712 
1680197072 
INJECTION-PUMP ASSEMBLY
RH10F
Back to top