106873-2162 ZEXEL F 019 Z10 013 BOSCH INJECTION-PUMP ASSEMBLY f019z10013 1068732162


 

Information injection-pump assembly

BOSCH F 019 Z10 013 f019z10013
ZEXEL 106873-2162 1068732162
106873-2162 INJECTION-PUMP ASSEMBLY
Rating:
74
Buy INJECTION-PUMP ASSEMBLY 106873-2162 zexel genuine, new aftermarket engine parts with delivery

Service parts 106873-2162 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7800
3. GOVERNOR 105489-2250
4. SUPPLY PUMP 105207-1140
5. AUTOM. ADVANCE MECHANIS 105681-0921
6. COUPLING PLATE 105663-0390
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7972
11. Nozzle and Holder ME091276
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-5000
14. NOZZLE 105015-9440
15. NOZZLE SET

Include in #1:

106873-2162 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 013 f019z10013
ZEXEL 106873-2162 1068732162


Zexel num
Bosch num
Firm num
Name
106873-2162 
106873-2163 
F 019 Z10 013 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   10.7
Pump speed r/min   650 650 650
Each cylinder's injection qty mm3/st.   133.5 129.5 137.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.2+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   17.5 14.9 20.1
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.7)
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   133.5 132.5 134.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.15
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   141.6 137.6 145.6
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 100 180
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   900--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   850
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1100
Advance angle deg.   4.5 4 5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106873-2162
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Lever ratio: RT (4)Target shim dimension: TH (5)Tolerance for racks not indicated: +-0.05mm. (6)Excess fuel setting for starting: SXL (7)Damper spring setting (8)When air cylinder is operating.
----------
RT=1 TH=2.7mm SXL=13.8+-0.1mm
----------

Speed control lever angle

Test data 106873-2162
F:Full speed I:Idle (1)- (2)Air cylinder's adjustable range (3)Pump speed = aa (4)Pump speed = bb (5)Pump speed cc
----------
aa=1160r/min bb=275r/min cc=710r/min
----------
a=(11.5deg) b=(11.5deg)+-5deg c=(19.5deg)+-5deg d=4deg+-5deg

0000000901

Test data 106873-2162
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=28deg+-3deg

Stop lever angle

Test data 106873-2162
S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Free (at shipping)
----------
aa=4.1-0.5mm
----------
a=10.5deg+-5deg b=55.5deg+7deg-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=5.7+-0.1mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 106873-2162
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

Timing setting

Test data 106873-2162
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(40deg)




Information:

Start By:a. remove governor **See Disassemble Governor story
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove the bolts and the plate from the side of the fuel injection pump housing. 2. Install tool (A) in the fuel injection pump housing. Move the rack until tool (A) can be installed to hold the rack in the center position to remove the fuel injection pumps.3. Use tool (B) to remove bushing (1).4. Remove the O-ring seal from the fuel injection pump housing. 5. Install tool (C) on the bonnet and remove the fuel injection pump. 6. Remove spacer (2). Keep the spacers (2) from the fuel injection pumps together with identification as to their location in the pump housing.7. Perform steps 3 through 6 to remove the other fuel injection pumps. The following steps are to install the fuel injection pumps.8. Install spacer (2).9. Install tool (A). Move the rack until tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to install the fuel injection pumps.10. Turn camshaft until the lobe of the camshaft is down for the pump to be installed.11. Install tool (C) on the bonnet on the fuel injection pump.12. Install the fuel injection pump in the pump housing with saw cut slot in the gear in alignment with the small pin and groove in the barrel in alignment with dowel in the pump housing.13. Put clean oil on O-ring seal and install it in the fuel injection pump housing.14. Install the bushing by hand until the bushing is even with the top of the housing. If the bushing can not be installed this far by hand, remove it. Remove the fuel injection pump ad put the pump in alignment again and install the bushing again.15. Install tool (B) on the bushing and tighten the bushing to a torque of 190 14 N m (140 10 lb ft).16. Install tooling (D) to measure total rack travel. Correct rack travel is 15.7 mm (.618 in). A smaller measurement is an indication of improper fuel injection pump installation.17. Perform Steps 1 through 9 to install the other fuel pumps18. Install the cover and gasket on the fuel injection pump housing.End By:a. install governor **See Assemble Governor storyDisassemble And Assemble Fuel Injection Pumps
Start By:a. remove fuel injection pumps
When the injection pumps are disassembled, handle the parts carefully. Do not damage the surfaces of the plungers, barrels and bonnets. Any scratches will cause leakage inside the fuel injection pump. The plunger and barrel for each pump are made as a set. Do not intermix the plunger of one pump in the barrel with another pump. If one part is worn, install a complete new pump assembly. Be careful when placing the plunger into the bore of the barrel.
1. Pull plunger (1) and washer (5) out of barrel (3) and spring (2).
Do not remove the gear from

Have questions with 106873-2162?





Group cross 106873-2162 ZEXEL

Mitsubishi 

9 400 618 334 
ME091556 
INJECTION-PUMP ASSEMBLY
8DC10
9 400 612 010 
ME091557 
INJECTION-PUMP ASSEMBLY
8DC11
9 400 618 335 
ME091574 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 336 
ME091524 
INJECTION-PUMP ASSEMBLY
8DC8
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 337 
ME091525 
INJECTION-PUMP ASSEMBLY
8DC9
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 338 
ME091526 
INJECTION-PUMP ASSEMBLY
8DC10
106873-2162  

106873-2163 
F 019 Z10 013 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 339 
ME091527 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 340 
ME091629 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 618 341 
ME098625 
INJECTION-PUMP ASSEMBLY
8DC9TC
 
ME442519 
INJECTION-PUMP ASSEMBLY
8DC9TC
F 019 Z20 292 
ME442586 
INJECTION-PUMP ASSEMBLY
8DC9T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 342 
ME091686 
INJECTION-PUMP ASSEMBLY
8DC11
Back to top