106961-6071 ZEXEL F 019 Z10 654 BOSCH INJECTION-PUMP ASSEMBLY f019z10654 1069616071 1156027541


 

Information injection-pump assembly

BOSCH F 019 Z10 654 f019z10654
ZEXEL 106961-6071 1069616071
ISUZU 1156027541 1156027541
106961-6071 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 106961-6071 zexel genuine, new aftermarket engine parts with delivery

Service parts 106961-6071 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106096-9520
3. GOVERNOR 105488-1710
4. SUPPLY PUMP 105237-4420
5. AUTOM. ADVANCE MECHANIS 105687-0430
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7851
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/22.1(225)
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-8200
15. NOZZLE SET

Include in #1:

106961-6071 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 654 f019z10654
ZEXEL 106961-6071 1069616071
ISUZU 1156027541 1156027541


Zexel num
Bosch num
Firm num
Name
106961-6071 
106961-6072 
F 019 Z10 654 
1156027541  ISUZU
INJECTION-PUMP ASSEMBLY
12PD1-N * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve (drive side)   134424-4320
Overflow valve opening pressure (drive side) kPa   255 221 289
Overflow valve opening pressure (drive side) kgf/cm2   2.6 2.25 2.95
Overflow valve (governor side)   134424-4320
Overflow valve opening pressure (governor side) kPa   255 221 289
Overflow valve opening pressure (governor side) kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-9-8- 5-2-11-1 0-3-6-7-
Pre-stroke mm   4.4 4.37 4.43
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   15 14.75 15.25
Difference between angles 2
Cal 1-9
deg.   60 59.75 60.25
Difference between angles 3
Cal 1-8
deg.   75 74.75 75.25
Difference between angles 4
Cal 1-5
deg.   120 119.75 120.25
Difference between angles 5
Cyl.1-2
deg.   135 134.75 135.25
Difference between angles 6
Cal 1-11
deg.   180 179.75 180.25
Difference between angles 7
Cal 1-10
deg.   195 194.75 195.25
Difference between angles 8
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 9
Cal 1-6
deg.   255 254.75 255.25
Difference between angles 10
Cal 1-7
deg.   300 299.75 300.25
Difference between angles 11
Cal 1-12
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   A
Rack position   8.3
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   96.1 94.6 97.6
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   8.6
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   96.8 94.8 98.8
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   7.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   101.1 99.1 103.1
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   5.2+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   8.8 7.5 10.1
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Timer adjustment
Pump speed r/min   600--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   550
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   830+-30
Advance angle deg.   2 1.5 2.5
Timer adjustment_04
Pump speed r/min   -
Advance angle deg.   2 1.5 2.5
Remarks
Measure the actual speed.
 
Timer adjustment_05
Pump speed r/min   1100
Advance angle deg.   5.5 5 6
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106961-6071
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Damper spring setting
----------

----------

Speed control lever angle

Test data 106961-6071
F:Full speed
----------

----------
a=7deg+-5deg

0000000901

Test data 106961-6071
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=31deg+-3deg

Stop lever angle

Test data 106961-6071
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=25mm
----------
a=64deg+-5deg b=51deg+-5deg

Timing setting

Test data 106961-6071
(1)Pump vertical direction (2)Position of "Z" mark at the No 1 cylinder's beginning of injection (governor side) (3)B.T.D.C.: aa (set timing) (4)-
----------
aa=8deg
----------
a=(180deg)




Information:


Climbing equipment may be required to access this service point. Refer to the Operation and Maintenance Manual, "Mounting and Dismounting" topic for safety information.
Before servicing/performing maintenance on the machine, electrical power must be physically disconnected; battery plugs must be disconnected from the batteries, or the trailing cable must be unplugged, and warning tags and padlocks shall be applied by a certified electrician. Certified electricians shall perform or direct any electrical work, including any energized testing, repair work in controllers, motors, or other approved compartments, and shall insure that all compartments are properly closed and inspected prior to re-energization. All applicable lock out and tag out procedures must be followed.
Observe the safe working load limits of all lifting and blocking devices and keep a safe distance from suspended/blocked loads. Personnel may be seriously injured or killed by falling loads.
Required Parts
The LFI component PMMA surface characteristics are as follows
Cover Layer
Gloss
Scratch resistance
Weather resistance
Color Layer
Coloring
Ultraviolet resistance
Carrier Layer
Adhesion to backing foam
Heat deformation resistance
Backing Foam
Strength
Stability
Impact resistance
Heat deformation resistanceRepair Procedure
Illustration 1 g06509785
Simulated punch hole
Illustration 2 g06509787
Location to grind off backside
Grind material off from backside
Illustration 3 g06509788
Fiberglass mat and plastic filler
Place fiberglass mat and place plastic filler on backside
Illustration 4 g06509791
Location to grind off exterior side
Grind material off from exterior side
Illustration 5 g06509792
Location to add filler on exterior side
Fill hole on exterior side with plastic filler
Illustration 6 g06510059
Exterior surface to grind flat
Grind plastic filler on exterior to achieve flat surface
Illustration 7 g06510075
Area to apply plasticiser
Apply plastic filler with plasticiser to the exterior
Illustration 8 g06510079
Exterior area to grind plastic filler containing plasticiser
Grind plastic filler containing plasticiser and also area to be painted
Illustration 9 g06510084
Exterior plastic surface painted with primer
Paint exterior with primer for plastic surfaces
Illustration 10 g06510086
Exterior plastic surface painted with top coat
Paint exterior with top coat

Have questions with 106961-6071?





Group cross 106961-6071 ZEXEL

Isuzu 

F 019 Z10 653 
1156027540 
INJECTION-PUMP ASSEMBLY
12PD1-N
106961-6071  

106961-6072 
F 019 Z10 654 
1156027541 
INJECTION-PUMP ASSEMBLY
12PD1-N
 
1156030080 
INJECTION-PUMP ASSEMBLY
12PD1-N
9 400 611 054 
1156030081 
INJECTION-PUMP ASSEMBLY
12PD1-N
F 019 Z10 212 
1156030082 
INJECTION-PUMP ASSEMBLY
12PD1-N
9 400 618 603 
1156030083 
INJECTION-PUMP ASSEMBLY
12PD1-N
Back to top