106961-1573 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1069611573 1156017326


 

Information injection-pump assembly

ZEXEL 106961-1573 1069611573
ISUZU 1156017326 1156017326
106961-1573 INJECTION-PUMP ASSEMBLY
Rating:
78
Buy INJECTION-PUMP ASSEMBLY 106961-1573 zexel genuine, new aftermarket engine parts with delivery

Service parts 106961-1573 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106096-9251
3. GOVERNOR 105488-0442
4. SUPPLY PUMP 105237-1390
5. AUTOM. ADVANCE MECHANIS 105687-0181
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7192
11. Nozzle and Holder 1-15300-163-2
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/22.1{225}
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-6651
15. NOZZLE SET

Include in #1:

106961-1573 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106961-1573 
106961-1577 
 
1156017326  ISUZU
INJECTION-PUMP ASSEMBLY
12PC1 *




Information:

Introduction
Do not perform any procedure in this Special Instruction until you read this information and you understand this information.This Special Instruction provides the following information for 3600 Diesel Engines:
Identification of a service tool
A procedure to check cylinder pressureService Tool
Illustration 1 g01250874
4C-6585 Indicator Group (1) Hand tool for tightening gauge connectionProcedure for Checking Cylinder Pressure
Take the readings for cylinder pressure at the rated speed and at the rated load in order to obtain the peak cylinder pressure for a specific rating.Readings for cylinder pressure can also be taken at a light load condition or at a no-load condition. These pressure readings can be used as a baseline for a comparison at a later date. For a valid comparison, pressure measurements that are taken at a later date must duplicate the initial load conditions.
Illustration 2 g01250892
(2) Cylinder pressure valve (Kiene valve) (3) Valve stem (4) Cap
Remove cap (4) from valve (2) .
Fluids may escape from the cylinder pressure valves at high velocity during this procedure and cause personal injury. Always stay clear and keep personnel away from the cylinder pressure valves during this procedure.
Stand to the side of the valve and open valve stem (3) approximately 90° (1/4 turn) counterclockwise. Close valve stem (3). This will blow any foreign debris out of the valve.
Illustration 3 g01250917
(5) 4C-9736 Pressure Gauge (6) 4C-9737 Gauge connection
Install the 4C-6585 Indicator group on the valve. Use tool (1) that is provided in the indicator group in order to tighten gauge connection (6) to a torque of 17 3 N m (12 2 lb ft). Do not overtighten the gauge connection.
Open valve stem (3) by approximately 540° (1 1/2 turn) counterclockwise. Document the reading on pressure gauge (5) and close valve stem (3). Tighten the valve stem to a torque of 24 3 N m (18 2 lb ft). Do not overtighten the valve stem.
Use the hand tool that is provided in the indicator group in order to loosen the gauge connection. Remove the 4C-6585 Indicator Group .
Install cap (4). Tighten to a torque of 17 3 N m (12 2 lb ft). Do not overtighten the cap.

Have questions with 106961-1573?





Group cross 106961-1573 ZEXEL

Isuzu 

 
1156017322 
INJECTION-PUMP ASSEMBLY
12PC1
 
1156017324 
INJECTION-PUMP ASSEMBLY
12PC1
 
 
INJECTION-PUMP ASSEMBLY
12PC1
106961-1573  

106961-1577 
 
1156017326 
INJECTION-PUMP ASSEMBLY
12PC1
 
1156017327 
INJECTION-PUMP ASSEMBLY
12PC1
 
1156017328 
INJECTION-PUMP ASSEMBLY
12PC1
 
1156017329 
INJECTION-PUMP ASSEMBLY
12PC1
 
1156034630 
INJECTION-PUMP ASSEMBLY
12PC1
Back to top