106873-3241 ZEXEL F 01G 09U 0AZ BOSCH INJECTION-PUMP ASSEMBLY f01g09u0az 1068733241


 

Information injection-pump assembly

BOSCH F 01G 09U 0AZ f01g09u0az
ZEXEL 106873-3241 1068733241
106873-3241 INJECTION-PUMP ASSEMBLY
Rating:
28
Buy INJECTION-PUMP ASSEMBLY 106873-3241 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

BOSCH F 01G 09U 0AZ f01g09u0az
ZEXEL 106873-3241 1068733241


Zexel num
Bosch num
Firm num
Name
106873-3241 
106873-3242 
F 01G 09U 0AZ 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0820
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-6-2- 7-5-4-3
Pre-stroke mm   4.5 4.44 4.5
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-6
deg.   90 89.75 90.25
Difference between angles 3
Cyl.1-2
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-7
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-4
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-3
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   -
Rack position   12.7
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   118.5 115.5 121.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   8.5+-0.5
Pump speed r/min   250 250 250
Average injection quantity mm3/st.   11 8 14
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.7)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   118.5 116.5 120.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.4
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   126 120 132
Fixing the lever   *
Timer adjustment
Pump speed r/min   600--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   550
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   (620)
Advance angle deg.   1 0.7 1.3
Timer adjustment_04
Pump speed r/min   900+50
Advance angle deg.   1 0.7 1.3
Timer adjustment_05
Pump speed r/min   1100-50
Advance angle deg.   3 2.7 3.3
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106873-3241
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Stop lever's normal position setting: R1
----------
T1=AA24 R1=(18)mm
----------

Speed control lever angle

Test data 106873-3241
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=79mm
----------
a=12deg+-5deg b=28.5deg+-3deg

Stop lever angle

Test data 106873-3241
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Set the stopper screw. (After setting, apply red paint.) (3)Speed = bb, rack position = cc (4)Set the stopper screw. (After setting, apply red paint.) (5)Use the hole above R = dd
----------
aa=(18)mm bb=0r/min cc=1.5+-0.3mm dd=35mm
----------
a=35deg+-5deg b=15deg+-5deg

Timing setting

Test data 106873-3241
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(80deg)




Information:

This manual contains safety, operation instructions, lubrication and maintenance information.Some photographs or illustrations in this publication show details or attachments that may be different from your engine. Guards and covers may have been removed for illustrative purposes.Continuing improvement and advancement of product design may have caused changes to your engine which are not included in this publication.Read - study - and keep it handy. Whenever a question arises regarding your engine, or this publication, please consult your Caterpillar dealer for the latest available information.Safety
The safety section lists basic safety precautions. In addition, this section identifies the text and locations of warning labels used on the engine.Read and understand the basic precautions listed in the safety section before operating or performing lubrication, maintenance and repair on this product.Operation
Illustrations guide the operator through correct procedures of checking, starting, operating and stopping the engine.The operation section is a reference for the new operator and a refresher for the experienced one.The operating sections outlined in this publication are organized to assist you with developing the skills and techniques required to operate your engine more efficiently and economically.Maintenance
The maintenance section is a guide to equipment care. The illustrated, step-by-step instructions are grouped by Preventive Maintenance servicing intervals. Items in the "Maintenance Management Schedule" are referenced to detailed instructions that follow.The "Maintenance Management Schedule" items are organized for a Preventive Maintenance Program.If the Preventive Maintenance Program is followed, a periodic tune-up is not required. The implementation of a Preventive Maintenance Management Program should minimize operating costs through cost avoidances resulting from reductions in unscheduled downtime and failures.Maintenance Intervals
The service interval for each item listed in the "Maintenance Management Schedule" is primarily based on the item and its relationship to either engine speed or load.We recommend that these schedules be reproduced for ease of inspection. We also recommend that a maintenance record be maintained as part of the equipment's permanent record.See the "Maintenance Log" section of this publication for information regarding documents that are generally accepted as proof of maintenance or repair.Your authorized Caterpillar dealer can assist you in tailoring your schedule to meet the needs of your operating environment.

Have questions with 106873-3241?





Group cross 106873-3241 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220801590A 
INJECTION-PUMP ASSEMBLY
F20C-B
9 400 618 425 
220801590B 
INJECTION-PUMP ASSEMBLY
F20C-B
 
 
INJECTION-PUMP ASSEMBLY
F20C
 
 
INJECTION-PUMP ASSEMBLY
F20C
 
220008140B 
INJECTION-PUMP ASSEMBLY
F20C
 
220008140C 
INJECTION-PUMP ASSEMBLY
F20C
F 01G 09U 0AY 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 618 426 
220008140D 
INJECTION-PUMP ASSEMBLY
F20C
 
220008160B 
INJECTION-PUMP ASSEMBLY
F20C
106873-3241  

106873-3242 
F 01G 09U 0AZ 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 618 427 
220008160C 
INJECTION-PUMP ASSEMBLY
F20C
9 400 618 428 
220204300A 
INJECTION-PUMP ASSEMBLY
EF750T
9 400 618 429 
220008340A 
INJECTION-PUMP ASSEMBLY
F17C
 
220400514A 
INJECTION-PUMP ASSEMBLY
YF94
 
220400514B 
INJECTION-PUMP ASSEMBLY
YF94
9 400 619 812 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220400521B 
INJECTION-PUMP ASSEMBLY
YF95
 
220008600A 
INJECTION-PUMP ASSEMBLY
F17D
 
220008601A 
INJECTION-PUMP ASSEMBLY
F17D-1
 
220008602A 
INJECTION-PUMP ASSEMBLY
F17D-1
 
220008603A 
INJECTION-PUMP ASSEMBLY
F17D-1
F 01G 09U 0B0 
 
INJECTION-PUMP ASSEMBLY
F 01G 09U 0B1 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 618 430 
220008604A 
INJECTION-PUMP ASSEMBLY
F17D-1
Back to top