Information injection-pump assembly
BOSCH
9 400 613 137
9400613137
ZEXEL
106873-2550
1068732550
MITSUBISHI
ME098649
me098649

Rating:
Service parts 106873-2550 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME066565
12.
Open Pre:MPa(Kqf/cm2)
17.7{180}/21.6{220}
15.
NOZZLE SET
Include in #1:
106873-2550
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 613 137
9400613137
ZEXEL
106873-2550
1068732550
MITSUBISHI
ME098649
me098649
Zexel num
Bosch num
Firm num
Name
106873-2550
9 400 613 137
ME098649 MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC9T2 K 14CD INJECTION PUMP ASSY PE8P PE
8DC9T2 K 14CD INJECTION PUMP ASSY PE8P PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
131424-4620
Overflow valve opening pressure
kPa
255
255
255
Overflow valve opening pressure
kgf/cm2
2.6
2.6
2.6
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-2-7-3-
4-5-6-8
Pre-stroke
mm
4.8
4.75
4.85
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cyl.1-2 deg. 45 44.5 45.5
Cyl.1-2 deg. 45 44.5 45.5
Difference between angles 2
Cal 1-7 deg. 90 89.5 90.5
Cal 1-7 deg. 90 89.5 90.5
Difference between angles 3
Cal 1-3 deg. 135 134.5 135.5
Cal 1-3 deg. 135 134.5 135.5
Difference between angles 4
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 5
Cal 1-5 deg. 225 224.5 225.5
Cal 1-5 deg. 225 224.5 225.5
Difference between angles 6
Cal 1-6 deg. 270 269.5 270.5
Cal 1-6 deg. 270 269.5 270.5
Difference between angles 7
Cal 1-8 deg. 315 314.5 315.5
Cal 1-8 deg. 315 314.5 315.5
Injection quantity adjustment
Adjusting point
-
Rack position
11.4
Pump speed
r/min
700
700
700
Each cylinder's injection qty
mm3/st.
156
151
161
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
C
Rack position
6.1+-0.5
Pump speed
r/min
225
225
225
Each cylinder's injection qty
mm3/st.
20
17
23
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(11.4)
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
156
155
157
Basic
*
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1(11.4)
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
164
157
171
Difference in delivery
mm3/st.
14
14
14
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_05
Adjusting point
D
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
130
90
170
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
650
650
650
Rack position
R2[R1-1.
5]
Boost pressure
kPa
8
8
8
Boost pressure
mmHg
60
60
60
Boost compensator adjustment_02
Pump speed
r/min
650
650
650
Rack position
R1-0.6
Boost pressure
kPa
12
10.7
13.3
Boost pressure
mmHg
90
80
100
Boost compensator adjustment_03
Pump speed
r/min
650
650
650
Rack position
R1(11.4)
Boost pressure
kPa
20
13.3
26.7
Boost pressure
mmHg
150
100
200
Timer adjustment
Pump speed
r/min
(900+-50
)
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1100
Advance angle
deg.
4
3.5
4.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Lever ratio: RT
(2)Target shim dimension: TH
(3)Tolerance for racks not indicated: +-0.05mm.
(4)Boost compensator cancel stroke: BSL
(5)Boost compensator stroke
(6)Damper spring setting
(7)When air cylinder is operating.
----------
RT=1 TH=2mm BSL=1.6mm
----------
----------
RT=1 TH=2mm BSL=1.6mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Set the pump speed at aa
(2)Set the pump speed at bb.
(3)Stopper bolt setting
(4)Stopper bolt setting
----------
aa=1250r/min bb=370r/min
----------
a=18deg+-5deg b=(11.5deg)+-5deg
----------
aa=1250r/min bb=370r/min
----------
a=18deg+-5deg b=(11.5deg)+-5deg
0000000901

F:Full load
I:Idle
(1)Stopper bolt setting
----------
----------
a=10deg+-5deg b=31.5deg+-3deg
----------
----------
a=10deg+-5deg b=31.5deg+-3deg
Stop lever angle

N:Engine manufacturer's normal use
S:Stop the pump.
(1)Rack position = aa
(2)Stopper bolt setting
(3)Rack position bb
(4)Free (at shipping)
----------
aa=4-0.5mm bb=14.6mm
----------
a=43deg+7deg-5deg b=30deg+-5deg c=(10.5deg)
----------
aa=4-0.5mm bb=14.6mm
----------
a=43deg+7deg-5deg b=30deg+-5deg c=(10.5deg)
0000001501 MICRO SWITCH
Adjustment of the micro-switch
Adjust the bolt to obtain the following lever position when the micro-switch is ON.
(1)Speed N1
(2)Rack position Ra
----------
N1=325r/min Ra=5.6+-0.1mm
----------
----------
N1=325r/min Ra=5.6+-0.1mm
----------
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(40deg)
----------
----------
a=(40deg)
Information:
2. Remove bolts (1) from the alternator bracket.3. Remove the bolts that hold plate (3), and remove the plate.4. Disconnect water line (2) from the air compressor. Turn the water line tee toward the lifting bracket in order to provide clearance to remove the head bolt. 5. Remove bolts (4) and (5) that hold the cylinder head assembly to the cylinder block.6. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
7. Remove the gasket, seals (6) and O-ring seals (7) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See Remove And Install Spacer Plate.8. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (6) and two O-ring seals (7).9. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 10. Put Loctite Nickel Anti-Seize on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 14 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 14 in number sequence to a torque of 470 20 N m (345 15 lb.ft.).c. Tighten bolts 1 through 14 in number sequence to a torque of 470 20 N m (345 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 15 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 15 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 15 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the bolts (5) to a torque of 45 7 N m (33 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 35 5 N m (26 3 lb.ft.).11. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).12. Install the valve cover bases and the inner fuel lines. See Install Rocker Shaft Assemblies And Push Rods.13. Install the valve covers. See Install Valve Covers.14. Install plate (3).15. Connect water line (2) to the air compressor.16. Install bolts (1) for the alternator bracket.17. Install the intake manifold on the
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
7. Remove the gasket, seals (6) and O-ring seals (7) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See Remove And Install Spacer Plate.8. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (6) and two O-ring seals (7).9. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 10. Put Loctite Nickel Anti-Seize on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 14 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 14 in number sequence to a torque of 470 20 N m (345 15 lb.ft.).c. Tighten bolts 1 through 14 in number sequence to a torque of 470 20 N m (345 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 15 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 15 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 15 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the bolts (5) to a torque of 45 7 N m (33 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 35 5 N m (26 3 lb.ft.).11. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).12. Install the valve cover bases and the inner fuel lines. See Install Rocker Shaft Assemblies And Push Rods.13. Install the valve covers. See Install Valve Covers.14. Install plate (3).15. Connect water line (2) to the air compressor.16. Install bolts (1) for the alternator bracket.17. Install the intake manifold on the
Have questions with 106873-2550?
Group cross 106873-2550 ZEXEL
Mitsubishi
Mitsubishi
Mitsubishi
106873-2550
9 400 613 137
ME098649
INJECTION-PUMP ASSEMBLY
8DC9T2
8DC9T2