106971-0910 ZEXEL 9 400 618 661 BOSCH INJECTION-PUMP ASSEMBLY 9400618661 1069710910 1671397168


 

Information injection-pump assembly

BOSCH 9 400 618 661 9400618661
ZEXEL 106971-0910 1069710910
NISSAN-DIESEL 1671397168 1671397168
106971-0910 INJECTION-PUMP ASSEMBLY
Rating:
39
Buy INJECTION-PUMP ASSEMBLY 106971-0910 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

BOSCH 9 400 618 661 9400618661
ZEXEL 106971-0910 1069710910
NISSAN-DIESEL 1671397168 1671397168


Zexel num
Bosch num
Firm num
Name
106971-0910 
106971-5000 
9 400 618 661 
1671397168  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
RE10TA06 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   10-9-4-3 -6-5-8-7 -2-1
Pre-stroke mm   3 2.95 3.05
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 10-9
deg.   45 44.5 45.5
Difference between angles 2
Cal 10-4
deg.   72 71.5 72.5
Difference between angles 3
Cal 10-3
deg.   117 116.5 117.5
Difference between angles 4
Cal 10-6
deg.   144 143.5 144.5
Difference between angles 5
Cal 10-5
deg.   189 188.5 189.5
Difference between angles 6
Cal 10-8
deg.   216 215.5 216.5
Difference between angles 7
Cal 10-7
deg.   261 260.5 261.5
Difference between angles 8
Cal 10-2
deg.   288 287.5 288.5
Difference between angles 9
Cal 10-1
deg.   333 332.5 333.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.8
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   192.2 190.2 194.2
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   3.6+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   17.8 15.8 19.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   11.8+-0. 1
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   215 205 225
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   (700)
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   1150
Advance angle deg.   3 2.5 3.5
Timer adjustment_03
Pump speed r/min   1250
Advance angle deg.   3.5 3.5 3.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106971-0910
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT: RAL (3)Set idle sub-spring (4)Damper spring setting: DL (5)Main spring setting
----------
K=11 RAL=11.8+-0.1mm DL=3.6-0.5-0.7mm
----------

Speed control lever angle

Test data 106971-0910
F:Full speed I:Idle S:Stop
----------

----------
a=11deg+-5deg b=32deg+-5deg c=32deg+-3deg

Stop lever angle

Test data 106971-0910
N:Pump normal S:Stop the pump.
----------

----------
a=(21deg)+-5deg b=36deg+-5deg

Timing setting

Test data 106971-0910
(1)Pump vertical direction (2)Position of the gear's standard threaded installation hole at the start of injection for the No. 10 cylinder. (3)- (4)-
----------

----------
a=(50deg)




Information:

Governor Actuator Mounting Replacement:
Removal Of The Previous Assembly
1. Disconnect linkage from cylinder and fuel pump, disassemble bracket from fuel pump lever.2. Remove cylinder from mounting plate, twist out rod end from cylinder.3. Remove mounting plate.Installing Of The New Linkage
1. Install 1433909, 8T4908, 8T4224, 9X6032, 8T4121 Linkage Assembly to engine block.2. Screw in U-joint of 1233885 Cylinder Rod as close as possible, tighten with 1426000 Nut, assemble cylinder with 8T1160 Bolts to the hinge.3. Assemble lever with washer and lock nut (1392085, 8T0389, 1392082, 8T4121), check free movement.4. Disconnect electrical connector from cylinder, turn on ignition, so that cylinder extends.5. Ensure pre-adjustment (overlapping of 1 mm) of U-joint and lever using the 8T4195 Stop Screw; tighten screw with nut (8T4133); See Illustration 2.6. Connect electrical connector to the cylinder and link up rod and lever with the 1233884 Pin.
Illustration 2Calibration
All adjustments have to be done with machine / engine at operating temperature
1. Start the engine.2. Plug-in PDT (portable diagnostic tool), choose menu "PROC" number 5 "ENGINE RPM" and number 6 "RPM DIFFERENCE". High And Low Idle Adjustment At Injection Pump:
1. Actuate the lever of the fuel injection pump by hand and adjust high and low idle by turning the corresponding stop screw at the fuel injection pump. If necessary fix the lever in the high idle position by use of a light spring to make adjustment easier:Set low idle to: 750 Rpm -20/+0 RpmSet high idle to : 2400 Rpm -0/+20 Rpm2. Make sure that when this is set a 1 mm spacer is fitted between the throttle lever and the high idle adjustment screw (see Illustration 3).3. Secure stop screw with locking nut. Seal setting with lockwire and lead seal, use your CAT dealer identification pliers.4. Disconnect electrical connector from the actuator (actuator piston extends completely).5. Stop the engine.6. Assemble and connect the 1413978 or 1397394, 9X8256, 1400277, 6V7743, 5C2890, 1107299, 1396903 Adjustable Rod, use the center hole at the fuel injection pump lever. Make sure that there is no contact between the fuel injection pump lever and the stop screw at high idle position.7. Start the engine.8. Adjust high idle setting with the rod:M312: high idle 2150 Rpm -0/+20 Rpm.M315: high idle 2400 Rpm -0/+20 Rpm.9. Secure the rod with the nuts at the ball joints.10. Mark the lock nut positions at the ball joints with a paint dot or using a felt-tip pen.11. Connect the electrical connector to the actuator.
Illustration 3Calibration/Adjustment Of The Engine
1. Press "F 1" key at the PDT for calibration.2. Choose item number 2 "CALIBRATION".3. Choose item number 1 "SPEED DIAL CAL".4. "MIN POSITION" setting, turn potentiometer on the panel until you receive the minimum voltage shown in the screen, press "ENTER".5. "MAX POSITION" setting, turn potentiometer until you receive maximum voltage shown in the screen, press "ENTER".6. You automatically get back into the previous menu, now choose number 2 "SPEED CAL".7. Change the low idle setting to 1020 Rpm by using the "UP- "or "DOWN-ARROW" keys at the PDT, when finished,

Have questions with 106971-0910?





Group cross 106971-0910 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 660 
1671397167 
INJECTION-PUMP ASSEMBLY
RF10
106971-0910  

106971-5000 
9 400 618 661 
1671397168 
INJECTION-PUMP ASSEMBLY
RE10TA06
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 444 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 662 
1671397169 
INJECTION-PUMP ASSEMBLY
RE10
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 552 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 663 
1671397170 
INJECTION-PUMP ASSEMBLY
RE10E
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 553 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 664 
1671397171 
INJECTION-PUMP ASSEMBLY
RF10
F 019 Z10 445 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 665 
1671397172 
INJECTION-PUMP ASSEMBLY
RF10E
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671397173 
INJECTION-PUMP ASSEMBLY
RE10
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 666 
1671397174 
INJECTION-PUMP ASSEMBLY
RE10
9 400 618 667 
1671397175 
INJECTION-PUMP ASSEMBLY
RF10
9 400 618 668 
1671397177 
INJECTION-PUMP ASSEMBLY
RD10TA06
Back to top