106873-3113 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068733113 220007891b


 

Information injection-pump assembly

ZEXEL 106873-3113 1068733113
HINO 220007891B 220007891b
106873-3113 INJECTION-PUMP ASSEMBLY
Rating:
84
Buy INJECTION-PUMP ASSEMBLY 106873-3113 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106873-3113 
106873-3114 
 
220007891B  HINO
INJECTION-PUMP ASSEMBLY
F20C-B * K




Information:

USE FUEL CONSUMPTION, SERVICE HOURS OR TIME INTERVAL, WHICHEVER OCCURS FIRST. Performance of all lubrication and maintenance items in the Maintenance Schedule is the owners' responsibility.Daily
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 18 950 L (5000 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 37 900 L (10,000 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 151 600 L (40,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 341 100 L (90,000 gal) of Fuel or 2250 Hours*
Connecting Rod Bearings - ReplaceEvery 454 800 L (120,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.

Have questions with 106873-3113?





Group cross 106873-3113 ZEXEL

Hino 

 
220007890A 
INJECTION-PUMP ASSEMBLY
F20C-B
 
220007891A 
INJECTION-PUMP ASSEMBLY
F20C-B
 
 
INJECTION-PUMP ASSEMBLY

Hino 

106873-3113  

106873-3114 
 
220007891B 
INJECTION-PUMP ASSEMBLY
F20C-B
9 400 618 416 
220007891C 
INJECTION-PUMP ASSEMBLY
F20C-B
Back to top