106891-1282 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068911282 1156026572


 

Information injection-pump assembly

ZEXEL 106891-1282 1068911282
ISUZU 1156026572 1156026572
106891-1282 INJECTION-PUMP ASSEMBLY
Rating:
35
Buy INJECTION-PUMP ASSEMBLY 106891-1282 zexel genuine, new aftermarket engine parts with delivery

Service parts 106891-1282 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106089-9071
3. GOVERNOR 105488-1380
4. SUPPLY PUMP 105237-1940
5. AUTOM. ADVANCE MECHANIS 105687-0322
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7851
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/22.1(225)
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-8200
15. NOZZLE SET

Include in #1:

106891-1282 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106891-1282 
106891-1283 
 
1156026572  ISUZU
INJECTION-PUMP ASSEMBLY
8PD1-RAT * K




Information:

Start By:a. remove cylinder headb. remove front and rear housingsc. remove rear seal and carrierd. remove pistons and connecting rods 1. Remove bolts (1), remove main bearing caps (2) and remove thrust bearings (3) from the center main. Caps are identified by numbers one through seven. Unmarked caps should be marked by stamping the appropriate number toward the right side of the bottom surface prior to removal. 2. Install two bolts and nylon strap (4) then carefully, remove the crankshaft. The approximate weight of the crankshaft is 129 kg (284 lb).3. Remove the upper portions of the main bearings. The following steps are for the installation of the crankshaft. Be sure main bearing tabs engage the grooves in the block and cap.4. Position the upper portion of the main bearings in the block and the lower main bearing portion in caps (2). Make sure everything is clean and only the bearing face is lubricated with engine oil.5. Position the crankshaft. 6. Install thrust bearings (3).7. Install main bearing caps (2) with the part numbers toward the right hand side of the cylinder block. Take care to insure the caps are numbered one through seven from the front of the engine. Put engine oil or molylube on the bolt threads and the washer face, then install bolts (1). Tighten the bolts on the side where the main bearing tabs are located to a torque of 95 5 N m (70 4 lb ft). Tighten the bolts on the opposite side to a torque of 95 5 N m (70 4 lb ft).8. Put a mark on each bolt head and the bearing caps. Turn the bolts that are opposite the main bearing tabs an additional 90° 5° turn. Then turn the bolts on the side where the main bearing tabs are located an additional 90° 5° turn.
Typical Example9. Use tooling (A) to measure crankshaft end play. The crankshaft end play must be 0.1 to 0.5 mm (.004 to .020 in).End By:a. install pistons and connecting rodsb. install rear seal and carrierc. install rear seal and carrierd. install cylinder head

Have questions with 106891-1282?





Group cross 106891-1282 ZEXEL

Isuzu 

 
1156026570 
INJECTION-PUMP ASSEMBLY
8PD1-RAT
 
1156026571 
INJECTION-PUMP ASSEMBLY
8PD1-RAT
106891-1282  

106891-1283 
 
1156026572 
INJECTION-PUMP ASSEMBLY
8PD1-RAT
 
1156026573 
INJECTION-PUMP ASSEMBLY
8PD1-RAT
9 400 618 543 
1156026574 
INJECTION-PUMP ASSEMBLY
8PD1-RAT
Back to top