106891-1363 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068911363 1156027712


 

Information injection-pump assembly

ZEXEL 106891-1363 1068911363
ISUZU 1156027712 1156027712
106891-1363 INJECTION-PUMP ASSEMBLY
Rating:
74
Buy INJECTION-PUMP ASSEMBLY 106891-1363 zexel genuine, new aftermarket engine parts with delivery

Service parts 106891-1363 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106089-9150
3. GOVERNOR 105488-2110
4. SUPPLY PUMP 105237-4420
5. AUTOM. ADVANCE MECHANIS 105687-0461
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7851
11. Nozzle and Holder 1-15300-204-1
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/22.1{225}
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-8200
15. NOZZLE SET

Include in #1:

106891-1363 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106891-1363 
106891-1364 
 
1156027712  ISUZU
INJECTION-PUMP ASSEMBLY
8PD1-S * K




Information:

2. Turn the crankshaft until two pistons are at bottom center.3. Remove nuts (1) and the bearing caps. Push the rods and pistons up until the rings are out of the cylinder liners. 4. Remove pistons (2) and connecting rods from the cylinder liners.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.Install Pistons And Connecting Rod Assemblies
1. Put clean engine oil on piston rings, connecting rod bearings and cylinder liners. 2. Use tool (A), and install piston (2) and the connecting rod in the cylinder liner. Be sure the number on the tab groove side of the connecting rod is on the opposite side from the camshaft.3. Install the bearing cap on the connecting rod with the number on the side of the bearing cap on the same side and same number as on the connecting rod.4. Put 2P2506 Thread Lubricant on the threads of the bolts. Install the nuts, and tighten them to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120°.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.End By:a. install oil pumpb. install cylinder head assembly.Disassemble & Assemble Pistons And Connecting Rod Assemblies
Start By:a. remove pistons and connecting rod assemblies 1. Remove bearings (3) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) and tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See, Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295.5. Heat connecting rod (4) in an oven to a temperature of 177° to 260°C (350° to 500°F). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter part of tooling (C). The old bearing is pushed out by tooling (C) as the new bearing is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 50.830 0.008 mm (2.0012 .0003 in.).9. Check the clearance between the ends of the piston rings. See the topic, Pistons and Rings in the Specifications manual.10. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint.11. Install the oil ring on the piston with tool (B).12. Install the second (intermediate) piston ring with the side that

Have questions with 106891-1363?





Group cross 106891-1363 ZEXEL

Isuzu 

 
1156027710 
INJECTION-PUMP ASSEMBLY
8PD1-S
 
1156027711 
INJECTION-PUMP ASSEMBLY
8PD1-S
F 019 Z10 441 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

106891-1363  

106891-1364 
 
1156027712 
INJECTION-PUMP ASSEMBLY
8PD1-S
9 400 618 550 
1156027713 
INJECTION-PUMP ASSEMBLY
8PD1-S
Back to top