106971-3122 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1069713122 220007182a


 

Information injection-pump assembly

ZEXEL 106971-3122 1069713122
HINO 220007182A 220007182a
106971-3122 INJECTION-PUMP ASSEMBLY
Rating:
71
Buy INJECTION-PUMP ASSEMBLY 106971-3122 zexel genuine, new aftermarket engine parts with delivery

Service parts 106971-3122 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106097-5590
3. GOVERNOR 105489-2792
4. SUPPLY PUMP 105237-1670
5. AUTOM. ADVANCE MECHANIS 105683-0020
6. COUPLING PLATE 105664-0461
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7271
11. Nozzle and Holder 23600-2300A
12. Open Pre:MPa(Kqf/cm2) 14.7{150}/21.6{220}
13. NOZZLE-HOLDER 105031-7230
14. NOZZLE
15. NOZZLE SET 105019-0070

Include in #1:

106971-3122 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106971-3122 1069713122
HINO 220007182A 220007182a


Zexel num
Bosch num
Firm num
Name
106971-3122 
106971-3123 
 
220007182A  HINO
INJECTION-PUMP ASSEMBLY
V22D A * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0820
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-10-9-4 -3-6-5-8 -7-2
Pre-stroke mm   4.8 4.74 4.8
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-10
deg.   27 26.75 27.25
Difference between angles 2
Cal 1-9
deg.   72 71.75 72.25
Difference between angles 3
Cal 1-4
deg.   99 98.75 99.25
Difference between angles 4
Cal 1-3
deg.   144 143.75 144.25
Difference between angles 5
Cal 1-6
deg.   171 170.75 171.25
Difference between angles 6
Cal 1-5
deg.   216 215.75 216.25
Difference between angles 7
Cal 1-8
deg.   243 242.75 243.25
Difference between angles 8
Cal 1-7
deg.   288 287.75 288.25
Difference between angles 9
Cyl.1-2
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   A
Rack position   8.5
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   123.5 121.5 125.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   8.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   125.2 122.2 128.2
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   8.7
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   124.4 121.4 127.4
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   E
Rack position   4.3+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   10.8 7.8 13.8
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_05
Adjusting point   G
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   161 161 181
Fixing the lever   *
Timer adjustment
Pump speed r/min   680--
Advance angle deg.   0 0 0
Load   1/4
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   630
Advance angle deg.   0.3
Load   1/4
Timer adjustment_03
Pump speed r/min   770--
Advance angle deg.   1 0.7 1.3
Load   4/4
Timer adjustment_04
Pump speed r/min   900+50
Advance angle deg.   1 0.7 1.3
Load   3/4
Timer adjustment_05
Pump speed r/min   1100-50
Advance angle deg.   5.25 4.95 5.55
Load   4/4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106971-3122
N:Pump speed R:Rack position (mm) (1)Lever ratio: RT (2)Target shim dimension: TH (3)Tolerance for racks not indicated: +-0.05mm. (4)Set idle at point K (N = N1, R = R1) and confirm that the injection quantity does not exceed Q1 at point J (N = N2). (5)Excess fuel setting for starting: SXL (6)Damper spring setting
----------
RT=0.8 TH=2.5mm N1=325r/min R1=4.3mm N2=1150r/min Q1=10mm3/st SXL=10.1+-0.1mm
----------

Speed control lever angle

Test data 106971-3122
F:Full speed
----------

----------
a=13.5deg+-5deg

0000000901

Test data 106971-3122
F:Full load I:Idle (1)Use the hole at R = aa (2)Stopper bolt setting
----------
aa=57.5mm
----------
a=39deg+-3deg b=17deg+-5deg

Stop lever angle

Test data 106971-3122
N:Pump normal S:Stop the pump.
----------

----------
a=16deg+-5deg b=64deg+-5deg

Timing setting

Test data 106971-3122
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(80deg)




Information:

(1) Crossbar (from 8B7548 Puller).(2) Spacer plate.(3) S1589 Bolt with two 1S379 Washers.(4) 1D4595 Bolt.(5) 3H465 Plate.(6) 1P2403 Dial Indicator.(7) 1P2394 Adapter Plate.(8) 1P2402 Gauge Body.Make reference to Cylinder Liner Projection in Testing and Adjusting for the complete procedure.1. Install gasket and spacer plate (2) with bolts (3) and two 1S379 Washers. Tighten bolts (3) evenly in four steps: 1st step ... 14 N m (10 lb ft)2nd step ... 35 N m (25 lb ft)3rd step ... 70 N m (50 lb ft)4th step ... 95 N m (70 lb ft)2. Install tools as shown. Tighten bolts (4) evenly in four steps: 1st step ... 7 N m (5 lb ft)2nd step ... 20 N m (15 lb ft)3rd step ... 35 N m (25 lb ft)4th step ... 70 N m (50 lb ft)3. Measure cylinder liner projection with dial indicator (6) in 1P2402 Gauge Body (8) as shown. Measure at four places around each cylinder liner near the clamped area. Cylinder liner projection measurements for any cylinder liner must be ... 0.033 to 0.175 mm (.0013 to .0069 in)Maximum permissible difference between all four measurements ... 0.05 mm (.002 in)Maximum permissible difference between average projection of any two cylinder liners next to each other ... 0.05 mm (.002 in)Maximum permissible difference between average projection of all cylinder liners under one cylinder head ... 0.08 mm (.003 in) If liner projection is not correct, turn the liner to a new position within the bore. If projection can not be corrected this way, move the liner to a different bore. If the projection can not be corrected this way, make reference to Special Instruction, Form No. FMO55228 for complete instructions on the use of 8S3140 Counterboring Tool Arrangement. 4. Minimum permissible depth to machine counterbore to adjust cylinder liner projection ... 0.76 mm (.030 in) Maximum permissible depth to machine counterbore to adjust cylinder liner projection ... 1.14 mm (.045 in) install a 0.76 mm (.030 in) shim plus any added shims necessary to get the correct cylinder liner projection. Be sure that the 0.76 mm (.030 in) shim is directly under the cylinder liner flange.

Have questions with 106971-3122?





Group cross 106971-3122 ZEXEL

Hino 

 
220007180A 
INJECTION-PUMP ASSEMBLY
V22D
 
220007181A 
INJECTION-PUMP ASSEMBLY
V22D
106971-3122  

106971-3123 
 
220007182A 
INJECTION-PUMP ASSEMBLY
V22D
9 400 619 696 
220007183A 
INJECTION-PUMP ASSEMBLY
V22D
F 01G 09U 0BW 
220007184A 
INJECTION-PUMP ASSEMBLY
V22D
9 400 618 690 
220007184B 
INJECTION-PUMP ASSEMBLY
V22D
9 400 618 690 
S220007184B 
INJECTION-PUMP ASSEMBLY
V22D
Back to top